~ Ra.ndy and RG will make themselves available. <br />General Contractor report: Dave will start to copy all correspondence/co~munications to <br />both Randy and RG to expedite the process. ' <br />BUDGET <br />RG expressed taking the approach of dealing with the project as a whole to see if we come in on <br />budget first. Once that determination is made, County and Transit will wo~jk the numbers <br />between themselves to fit in the pieces. There was general consensus from a11 ~resent that tlus <br />is a good approach. <br />Randy and RG need to know how the budgets in the past have been generated. ' The important <br />piece is to keep project on budget. They will be depending upon support fro~i architect and <br />general contractor to help with understanding how the numbers were derived. Di~scussions were <br />held on how some of the components of Dan's budget were computed. The tl~a.m will work <br />together through the budget process. Once a final number is achieved, then we '~can schedule a <br />work session to break out the different components. County and Transit havle discretion to <br />make determinations with guidance from architect and general contractor. Curt said there was a <br />written description delineating the mall costs and what was used to arrive at that n~mber eazly on <br />in the planning stages. , <br />Both County and Transit have been fielding questions on why the project jump~d from a$25 <br />million to $36 million project. From Dan's earlier numbers it actually went fro~ a$31 million <br />to $36 million project. The budget does look like it is coming down based lon our recent <br />calculations. The perception in the community is they are looking at initial pres~ coverage of a <br />$25 million dollar design that has changed quite a bit since initial introduction„ and have not <br />taken into account all the changes that have been made. ' <br />Another point to look at was the amount of contingencies Dan had built into the b~udget. There <br />are over $9 million in soft costs that are starting to get fixed and pinned down jnow. We are <br />coming in well ahead on those costs. There was a 5% contingency on both har~ & soft costs, <br />plus padding in all the numbers as well as the general contractor adding anothejr $500,000 in <br />contingencies. So far with the abatement and demolition contracts in, we have saj~ed $400,000. <br />There is $500,000 for remediation in the budget, but no revenue from Chevron for contaminated <br />soil or environmental consultant fees are included. <br />Parking Structure <br />Curt asked if Leonard revamped the parking structure and moved it back to the Ch$vron site? <br />RG had attended a recent meeting and was specifically asked if the project woti~ld be able to <br />provide underground space for bicycle lockers for building employees. If it iis just a bare <br />concrete room with vertical hangers around perimeter that would work. There are ~federal grants <br />available through COG for the hangers. If there is space to include this, let's do i~ as long as it <br />doesn't jeopa.rdize vehicle pa.rking spaces. Leonazd said there should be a couple of corners <br />where this could be done. There is need to have m& e equipment storage and a shpp area in the <br />