Laserfiche WebLink
COR #88 13 $ 21,567.00 Removal and disposal of contaminated soils-359.45 c.y. $ <br />$ 21,567 <br />945 $ <br />$ - <br />417 <br />COR # 14 14 $ 1,362.00 Provide ductwork and supplyfan revisions per PR #1 <br />rete ceiling above switch gear and revise CMU walls per RFI 193 <br />id <br />$ 3,195 $ 1,412 <br />COR #81 14 $ <br />$ 4,607.00 <br />00 <br />686 <br />4 e conc <br />Prov <br />Provide additional conduit for swing gate operator per approved submittal 02710-001 <br />$ 3,250 $ 1,436 <br />269 <br />COR #85 14 <br />14 $ . <br />, <br />00 <br />877 Provide short wall reinforcing at parking garage lobby per RFI 160 608 $ 78 <br />COR #87 <br />COR #100 14 $ . <br />255.00 Provide changes to exit signs per PR #42 $ <br />$ 177 <br />454 $ <br />$ 200 <br />COR #101 14 $ 654.00 Provide electrical power to the tower clock per RFI 233 $ 2~4 $ 9~ <br />COR #103 14 $ 294.00 Provide changes to bridge connection detail 9/S6.1.1 per RFI 343 $ 329 $ 146 <br />COR #107 14 $ 475.00 Provide additional PT cables and reinforcing @ grid M/10b <br />$ 4 988 $ 2,204 <br />COR #110 14 $ 7,192.00 Provide additional reinforcing @ floors 3, 4, 5 per structural shop drawing review <br />and fire water service in lieu of copper per City of Salem <br />ti <br />d <br />~~~84 <br />$ 482 <br />COR #114 14 $ 1,574.00 <br />0 c <br />omes <br />Provide ductile iron for <br />wall and electrical revisions to second floor per PR #2 <br />door <br />id <br />P $ 81 <br />COR # 11 15 <br />15 $ <br />$ 265.0 <br />00 <br />622 , <br />e <br />rov <br />Provide rebar to header above fire doors at parking separation wall per RFI 12 and COR #41 re $ 596 $ 263 <br />COR # 41 <br />COR #108 15 $ . <br />859.00 Provide changes to luminaires and electrical connections per PR #18 rev. $ 2 450 $ 1,082 <br />COR #115 15 $ 3,532.00 Provide added PT cables at ground floor pour joints per corrected shop drawings $ ~40) $ ~~ 8~ <br />COR #116 15 $ (58.00) Provide changes to transformer room per PR #40 <br />u of 3" semi rigid insulation under the suspended slab per VER # <br />li <br />i <br />i <br />" <br />$ <br />(6,462) <br />$ <br />(2,855) <br />COR #118 15 <br />5 $ <br />$ (9,317.00) <br />00 <br />923 <br />6 e <br />n <br />on <br />batt insulat <br />Provide 4 <br />Provide dowels at parking level SOG joints. Grind where SOG has been poured and has curle $ ~~880 $ 260 <br />3 <br />COR #119 <br />#121 1 <br />15 $ . <br />, <br />00) <br />640 <br />(10 Provide series rated switch-gear in lieu of specified system per VER #5 $ (1 <br />443) $ , <br />( 638) <br />COR <br />COR #122 15 $ . <br />, <br />2,081.00 Stop gypsum board 6" above ceiling height at all perimeter walls per VER #14 <br />t $ , <br />(3 <br />) <br />5 <br />) <br />(1 <br />COR #123 15 $ (5,200.00) Deduct cost of all foreign made reinforcing that has been supplied for use on projec $ 200 $ 89 <br />, <br />COR #124 15 $ 289.00 Provide conduit for PGE vault per PR #56 <br />er PR #41-electric assist in RM 3145/mechanical in RM 322 <br />stem <br />s <br />li <br />f <br />$ <br />9 _ <br />COR #105 16 $ 91,812.00 p <br />y <br />i <br />ng <br />Provide space saver <br />beam and column to encase electrical duct bank per RFI 182 <br />t <br />$ 4,507 $ 1,991 <br />COR # 43 <br />COR #80 17 <br />17 $ <br />$ 6,498.00 <br />2,061.00 e <br />Provide concre <br />Provide increased plate sizes per RFI 318 <br />Action Pride in lieu of specified manufacturer per VER #7 <br />ctured b <br />f <br />k <br /> <br />$ 1,430 <br /> <br />(2,924) $ <br /> <br />$ 631 <br /> <br />(1,291) <br />COR #98 17 $ (4,215.00) <br />0 y <br />a <br />manu <br />Proide casewor <br />tenant improvement modifications per PR #50 <br />id <br />P $ 205,994 $ <br />COR #111 <br />COR #112 17 <br />17 $ <br />$ 205,994.0 <br />9,647.00 e <br />rov <br />Provide tenant improvement modifications per PR #51 $ <br />$ _ <br />300 <br />4 $ <br />$ 9,647 <br />~,899 <br />COR #124 17 $ 6,199.00 Provide additional fire extinguishers and cabinets per PR #23 $ , <br />613 <br />1 $ 713 <br />COR #125 17 $ 2,326.00 Provide changes to elevator cab per PR #37 $ , <br />134 <br />1 $ 501 <br />COR #127 17 $ 1,635.00 Provide brick control joints per RFI 243 $ , $ _ <br />COR #128 17 $ - Provide changes to door glass per PR #43 <br />Court Street w/ fiber optics connection (Alternate'A") per PR #36 <br />$ <br />47,227 <br />$ <br />20,863 <br />COR #129 17 <br />7 $ <br />$ 68,090.00 Provide conduit across <br />00) Provide sheet drain at perimeter retaining wall in lieu of drain rock and filter fabric per VER #15 <br />500 <br />(1 $ ~1 ~ <br />) (489) <br />COR #130 <br />133 1 <br />17 $ . <br />, <br />00 <br />292 Provide access hatch changes to restrooms #'s 1144, 1153, 1154 per RFI 388 $ 203 <br />224 $ <br />$ 750 <br />2 <br />COR # <br />COR #136 17 $ . <br />8,974.00 Provide changes to elevator machine room per PR #60 and RFI 323 $ 6 <br />457 <br />1 $ , <br />644 <br />COR #143 17 $ 2,101.00 Provide changes to doors and partitions per PR #33 $ , <br />~~g $ 313 <br />COR #147 17 $ 1,022.00 Provide bus driveway connection per RFI 374 $ 796 $ 352 <br />COR #149 17 $ 1,148.00 Provide changes to steel pipe support at bay windows per RFI 374 $ 675 $ 298 <br />COR #150 17 $ 973.00 Provide for increased column sizes per RFI 227 $ 1,433 $ 633 <br />COR #151 17 $ 2,066.00 Provide corner guards per RFI 414 $ g~g g 300 <br />COR #155 17 $ 979.00 Provide infill to underside of north stairs per PR #73 <br />