COR #67 8 $ 9,245.00 Change door frames per PR #31 $ 9,245
<br />384 $
<br />$ -
<br />169 CO
<br />P
<br />COR #68 8 $ 553.00 Owners job shack phone $
<br />$ 93 $ 23 g
<br />COR #69 8 $ 116.00 Provide dowels at east stairwell $ 257 $ 114 P
<br />COR #70 8 $ 371.00 Provide thickened generator slab $ 527
<br />1 $ 674 P
<br />COR #71 8 $ 2,201.00 Provide changes to air intake $ ,
<br />318)
<br />(3 $ - CO
<br />COR #72 8 $ (3,318.00) NTE credit on removal of three tanks $ ,
<br />3
<br />655 $ 1,614 P
<br />COR #73 8 $ 5,269.00 Provide changes to column base $ ,
<br />669 $ 295 P
<br />COR #78 8 $ 964.00 Added dowels and shear head $ 284
<br />1 $ 323 B
<br />COR # 34 9 $ 1,607.00 Add (4) hot water hose bibs per PR #8 $ ,
<br />735
<br />21 $ 9,60t P
<br />COR # 37 9 $ 31,336.00 Provide sump pit per PR #9 $ ,
<br />(12) $ (5) P
<br />COR #75 9 $ (17.00) Provide revisions to eiectrical drawings per PR #16 $ 738
<br />7 $ 3,419 P
<br />COR #76 9 $ 11,157.00 Provide changes to air at rooms per PR #27 ,
<br />580 $ 146 B
<br /> 9 $ 00 Provide rivo additional 4" conduit sleeves in Data/Com room per PR # 29
<br />726 $
<br />COR #82
<br />3 9 $ .
<br />00 Provide two additional 1" conduits with pull cords per PR # 28
<br />677 $ 339 $ 339 50/50-CCN
<br />COR #8
<br />COR #84 9 $ .
<br />960.00 Provide 273 3" conduit sleeves per EC proposal altemate # 32
<br />8 $ ~,~62 $ ~.~98 B
<br />COR #79 10 $ ,
<br />82,520.00 Removal and disposal of unsuitable subgrade material $ 57,236 $ 25,284 P
<br />NC
<br />COR # 31 11 $ - Provide modifications to public works package per City's requirements $ -
<br />195
<br />3 $
<br />$ -
<br />1
<br />412 P-Streetscape
<br />COR # 32 11 $ 607.00 Provide access hatch and revisions to plumbing and sprinkler system
<br />4 $ , , P
<br />COR # 46 17 $ ,
<br />00) Delete bentonite waterproofing and reduce slab thickness in same area
<br />759
<br />(20 $ (14,398) $ (6,36t )
<br /> ,
<br />.
<br />00 Provide insulation at rebar dowels and durometer bearing pad per RFI's 199 and 204
<br />278
<br />7 $ 5,048 $ 2,899 P
<br />COR # 49 11 $ .
<br />,
<br />00 Provide dewatering for undocumented fill areas from 5121/99 to 6/20/99
<br />934
<br />2 $ 2,035 $
<br />COR #52
<br />COR #58 11 $
<br />11 $ .
<br />,
<br />1,407.00 Provide changes to gas pressure regulators per PR #21 $ ~,~ZS $ 282 B
<br />NC
<br />COR #77 11 $ - Changes to elevator beams per PR #34
<br />i
<br />it $ -
<br />309 $ -
<br />78 B
<br />COR #89 11 $ s
<br />387.00 Provide additional rebar at south siab step (gridline D) per structural engineer site v $ $
<br />COR #93 11 $ 855.00 Provide reinforcing at arcade slab per RFl 297 855 TO
<br />B
<br />COR #94 11 $ 00 Provide additional reinforcing a~d 6" hooks per submittal 2F7 and RFI 328
<br />794
<br />2 $ 2,233 $ 561
<br />COR #95 11 $ .
<br />,
<br />5,558.00 Provide changes to nine columns per RFI 317 $ 3,855 $
<br />$ 1,703
<br />405 P
<br />TO
<br />COR #96 11 $ 405.00 Provide addftional reinforcing for arcade beams per RFI 319 $ - P
<br />COR #99 11 $ 139.00 Provide slab continuation at bottom of east and west shafts per RFI 236
<br />2 $ 1,484 $ 655
<br />COR #t 02 12 $ ,
<br />33,688.00 Removai and disposal of unsuitable subgrade material $ 23,366 $ 10,322 P
<br />CO
<br />COR #88 13 $ 21,567.00 Removal and disposal of contaminated soils-359.45 c.y. $ 21,567 $ - B
<br />COR # 14 14 $ 1,362.00 Provide ductwork and supply fan revisions per PR #1 $ 1,089 $ 273 P
<br /> 00 Provide concrete ceiling above switch gear and revise CMU walls per RFI 193
<br />4
<br />607 $ 3,195 $ 1,412
<br />COR #81
<br />COR #85 14 $
<br />14 $ ,
<br />.
<br />686.00 Provide additional conduit for swing gate operator per approved submittal 02710-001
<br />4 $ 3,250 $ 1,436 P
<br /> ,
<br />00 Provide short wall reinforcing at parking garage lobby per RFI 760
<br />877 $ 608 $ 269 P
<br />COR #87
<br />COR #100 14 $
<br />14 $ .
<br />255.00 Provide changes to exit sig~s per PR #42 $ 204 $ 51 B
<br />TO
<br />COR #101 14 $ 654.00 Provide electrical power to the tower clock per RFI 233 $ - $
<br />$ 654
<br />294 TO
<br />COR #103 14 $ 294.00 Provide changes to bridge connection detail 9/S6.1.1 per RFI 343 $ P
<br />COR #107 14 $ 475.00 Provide additional PT cables and reinforcing (c~ grid M/tOb $ 329 $ 146 8
<br />COR #110 14 $ 7,192.00 Provide additional reinforcing (c~ floors 3, 4, 5 per structural shop drawing review $ 5,749 $ 1,443 P
<br />COR t~114 14 $ 574.00 Provide ductile iron for domestic and fire water service in lieu of copper per Cky of Salem
<br />1 $ ~.~9z $ 482
<br />1 15 $ ,
<br />wall and electrical revisions to second floor per PR #2
<br />00 Provide door
<br />265 $ 212 $ 53 B
<br />COR # 1
<br />1 15 $ ,
<br />.
<br />00 Provide rebar to header above fire doors at parking separation wall per RFI 12 and COR #41 rev.
<br />622 $ 9
<br />COR # 4
<br />8
<br />15 $ .
<br />00 Provide changes to luminaires and electricai connections per PR #18 rev.
<br />859
<br />$ 687 $ 1
<br />z B
<br />COR #10
<br />COR #115 15 $ .
<br />532.00 Provide added PT cables at ground floor pour joints per corrected shop drawings
<br />3 $ 2,823 $ 709 B
<br />COR #116 15 $ ,
<br />(58.00) Provide changes to transformer room per PR iW0 $ (40) $ (18) P
<br />B
<br />OR #118 15 $ 00) Provide 4" batt insulation in lieu of 3" semi rigid insulation under the suspended slab per VER #13
<br />317
<br />(9 $ (7,447) $ (t,870)
<br />C
<br />19 15 $ .
<br />,
<br />00 Provide dowels at parking leve~ SOG joints. Grind where SOG has been poured and has curted
<br />923
<br />6 $ 4,802 $ 2.~ 2~ P
<br />COR #1 $ .
<br />,
<br />00) Provide series rated switchyear in lieu of specified system per VER #5
<br />10
<br />640 $ (7,380) $ (3,260) P
<br />COR #121 15
<br />15 $ ,
<br />.
<br />(
<br />00) Stop gypsum board 6" above ceiling height at all perimeterwalls per VER #14
<br />081
<br />(2 $ (1,663) $ (418) B
<br />COR #122 15 $ .
<br />,
<br />00) Deduct cost of all foreign made reinforcing that has been supplied for use on project
<br />200
<br />(5 $ (3,607) $ (1,593) P
<br />COR #123 .
<br />, $ 200 $ 89 P
<br />COR #124 15 $ 289.00 Provide conduit for PGE vault per PR #56
<br />RM 3228
<br />l i $ 812
<br />91 $ - CO
<br />COR #105 16 $ n
<br />812.00 Provide space saver filing system per PR #41-electric assist in RM 3145/mechanica
<br />91 ,
<br /> ,
<br />lumn to encase eledricai duct bank per RFI 182
<br />d
<br />b $ 4,507 $ 1,991 P
<br />COR # 43 17 $ co
<br />eam an
<br />6,498.00 Provide concrete
<br />
|