Laserfiche WebLink
~ <br />~ <br />Sitework <br />DESCRIPTION QUANTITY UNITS UNIT COST COST <br /> <br />SITEWORK <br /> <br />Surve in 0 Is $5,000.00 $0 <br />Saw cut asphalt 0 If $2.50 $0 <br />Curb grade, rock and remove existing AC 0 If $7.00 $0 <br />A.C. around site perimeter 0 sf $2.75 $0 <br />Sidewalk grade and rock 23 c $30.00 $690 <br />4" Sidewalk 1,351 sf $2.90 $3,918 <br />Rat slab under avers 408 sf $2.00 $816 <br />Sidewalk caulkin 240 If $1.75 $420 <br />S ecial Stone 113 sf $10.00 $1,130 <br />Driveway a roaches/6" concrete 0 sf $3.75 $0 <br />Colo~ed Concrete at Drive a proaches 0 sf $4.00 $0 <br />Brick pavers 408 sf $8.00 $3,264 <br />Curb and utter 0 If $12.00 $0 <br />Waterproofing 0 sf $2.00 $0 <br />Remove and repair existin Bus facilit 0 Is $45,000.00 $0 <br />Striping - Street Parkin 0 Is $1,000.00 $0 <br />handicap striping and signage - Street Park 0 Is $1,000.00 $0 <br />Resignalization 0 ts $50,000.00 $0 <br />Reroute sanita sewer 0 Is $42,800.00 $0 <br />Landscaping and irrigation 0 ea $500.00 $0 <br />Benches 0 ea $780.00 $0 <br />Trash Receptacles 0 ea $500.00 $0 <br />Planter Pots ~ Hatfield Plaza 6' Dia 4 ea $1,800.00 $7,200 <br />Bike Racks 0 ea $920.00 $0 <br />Tree grates 6'x6' 0 ea $1,102.00 $0 <br />Flag poles 0 ea $2,000.00 $0 <br /> <br />SUBTOTAL $17,438 <br />