Laserfiche WebLink
~oirnoo Courthouse Square <br /> Approved COR / CO Log <br /> COUNTY TRANSIT <br />COR CO APPROVED <br />AMOUNT DESCRIPTION OF CHANGE ALLOCATION ALLOCATION Notes <br />COR # 1 1 $ 530.00 Decomission, removal and disposal of UST encountered on 3-15-99 <br />2 $ 2,530 $ - CO <br />COR # 2 1 $ , <br />1,765.00 Resolve gas line conflicts during sewer line relocation $ 1,224 $ 541 P-Streetscape <br />CO <br />COR # 4 1 $ 12,215.00 Removal and disposal of contaminated soils-203.9 c.y. $ 12.215 $ - CO <br /> removal and disposal of UST encountered along s. blockface <br />00 Decomission <br />982 <br />4 $ 4,982 $ - <br />COR # 5 <br />COR # 6 1 <br />1 $ <br />$ , <br />. <br />, <br />450.00 Increase compressive strength of footing pads from 3,000 to 5,000 psi <br />3 $ 2,393 $ 1,057 P <br />COR # 9 2 $ , <br />16,112.00 Removal and disposal of contaminated soils-268.54 c.y. $ ~ 6,~ 12 $ - CO <br />P <br />COR # 12 2 $ 685.00 Demolition of water vault along Court street $ 4~5 $ <br />41 <br />470 $ 2~~ <br />- CO <br />COR # 17 2 $ 41,470.00 Removal and disposal of contaminated soils <br />i $ <br />$ , <br />159 <br />414 $ 579 <br />55 Modified P <br />COR # 20 3 $ ls <br />214,993.00 ' Excavation of unsuitable subgrade/fill in areas of unsuitable or contaminated so , , CO <br />COR # 21 4 $ 27,697.00 Removal and disposal of contaminated soils-461.62 c.y. $ 27,697 $ - CO <br /> remove and dispose of three tanks in the NW corner of the site <br />00 Excavate <br />14 <br />135 $ 14,135 $ - <br />COR # 3 <br />COR # 7 5 <br />5 $ <br />$ , <br />, <br />. <br />6,966.00 Add'Rional dewatering costs due to overexcavation $ 4,832 $ 2,134 P <br />50l50 <br />COR # 8 5 $ 1,876.00 Owners share of partnering session <br />9 $ <br />$ 938 $ <br />967 $ 938 <br />427 P <br />COR # 10 5 $ 1,394.00 Provide cavity wall insulation at exterior masonry walls of rooms 1209, 1219 and 723 60 <br />$ (140) B <br />COR # 13 5 $ (700.00) Delete sump pump at elevator #1 <br />t $ <br />$ ) <br />(5 <br />986) $ <br />(t2 (5,737) P <br />COR # 18 5 $ em <br />723.00) VE proposal #1-Delete low "E" coating on #3 surface of bus mall giass canopy sys <br />(18 , <br />COR # 19 5 $ , <br />00) VE proposal #1-Replace 1600 amp bus duct wkh conduR and wire for feed to rooftop equip. <br />744 <br />(1 $ (1,394) $ (350) B <br /># 22 <br />O 5 $ . <br />, <br />00 Provide couplers at top of parking level columns for future north pad development <br />193 <br />5 $ 3,602 $ 1,591 P <br />R <br />C . <br />, $ (352) $ (88) B <br />COR # 23 5 $ (440.00) Delete PT tendon locators $ 689 $ 304 P <br />COR # 26 5 $ 993.00 Revise column ties after fabrication $ 373 $ 165 P <br />COR # 27 5 $ 538.00 Provide column tail revisions $ 6 <br />613 $ 2,921 P <br />COR # 29 5 $ 9,534.00 Revise column reinforcement detail $ , <br />1,925 $ 850 P <br />COR # 30 5 $ 2,775.00 Provide added rebar at isolation joints $ (864) $ (217) B <br />COR # 33 5 $ (1,081.00) Delete fink seal and ESP-1 $ 213 $ <br />4 1,861 B <br />COR # 35 5 $ 6,074.00 Revise columns to go to roof levei at grids 0/11 and Ol12 , 1 P <br />COR # 36 5 $ (2,547.00) Revise column type at grid J-10a $ (2,036) $ <br />548 $ ) <br />(51 <br />242 P <br />COR # 38 5 $ 790.00 Provide reinforcing at SOG beneath columns $ 424 $ <br />1 629 P <br />COR # 39 5 $ <br />$ 2,053.00 Provide added footing and column <br />roposal #3-Revise precast panels to mitered comers instead of "U" shape <br />00) VE <br />962 <br />8 $ <br />$ , <br />6,216 <br />~ ~$ 2,746 <br />~ ~ P <br />COR # 42 5 p <br />. <br />, <br />( <br />$ <br />$ NC <br />COR # 44 5 $ - Provide flourescent lamp revisions <br />$ <br />- $ _ <br />NC <br />COR # 45 5 $ - Provide hollow metal frame revisions $ 668 $ 295 P <br />COR # 47 5 $ 963.00 Provide floor hardener at rooms 1209, 1219, and 1239 32 P <br />OR # 48 5 $ 00 Change wall mounted water cioset to floor mounted water closet in room 1224 <br />105 $ 73 $ <br />C <br />COR #50 5 $ . <br />315.00 Remove and dispose of UST adjacent to Church Street $ 315 $ - Streetscape <br />COR #53 5 $ 3,186.00 Revise foundation drain pipe specification $ 2,210 $ <br />839 $ 976 <br />371 P <br />P <br />COR #54 5 $ 210.00 Provide added rebar for piiaster at the SW air shaft <br />1 $ P <br />COR #56 5 $ , <br />(83.00) Provide changes to glazing <br />arking stalls w/ covered walkway -relocate future job trailers to Church <br />arallel <br />six <br />id <br />00 P <br />7 $ <br />$ (58) $ <br />22,498 $ (25) <br />9,939 P <br />COR # 28 6 $ <br />$ p <br />p <br />rov <br />e <br />. <br />32,43 <br />00 " Excavation of unsuitable subgrade/fill in areas of unsuitable or contaminated soils <br />846 <br />90 $ 67,965 $ 22,881 Modified P <br />COR #51 7 . <br />, $ 3,671 $ 1,621 P <br />COR # 24 8 $ 5,292.00 Slab transition revisions $ 18 <br />824 $ 4,726 B <br />COR tf55 8 $ 23,550.00 Upgrade windows to S~ngate 1000 at three building faces , <br />785 $ 785 50/50 <br />COR #57 8 $ 1,569.00 Change column in hearing room $ <br />$ 569 $ 252 P <br />COR #59 8 $ 821.00 Added column ties $ 461 $ <br />1 646 P <br />COR #61 8 $ 2,107.00 Added rebar on GF1 per shop drawings $ , <br />526 $ 232 P <br />COR #62 8 $ 758.00 Luminar base at flagpole $ 846 $ <br />1 464 B <br />COR #63 8 $ 2,310.00 Stand pipe changes per PR t13 $ , <br />32,514 $ 8,164 B <br />COR #64 8 $ 40,678.00 Added rebar at pour strips $ (2,497) $ (1,103) P <br />COR #65 8 $ (3,600.00) Delete 2' sand layer $ - $ 208 TO <br />COR #66 8 $ 208.00 Added steel bracing at canopy <br />