Laserfiche WebLink
1/10/2000 <br />Courthouse Square <br />Pending COR's <br />COR PROPOSED AMOUNT DESCRIPTION OF CHANGE STATUS <br />Pending Resolution <br />COR #40 <br />COR #90R ($3,830.00) <br />971.00 <br />$5 Allowed changes in fire rating <br />Provide T.S. shaft columns @ elevator #3 per RFI's 143, 311, 321 Pending Review <br />COR #97R , <br />316.00 <br />$77 Provide additions and revisions to the traffic signalization plan per PR #11 Pending Resolution <br />COR #104 , <br />331.00 <br />$1 Provide ceiling above trash room per RFI 329 Pricing To Be Revised <br />COR #105 , <br />853.00 <br />$80 Provide and install space saver filing system per PR #41 Pending Review <br />COR #106 , <br />$784.00 Provide additional rebar at GF per RFI 314-PT cable already on site Pricing To Be Revised <br />COR #120 859.00 <br />$4 Provide sandblast finish at exterior stairs per PR #49 Pricing To Be Revised <br />COR #131 R , <br />455.00 <br />$2 Provide transformer sled per PR #162 Pending Review <br />COR #135 , <br />$905.00 Provide modified sequence of operation for AC-4 per RFI 284 Pending Review <br />COR #137 112.00 <br />$6 Provide changes to pumps P-2 and P-3 per PR #47 Pending Review <br />COR #138 , <br />482.00 <br />$4 Provide modification to ductwork at canopy braces per RFI 338 Pending Review <br />COR #139 , <br />555.00 <br />$7 Provide Mortar Net and Perma Barrier per RFI 366 Pricing To Be Revised <br />COR #142 , <br />240.00 <br />$2 Provide aluminum tube filler where stud walls terminate at windows per RFI 390 Pricing To Be Revised <br />COR #146 , <br />335.00 <br />$36 Provide traffic deck coating system on surface of north end opportunity site Pending Review <br />COR #148 , <br />$1,039.00 Provide ledger angle per RFI 403 Pending Review <br />Pricing To Be Revised <br />COR #153 <br />4 $96,581.00 <br />00 <br />$529 Provide access control system <br />Provide fire/ smoke damper per RFI 417 Pending Review <br />COR #15 <br />COR #156 . <br />298.00 <br />$5 Provide condensate drains to sanitary per RFI 412 Pending Review <br />COR #159 , <br />$6,168.00 Provide angle for 6" studs per RFI 408 Pending Review <br />Pending Review <br />COR #160 $655.00 Provide brick support above louver per RFI 283 Pending Review <br />COR #161 $1,324.00 <br />0 Provide access panels for tower clocks per PR #58 <br />Provide changes to plenum wall in P 198 per Interface Fax dated 11/29/99 Pending Review <br />COR #162 <br />COR #164 $653.0 <br />254.00 <br />$13 Provide window and door flashing modifications per PR #57 Pending Resolution <br />COR #167 , <br />609.00 <br />$1 Provide graphic to Solid Waste Department Carpet per PR #72 Pending Review <br />COR #170 , <br />$2,163.00 Provide automatic hand dryer upgrade per PR #66 Pending Review <br /> $356,641.00 Pending COR Subtotal <br />* COR #115 includes a delay claim of 8 working days caused by changes in COR's 115 and 64 <br />