6 $ 00
<br />437
<br />32 Provide six parallel parking stalls w/ covered walkway -relocate future job trailers to Church $ 22,498 $ 9,939
<br />COR # 28
<br />COR #51 7 $ .
<br />,
<br />90,846.00 '" Excavation of unsuitable subgrade~ll in areas of unsuitable or contaminated soils $
<br />$ 67,965
<br />671
<br />3 $
<br />$ 22,881
<br />621
<br />1
<br />COR # 24 8
<br />8 $
<br />$ 5,292.00
<br />00
<br />550
<br />23 Slab transition revisions
<br />Upgrade windows to Sungate 1000 at three building faces $ ,
<br />16,334 $ ,
<br />7,216
<br />COR #55 .
<br />, $ 1,088 $ 481
<br />COR #57 8 $ 1,569.00 Change column in hearing room $ 569 $ 252
<br />COR #59 8 $ 821.00 Added column ties $ 461
<br />1 $ 646
<br />COR #61 8 $ 2,107.00 Added rebar on GF1 per shop drawings $ ,
<br />526 $ 232
<br />COR #62 8 $ 758.00 Luminar base at flagpole $ 602
<br />1 $ 7~8
<br />COR #63 8 $ 2,310.00 Stand pipe changes per PR #3 $ ,
<br />28,214 $ 12,464
<br />COR #64 8 $ 40,678.00 Added rebar at pour strips $ (2,497) $ (1,103)
<br />COR #65 8 $ (3,600.00) Delete 2' sand layer $ 144 $ 64
<br />COR #66 8 $ 208.00 Added steel bracing at canopy $ 6,412 $ 2,833
<br />COR #67 8 $ 9,245.00 Change door frames per PR #31 $ 384 $ 169
<br />COR #68 8 $ 553.00 Owner's job shack phone $ 80 $ 36
<br />COR #69 8 $ 116.00 Provide dowels at east stairwell $ 257 $ 114
<br />COR #70 8 $ 371.00 Provide thickened generator slab $ 1,527 $ 674
<br />COR #71 8 $ 2,201.00 Provide changes to air intake $ 318)
<br />(3 $
<br />COR #72 8 $ (3,318.00) NTE credit on removal of three tanks $ ,
<br />655
<br />3 $ 1,614
<br />COR #73 8 $ 5,269.00 Provide changes to column base $ ,
<br />669 $ 295
<br />COR #78 8 $ 964.00 Added dowels and shear head $ 115
<br />1 $ 492
<br />COR # 34 9 $ 1,607.00 Add (4) hot water hose bibs per PR #8 $ ,
<br />21,735 $ 9,601
<br />COR # 37 9
<br />9 $
<br />$ 31,336.00
<br />00)
<br />(17 Provide sump pit per PR #9
<br />Provide revisions to electrical drawings per PR #16 $ ~12~ $ (5)
<br />COR #75
<br />COR #76
<br />9
<br />$ .
<br />11,157.00
<br />Provide changes to air at rooms per PR #27 $
<br />
<br />$ 7 738
<br />504 $
<br />$ 3,419
<br />222
<br />COR #82 9 $ 726.00 Provide two additional 4" conduit sleeves in Data/Com room per PR # 29 4~~ $ 20~
<br />COR #83 9 $ 677.00 Provide two additional 1" conduits with pull cords per PR # 28 $
<br />$ 215
<br />6 $ 2,745
<br />COR #84 9 $ 8,960.00 Provide 273 3" conduit sleeves per EC proposal alternate # 32 $ ,
<br />236
<br />57 $ 25,284
<br />COR #79 10 $ 82,520.00 Removal and disposal of unsuitable subgrade material
<br />' $ , $
<br />31 11 $ - s requirements
<br />Provide modifications to public works package per City 412
<br />COR # 11 $ 00
<br />607
<br />4 Provide access hatch and revisions to plumbing and sprinkler system $ 3,195 $ 1,
<br />1
<br />COR # 32
<br />COR # 46 11 $ .
<br />,
<br />(20,759.00) Delete bentonite waterproofing and reduce slab thickness in same area
<br />204
<br />' $
<br />$ (14,398)
<br />048
<br />5 $
<br />$ (6,36
<br />)
<br />230
<br />2
<br />COR # 49 11 $ 7,278.00 s 199 and
<br />Provide insulation at rebar dowels and durometer bearing pad per RFI $ ,
<br />035
<br />2 $ ,
<br />$99
<br />COR #52 11 $ 2,934.00 Provide dewatering for undocumented fill areas from 5/21/99 to 6/20/99 ,
<br />976 $ 431
<br />COR #58 11 $ 1,407.00 Provide changes to gas pressure regulators per PR #21 $
<br />$ - $
<br />COR #77 11 $ - Changes to elevator beams per PR #34
<br />l rebar at south slab step (gridline D) per structural engineer site visit
<br />dditi
<br />d
<br />$ 268 $ 119
<br />COR #89 11
<br />11 $
<br />$ 387.00
<br />00
<br />855 ona
<br />e a
<br />Provi
<br />Provide reinforcing at arcade slab per RFI 297 593 $ 262
<br />856
<br />COR #93 11 $ .
<br />00
<br />794
<br />2 Provide additional reinforcing and 6" hooks per submittal 2F1 and RFI 328 $ ~ 938 $
<br />703
<br />COR #94
<br />COR #95 11 $ .
<br />,
<br />558.00
<br />5 Provide changes to nine columns per RFI 317 $ 3,855
<br />281 $
<br />$ 1,
<br />124
<br />COR #96 11 $ ,
<br />405.00 Provide additional reinforcing for arcade beams per RFI 319 $
<br />$ 484
<br />1 $ 655
<br />COR #99 11 $ 2,139.00 Provide slab continuation at bottom of east and west shafts per RFI 236 $ ,
<br />366
<br />23 $ 10,322
<br />COR #102 12 $ 33,688.00 Removal and disposal of unsuitable subgrade material ,