My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Financial- Salem, City of (Streetscape)
>
CS_Courthouse Square
>
Financial- Salem, City of (Streetscape)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 3:34:12 PM
Creation date
9/7/2011 2:41:38 PM
Metadata
Fields
Template:
Building
RecordID
10225
Title
Financial- Salem, City of (Streetscape)
Company
Marion County
BLDG Date
12/24/1997
Building
Courthouse Square
BLDG Document Type
Finance
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ ' PENCEIi~EL~l~ ~~NS~RUGTION, ING. <br />~ <br />P~OJ@Ct: COURTHOUSE S~UARE "STREETSCAPE ALT. # 1" <br />Estimate Type: Preliminary Budget <br />Location: High and Court Streets <br />Attention: Marion County/Salem Area Transit <br />Date: November 24, 1997 <br />Gross Square Feet: ~,8~2 <br />DESCRIPTION <br />Slt@WOY{( <br />Foundations <br />Substructure <br />Superstructure <br />Exterior Closure <br />Roofin <br />Interior Construction <br />Mechanical <br />Electrical <br />Subtotal <br />General Conditions/Permit <br />Subtotal <br />Contractor OH & Profit <br />Total Contractor Cost <br />COST <br />Contractor's Standard Exclusions: <br />1. NA <br />2. Storm Sewer Revisions <br />3. Systems Development & LID Costs <br />4. Testing & Inspection Costs <br />5. Builder's Risk Insurance Premiums <br />8~ Deductibles <br />7. NA <br />8. Owner's Lega18~ Financing Costs <br />Estimator : David Hays <br />Architect : Arbuckle Costic Arch. <br />Drawing Date: August 26, 1997 <br />Structure: 5 Story Plan <br />NW Courtyard <br /> COST/S.F. <br />$17,438 $9.32 <br />$p $0.00 <br />$o $o.oo <br />$o $o.oo <br />$o $o.oo <br />$o $o.oo <br />~p $o.oo <br />go $o.oo <br />$3,200 <br />$p $~ •~~ <br />$o.oo <br />~~n ~~R $11 A2 <br />$1,754 ~v.~`' <br />$22,392 $11.96 <br />$1,064 $0.57 <br />$23,456 $12.53 <br />9. Site Survey & Boundary Control <br />10. Soils Report <br />11. Environmental Assessment Survey <br />12. Hazardous 8~ Toxic Waste Removal <br />13. Removal of Soil Contaminated by <br />Hazardous or Toxic Wastes <br />14. Utilities are assumed to be within <br />100' of Building connection point <br />
The URL can be used to link to this page
Your browser does not support the video tag.