RG asked if Curt could pull out the numbers attributed to the bus mall? Pence/Kelly will <br />calculate for Transit to determine areas to cut if Transit is over-budget on project. They will also <br />~ include narratives for making the decisions and/or assumptions. <br />Parking Structure Issue <br />Discussions were held on the parking structure design. Early on in the design process we were at <br />stall count of 423 with an$11,200 per stall cost. Can we get there once again with a good <br />efficiency rating? By adding one more bay and moving west wall we can get an additiona125 <br />spaces per floor and get the count to 425 spaces. The efficiency rating is not qui~e there. <br />How do we resolve our parking issue of fewer spaces at higher costs? The olc~ design doesn't <br />fit anymore. Design works better now. Could look at ratio of compact vs. standard size vehicles <br />and make an adjustment with an additiona,l row of compact cars raising ratio from 18% to 30% <br />compacts. The previous change from a 40' grid to 30' grid for costs savings, changed the parking <br />grid from the original design on the pa.rking structure. That is why we can't get ba~k to that lower <br />efficiency rating. Melvin Mark Companies requested copies of the azchitect's different scenarios <br />for the parking structure to avoid duplicating any previous efforts. With the genexal contractor's <br />deadline for bid package to go out approaching it is e~rtremely critical to get the parking structure <br />stall count/efficiency rating/costs in line. <br />Discussion was held on what kind of pazking ratios were needed. City of Salem Class A parking <br />is at 0- 1.5. From a pre-leasing situation for retail space (60,000 squaze feet), 3 or 4 per thousand <br />adds to the total leasing package we have to offer to potential tenants. Keepir~g the pa.rking <br />structure at 377 stalls, County owns another parking structure across the street and could add <br />additional stalls to the pot to increase the number of stalls, if that is what we need. Another would <br />be to add the extra 48 stalls and then possibly lease out with meters. Our dollar r~turn would be <br />much greater than a straight monthly lease. We still need to keep in mind the bid date and DD <br />drawings to Pence/Kelly by July 15~', with August 15"' as due date for GMP. <br />Leonard recalculated a 371.6 efficiency rating on pa,rking structure with 425 spaces. It was <br />determined that what would be best would be to build the most efficient parking structure, while <br />keeping costs down and bring the efficiency rating up. The main question now is balancing how <br />many spaces to build in the structure? Melvin Mark Companies approach is if there is mazginal <br />cost for an additional 48 spaces and marginal revenue to pay for it, then it would make sense to do <br />it. If it won't pay for itself, then do we need the eztra spaces to make the retaW office space <br />marketable? The concept of the bus mall in the building should encourage e~ra use of transit and <br />could lower the requirement of pazking space. Transit does not intend to increase bus routes at this <br />time, however. Leonard and Dave will work on the marginal costs of the parking s~~tructure. If it <br />is a breakeven venture, then it should be built. Addition of 48 spaces will add costs ta total project. <br />The goal is to get the cost per stall down. Let's take another 24 hours to take a lopk at the final <br />numbers. Leonard will leave in residual space to store equipment such as street sweepers, <br />mechanical space, etc.) and will create a more functional structure for us now. <br />Discussion of pazking analysis for the Salem area included the following: Courthouse Square <br />monthly rental rate would be $50; storage space and parking for office tenants in Courthouse Square <br />Page 5 of 6 <br />