COR #67 8 $ 9,245.00 Change door frames per PR #31 $ 9,245 <br />384 $ <br />$ - <br />169 CO <br />P <br />COR #68 8 $ 553.00 Owners job shack phone $ <br />$ 93 $ 23 g <br />COR #69 8 $ 116.00 Provide dowels at east stairwell $ 257 $ 114 P <br />COR #70 8 $ 371.00 Provide thickened generator slab $ 527 <br />1 $ 674 P <br />COR #71 8 $ 2,201.00 Provide changes to air intake $ , <br />318) <br />(3 $ - CO <br />COR #72 8 $ (3,318.00) NTE credit on removal of three tanks $ , <br />3 <br />655 $ 1,614 P <br />COR #73 8 $ 5,269.00 Provide changes to column base $ , <br />669 $ 295 P <br />COR #78 8 $ 964.00 Added dowels and shear head $ 284 <br />1 $ 323 B <br />COR # 34 9 $ 1,607.00 Add (4) hot water hose bibs per PR #8 $ , <br />735 <br />21 $ 9,60t P <br />COR # 37 9 $ 31,336.00 Provide sump pit per PR #9 $ , <br />(12) $ (5) P <br />COR #75 9 $ (17.00) Provide revisions to eiectrical drawings per PR #16 $ 738 <br />7 $ 3,419 P <br />COR #76 9 $ 11,157.00 Provide changes to air at rooms per PR #27 , <br />580 $ 146 B <br /> 9 $ 00 Provide rivo additional 4" conduit sleeves in Data/Com room per PR # 29 <br />726 $ <br />COR #82 <br />3 9 $ . <br />00 Provide two additional 1" conduits with pull cords per PR # 28 <br />677 $ 339 $ 339 50/50-CCN <br />COR #8 <br />COR #84 9 $ . <br />960.00 Provide 273 3" conduit sleeves per EC proposal altemate # 32 <br />8 $ ~,~62 $ ~.~98 B <br />COR #79 10 $ , <br />82,520.00 Removal and disposal of unsuitable subgrade material $ 57,236 $ 25,284 P <br />NC <br />COR # 31 11 $ - Provide modifications to public works package per City's requirements $ - <br />195 <br />3 $ <br />$ - <br />1 <br />412 P-Streetscape <br />COR # 32 11 $ 607.00 Provide access hatch and revisions to plumbing and sprinkler system <br />4 $ , , P <br />COR # 46 17 $ , <br />00) Delete bentonite waterproofing and reduce slab thickness in same area <br />759 <br />(20 $ (14,398) $ (6,36t ) <br /> , <br />. <br />00 Provide insulation at rebar dowels and durometer bearing pad per RFI's 199 and 204 <br />278 <br />7 $ 5,048 $ 2,899 P <br />COR # 49 11 $ . <br />, <br />00 Provide dewatering for undocumented fill areas from 5121/99 to 6/20/99 <br />934 <br />2 $ 2,035 $ <br />COR #52 <br />COR #58 11 $ <br />11 $ . <br />, <br />1,407.00 Provide changes to gas pressure regulators per PR #21 $ ~,~ZS $ 282 B <br />NC <br />COR #77 11 $ - Changes to elevator beams per PR #34 <br />i <br />it $ - <br />309 $ - <br />78 B <br />COR #89 11 $ s <br />387.00 Provide additional rebar at south siab step (gridline D) per structural engineer site v $ $ <br />COR #93 11 $ 855.00 Provide reinforcing at arcade slab per RFl 297 855 TO <br />B <br />COR #94 11 $ 00 Provide additional reinforcing a~d 6" hooks per submittal 2F7 and RFI 328 <br />794 <br />2 $ 2,233 $ 561 <br />COR #95 11 $ . <br />, <br />5,558.00 Provide changes to nine columns per RFI 317 $ 3,855 $ <br />$ 1,703 <br />405 P <br />TO <br />COR #96 11 $ 405.00 Provide addftional reinforcing for arcade beams per RFI 319 $ - P <br />COR #99 11 $ 139.00 Provide slab continuation at bottom of east and west shafts per RFI 236 <br />2 $ 1,484 $ 655 <br />COR #t 02 12 $ , <br />33,688.00 Removai and disposal of unsuitable subgrade material $ 23,366 $ 10,322 P <br />CO <br />COR #88 13 $ 21,567.00 Removal and disposal of contaminated soils-359.45 c.y. $ 21,567 $ - B <br />COR # 14 14 $ 1,362.00 Provide ductwork and supply fan revisions per PR #1 $ 1,089 $ 273 P <br /> 00 Provide concrete ceiling above switch gear and revise CMU walls per RFI 193 <br />4 <br />607 $ 3,195 $ 1,412 <br />COR #81 <br />COR #85 14 $ <br />14 $ , <br />. <br />686.00 Provide additional conduit for swing gate operator per approved submittal 02710-001 <br />4 $ 3,250 $ 1,436 P <br /> , <br />00 Provide short wall reinforcing at parking garage lobby per RFI 760 <br />877 $ 608 $ 269 P <br />COR #87 <br />COR #100 14 $ <br />14 $ . <br />255.00 Provide changes to exit sig~s per PR #42 $ 204 $ 51 B <br />TO <br />COR #101 14 $ 654.00 Provide electrical power to the tower clock per RFI 233 $ - $ <br />$ 654 <br />294 TO <br />COR #103 14 $ 294.00 Provide changes to bridge connection detail 9/S6.1.1 per RFI 343 $ P <br />COR #107 14 $ 475.00 Provide additional PT cables and reinforcing (c~ grid M/tOb $ 329 $ 146 8 <br />COR #110 14 $ 7,192.00 Provide additional reinforcing (c~ floors 3, 4, 5 per structural shop drawing review $ 5,749 $ 1,443 P <br />COR t~114 14 $ 574.00 Provide ductile iron for domestic and fire water service in lieu of copper per Cky of Salem <br />1 $ ~.~9z $ 482 <br />1 15 $ , <br />wall and electrical revisions to second floor per PR #2 <br />00 Provide door <br />265 $ 212 $ 53 B <br />COR # 1 <br />1 15 $ , <br />. <br />00 Provide rebar to header above fire doors at parking separation wall per RFI 12 and COR #41 rev. <br />622 $ 9 <br />COR # 4 <br />8 <br />15 $ . <br />00 Provide changes to luminaires and electricai connections per PR #18 rev. <br />859 <br />$ 687 $ 1 <br />z B <br />COR #10 <br />COR #115 15 $ . <br />532.00 Provide added PT cables at ground floor pour joints per corrected shop drawings <br />3 $ 2,823 $ 709 B <br />COR #116 15 $ , <br />(58.00) Provide changes to transformer room per PR iW0 $ (40) $ (18) P <br />B <br />OR #118 15 $ 00) Provide 4" batt insulation in lieu of 3" semi rigid insulation under the suspended slab per VER #13 <br />317 <br />(9 $ (7,447) $ (t,870) <br />C <br />19 15 $ . <br />, <br />00 Provide dowels at parking leve~ SOG joints. Grind where SOG has been poured and has curted <br />923 <br />6 $ 4,802 $ 2.~ 2~ P <br />COR #1 $ . <br />, <br />00) Provide series rated switchyear in lieu of specified system per VER #5 <br />10 <br />640 $ (7,380) $ (3,260) P <br />COR #121 15 <br />15 $ , <br />. <br />( <br />00) Stop gypsum board 6" above ceiling height at all perimeterwalls per VER #14 <br />081 <br />(2 $ (1,663) $ (418) B <br />COR #122 15 $ . <br />, <br />00) Deduct cost of all foreign made reinforcing that has been supplied for use on project <br />200 <br />(5 $ (3,607) $ (1,593) P <br />COR #123 . <br />, $ 200 $ 89 P <br />COR #124 15 $ 289.00 Provide conduit for PGE vault per PR #56 <br />RM 3228 <br />l i $ 812 <br />91 $ - CO <br />COR #105 16 $ n <br />812.00 Provide space saver filing system per PR #41-electric assist in RM 3145/mechanica <br />91 , <br /> , <br />lumn to encase eledricai duct bank per RFI 182 <br />d <br />b $ 4,507 $ 1,991 P <br />COR # 43 17 $ co <br />eam an <br />6,498.00 Provide concrete <br />