My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Development Team Meeting Notes (96-99)
>
CS_Courthouse Square
>
Development Team Meeting Notes (96-99)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:47:33 AM
Creation date
9/6/2011 10:03:43 AM
Metadata
Fields
Template:
Building
RecordID
10302
Title
Development Team Meeting Notes (96-99)
BLDG Date
8/19/1997
Building
Courthouse Square
BLDG Document Type
Committee
Project ID
CS9601 Courthouse Square Research
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
430
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
we will make a recommendation to the Board of Commissioners on October lst. A pre-conference <br />is scheduled on 10/8 and the contractor will start on 10/13. Tom's estimate is a 4-6 week <br />completion with the contractor being done by 11/21 at the latest. <br />. <br />Discussions were held on the depth of the excavation, issues pertaining to a set grade level, and <br />trying to minimize backfill. Leonard will provide Risk Management with actual elevations to <br />include in this phase of the project. The key is having a site that is financible. Remediation levels <br />will override the bacl~ill issue in order to get financing. Accurate records tracking the remediation <br />will be maintained. Remediation will be scheduled to be completed by the end of November with <br />the general contractor starting the construction phase either December 1 or January 1. We need to <br />look at other items that need to happen in order to keep the project on target as well. <br />Page 4 of 4 ~ <br />