My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Financial- Projected Costs
>
CS_Courthouse Square
>
Financial- Projected Costs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 3:31:49 PM
Creation date
9/7/2011 9:06:01 AM
Metadata
Fields
Template:
Building
RecordID
10219
Title
Financial- Projected Costs
Company
Marion County
BLDG Date
3/3/1999
Building
Courthouse Square
BLDG Document Type
Finance
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Estimating, Other Consultants - Estimated cost of subconsultants not included in the <br />architectural contract. Such consultants include project estimating, elevator consultants, and <br />acoustical consultant (shared 69.36% / 30.64%). <br />Building Commissioning - Estimated cost of commissioning net of Oregon Office of Energy <br />grant (shared 79.93% / 20.07%). <br />Building Testing and Balancing - Estimated cost of testing and balancing services (shared <br />79.93% / 20.07%). <br />PROJECT MANAGEMENT AND CONSTRUCTION SERVICES <br />Melvin Mark Development Co. - Preconstruction Services - Actual cost of 1VIlVIDC services <br />through design #2 preconstruction (County only expense). <br />M1VIDC Construction Management - Contract amount for M1VIDC during construction phase <br />(shared 69.36% / 30.64%). Assumes an additional three months estimated fee to generally <br />correspond with substantial completion. This additional fee is cunently a County only expense. <br />NIlVIDC reimburseables - Contract amount for MNIDC reimbursables during construction phase <br />(shared 69.36% / 30.64%). <br />Pence Kelly - Original / Revised Design Cost for Estimating and Value Engineering Services - <br />Actual cost of Pence Kelly's services during the preconstruction phase. Costs were <br />incurred when construction contract was to be negotiated rather than bid (original costs <br />shared 72% / 28%; revised costs shared 69.36% / 30.64%). <br />D. Berry - Actual amount paid to D. Berrey (shared 72% / 28%). <br />LOAN FEES AND FINANCIAL COSTS <br />Appraisal - Estimated cost of real estate appraisal and title services (County only expense). <br />Property Taxes during Construction - Assumes County and Transit space will be exempt from <br />property taxes during construction. <br />Solid Waste Loan Repayment - Actual amount of interest and principal repaid to Solid Waste <br />upon bond funding. <br />Legal - Estimated cost of project-related legal expenses. <br />County Administrative Overhead - Estimated cost of internal project-related management and <br />administration (County only expense). <br />Move-In Costs - Estimated cost to relocate from interim office space to Courthouse Square. <br />Move-Out Costs - Estimated cost of relocating from the Senator block to the County annex <br />(County only expense). <br />
The URL can be used to link to this page
Your browser does not support the video tag.