My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Financial- Projected Costs
>
CS_Courthouse Square
>
Financial- Projected Costs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 3:31:49 PM
Creation date
9/7/2011 9:06:01 AM
Metadata
Fields
Template:
Building
RecordID
10219
Title
Financial- Projected Costs
Company
Marion County
BLDG Date
3/3/1999
Building
Courthouse Square
BLDG Document Type
Finance
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Private Tenant Moving Expenses - Actual cost to relocate private Senator block tenants (cost <br />shared 68.71% / 31.29%). <br />CAPITALIZED INTEREST ACCOiJNT - Interest only bond payments made during <br />construction and move-in phases. Payments assume a 4.99% interest rate, equal project draws <br />and rent generation date of no later than 12/1/2000. <br />INTEREST EARNED ON CONSTRUCTION FtJND - Estimated amount earned on the project <br />fund during the construction term. Assumes a 4.50% Interest rate, equal project draws and a <br />liquidated project fund by 8/1/00. <br />FINANCING COSTS-Includes the cost of issuance, underwriter's fee and bond insurance <br />associated with the bond financing. <br />PROJECT CONTINGENCY-The project contingency is intended to fund unidentified, <br />unfunded, or unexpected hard or soft costs during the constn~ction phase. <br />REMEDIATION CONTINGENCY-The Remediation contingency is intended to fund the <br />identification, removal and disposal of contaminated soils or ground water, which may be <br />identified during the course of construction. <br />DEBT REDUCTION FLJND-The debt reduction fund is intended to buy back bonds at the end of <br />the construction phase to reduce project debt service. <br />
The URL can be used to link to this page
Your browser does not support the video tag.