6 $ 00 <br />437 <br />32 Provide six parallel parking stalls w/ covered walkway -relocate future job trailers to Church $ 22,498 $ 9,939 <br />COR # 28 <br />COR #51 7 $ . <br />, <br />90,846.00 '" Excavation of unsuitable subgrade~ll in areas of unsuitable or contaminated soils $ <br />$ 67,965 <br />671 <br />3 $ <br />$ 22,881 <br />621 <br />1 <br />COR # 24 8 <br />8 $ <br />$ 5,292.00 <br />00 <br />550 <br />23 Slab transition revisions <br />Upgrade windows to Sungate 1000 at three building faces $ , <br />16,334 $ , <br />7,216 <br />COR #55 . <br />, $ 1,088 $ 481 <br />COR #57 8 $ 1,569.00 Change column in hearing room $ 569 $ 252 <br />COR #59 8 $ 821.00 Added column ties $ 461 <br />1 $ 646 <br />COR #61 8 $ 2,107.00 Added rebar on GF1 per shop drawings $ , <br />526 $ 232 <br />COR #62 8 $ 758.00 Luminar base at flagpole $ 602 <br />1 $ 7~8 <br />COR #63 8 $ 2,310.00 Stand pipe changes per PR #3 $ , <br />28,214 $ 12,464 <br />COR #64 8 $ 40,678.00 Added rebar at pour strips $ (2,497) $ (1,103) <br />COR #65 8 $ (3,600.00) Delete 2' sand layer $ 144 $ 64 <br />COR #66 8 $ 208.00 Added steel bracing at canopy $ 6,412 $ 2,833 <br />COR #67 8 $ 9,245.00 Change door frames per PR #31 $ 384 $ 169 <br />COR #68 8 $ 553.00 Owner's job shack phone $ 80 $ 36 <br />COR #69 8 $ 116.00 Provide dowels at east stairwell $ 257 $ 114 <br />COR #70 8 $ 371.00 Provide thickened generator slab $ 1,527 $ 674 <br />COR #71 8 $ 2,201.00 Provide changes to air intake $ 318) <br />(3 $ <br />COR #72 8 $ (3,318.00) NTE credit on removal of three tanks $ , <br />655 <br />3 $ 1,614 <br />COR #73 8 $ 5,269.00 Provide changes to column base $ , <br />669 $ 295 <br />COR #78 8 $ 964.00 Added dowels and shear head $ 115 <br />1 $ 492 <br />COR # 34 9 $ 1,607.00 Add (4) hot water hose bibs per PR #8 $ , <br />21,735 $ 9,601 <br />COR # 37 9 <br />9 $ <br />$ 31,336.00 <br />00) <br />(17 Provide sump pit per PR #9 <br />Provide revisions to electrical drawings per PR #16 $ ~12~ $ (5) <br />COR #75 <br />COR #76 <br />9 <br />$ . <br />11,157.00 <br />Provide changes to air at rooms per PR #27 $ <br /> <br />$ 7 738 <br />504 $ <br />$ 3,419 <br />222 <br />COR #82 9 $ 726.00 Provide two additional 4" conduit sleeves in Data/Com room per PR # 29 4~~ $ 20~ <br />COR #83 9 $ 677.00 Provide two additional 1" conduits with pull cords per PR # 28 $ <br />$ 215 <br />6 $ 2,745 <br />COR #84 9 $ 8,960.00 Provide 273 3" conduit sleeves per EC proposal alternate # 32 $ , <br />236 <br />57 $ 25,284 <br />COR #79 10 $ 82,520.00 Removal and disposal of unsuitable subgrade material <br />' $ , $ <br />31 11 $ - s requirements <br />Provide modifications to public works package per City 412 <br />COR # 11 $ 00 <br />607 <br />4 Provide access hatch and revisions to plumbing and sprinkler system $ 3,195 $ 1, <br />1 <br />COR # 32 <br />COR # 46 11 $ . <br />, <br />(20,759.00) Delete bentonite waterproofing and reduce slab thickness in same area <br />204 <br />' $ <br />$ (14,398) <br />048 <br />5 $ <br />$ (6,36 <br />) <br />230 <br />2 <br />COR # 49 11 $ 7,278.00 s 199 and <br />Provide insulation at rebar dowels and durometer bearing pad per RFI $ , <br />035 <br />2 $ , <br />$99 <br />COR #52 11 $ 2,934.00 Provide dewatering for undocumented fill areas from 5/21/99 to 6/20/99 , <br />976 $ 431 <br />COR #58 11 $ 1,407.00 Provide changes to gas pressure regulators per PR #21 $ <br />$ - $ <br />COR #77 11 $ - Changes to elevator beams per PR #34 <br />l rebar at south slab step (gridline D) per structural engineer site visit <br />dditi <br />d <br />$ 268 $ 119 <br />COR #89 11 <br />11 $ <br />$ 387.00 <br />00 <br />855 ona <br />e a <br />Provi <br />Provide reinforcing at arcade slab per RFI 297 593 $ 262 <br />856 <br />COR #93 11 $ . <br />00 <br />794 <br />2 Provide additional reinforcing and 6" hooks per submittal 2F1 and RFI 328 $ ~ 938 $ <br />703 <br />COR #94 <br />COR #95 11 $ . <br />, <br />558.00 <br />5 Provide changes to nine columns per RFI 317 $ 3,855 <br />281 $ <br />$ 1, <br />124 <br />COR #96 11 $ , <br />405.00 Provide additional reinforcing for arcade beams per RFI 319 $ <br />$ 484 <br />1 $ 655 <br />COR #99 11 $ 2,139.00 Provide slab continuation at bottom of east and west shafts per RFI 236 $ , <br />366 <br />23 $ 10,322 <br />COR #102 12 $ 33,688.00 Removal and disposal of unsuitable subgrade material , <br />