Laserfiche WebLink
can do de-watering package proposal. West Tech is the civil engineer on the project. <br />~ Discussion was held about what would happen if we can't go 2 stories on the pa.rking structure. If <br />limited to one floor of the whole block would only generate 320-330 parking stalls. Could present <br />a problem to project if it develops. <br />Kathleen had to leave the meeting, and Pence/Kelly budget discussions resumed. <br />• mechanical includes bathrooms, HVAC equipment, ma,in trunk line on each floqr level. Byron <br />will need copy of plan to review. <br />• build out TI's will include boxes <br />electrical work on bid in detail later; core area done. Any narrative on electricat, Bryon needs <br />copy. <br />Curt then went through the Qualifications/Exclusions provided on the ne~rt twa pages. Some <br />additional explanations andlor discussions on items were: <br />• Common area is appro~mately 35,000 square feet <br />• E~aust venting parking structure <br />• Pence/Kelly looking at space for office near site. They are checking on space in the old Grand <br />Theater building. Melvin Mark might be interested in sharing office space. <br />• Testing allowance includes no environmental testing, just basic material testing. Byron asked <br />if someone is looking at sound issues? Answer: That was why we went to concx-ete. We have <br />done some checking with firms on acoustical designs. <br />• Performance and payment bonds are for Pence/Kelly. <br />~ •$40,000 allowance is construction de-watering only. <br />• skylights and openings <br />• Parking structure at 377 stalls. Dan Pretrisuch ask about other scenarios on parking and <br />if the plans would be available for them to look at? Answer: yes <br />Exclusions: <br />• no mechanical fans on ground level, but includes mechanical fan from parking. C~arcoal filters <br />($100,000) on roof units is separate package from pa.rking garage. Concern about air tlow <br />on retail space area. Byron would like to look at these plans. <br />• issue of bus mall on fireproofing - no issues with city. Fireproofing on heari~ng room lid? <br />Yes <br />• Streetscape number based on what we gave city. After we get a balanced budget, then we can <br />go to the city for formal presentation on streetscape numbers. <br />• Landscaping on bus mall unknown <br />• Heat under plaza has been eliminated. <br />• Landscape irrigation in streetscape <br />• Signs included: bathroom/handicap etc. <br />• Basement not painted. <br />• Security separation where floor goes through roof on 3rd floor not included. Passible railing <br />around opening. Security and noise level issues need to be resolved. <br />• Sunscreens eliminated. <br />Page 4 of 6 <br />