My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Financial- Salem, City of (Streetscape)
>
CS_Courthouse Square
>
Financial- Salem, City of (Streetscape)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 3:34:12 PM
Creation date
9/7/2011 2:41:38 PM
Metadata
Fields
Template:
Building
RecordID
10225
Title
Financial- Salem, City of (Streetscape)
Company
Marion County
BLDG Date
12/24/1997
Building
Courthouse Square
BLDG Document Type
Finance
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City Summary <br />.~ <br /> ' PENCEIKELLY ~ONSTRUGTION,. II~IC. <br /> ~ <br />Streetsccpe Altemata #`l: NW Couriyard <br />' : 24-r~o~-s~ <br />Sidewalk/Curb Improvements' <br />curb & gutter w/ related asphalt work $0 <br />sidewalk & driveway approaches $8,228 <br />brick thin-set pavers $5,210 <br />resignalization (allowance) $~ <br />brick, glazing and precast finishes at shelter arcades and towers $0 <br />striping and handicap signage fo~ street parking _ $~ <br /> subtotal $13,438 <br />Street Furnishings <br />landscape and irrigation at tree wells (54)ea. $~ <br />tree grates 6'x6' (54)ea. $0 <br />benches (12)ea. $~ <br />trash receptacles (5)ea. $0 <br />planter pots at plazas (12)ea $7,200 <br />bike racks (3)ea $~ <br />flag poles at Hatfield Plaza (4)ea $~ <br />street lamps and poles (28jea $~ <br />misc. lighting at weather shelters (allowance) $~ <br /> subtotal $7,200 <br />Weather Protection Facilities <br />perimeter weather protection shelters at building perimeter $0 <br />clock tower, arcade and comer weather protection shelters from street $0 <br />truss weather protection shelters at bus entrances $~ <br /> subtotal $0 <br />Sanitary Sewer Upgrade <br />traffic control $~ <br />earth work $~ <br />pipe work $0 <br />new manhole $~ <br />surface restoration $~ <br /> subtotal $0 <br />Remove and Replace Old Bus Statlon in High Street <br />Remove Island $~ <br />surface restoration $~ <br />new curb and sidewalk at comers only (2)ea $~ <br /> subtotal $0 <br />Subtotal $20,638 <br />General Conditions/OH 8~ ProfiUPermits $2,818 <br />Total Contractor Costs $23,456 <br />Architectural and Engineering Costs $1,407 <br />Total Streetscape Costs ** $24,863 <br />* Demolition costs for the existing sidewalks has been paid for under the main project <br />**Alternate #1 and #2 are included in this cost <br />This cost represents the true cost of the streetscape package. <br />This does not necessaril re resent th~ fundin re uested from the Ci of Salem's urban renewal fund <br />Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.