Laserfiche WebLink
1/10/2000 Courthouse Square <br /> Approved COR / CO Log <br /> COUNTY TRANSIT <br /> APPROVED <br /> <br />AMOUNT <br /> <br />DESCRIPTION OF CHANGE <br />ALLOCATION <br />ALLOCATION <br />COR <br />1 CO <br />1 <br />$ <br />00 <br />530 <br />2 <br />Decomission, removal and disposal of UST encountered on 3-15-99 <br />$ 2,530 $ - <br />541 <br />COR # <br />COR # 2 1 $ . <br />, <br />1,765.00 Resolve gas line conflicts during sewer line relocation $ ~,Z24 <br />215 <br />12 $ <br />$ - <br />COR # 4 1 $ 12,215.00 Removal and disposal of ccntaminated soils-203.9 c.y. <br />$ , <br />4 982 $ <br />COR # 5 1 $ 4,982.00 Decomission, removal and disposal of UST encountered along s. blockface $ 393 <br />2 $ 1,057 <br />COR # 6 1 $ 3,450.00 Increase compressive strength of footing pads from 3,000 to 5,000 psi $ , <br />16 <br />112 $ - <br />COR # 9 2 $ 16,112.00 Removal and disposal of contaminated soils-268.54 c.y. $ , <br />4~5 $ 210 <br />COR # 12 2 $ 685.00 Demolition of water vault along Court street $ 470 <br />41 $ - <br />COR # 17 2 $ 41,470.00 Removal and disposal of contaminated soils <br />radeffill in areas of unsuitable or contaminated soils <br />sub <br />bl <br />it <br />' <br />$ , <br />159,414 <br />$ <br />55,579 <br />COR # 20 3 <br />4 $ <br />$ 214,993.00 <br />00 <br />697 <br />27 g <br />e <br />a <br />Excavation of unsu <br />Removal and disposal of contaminated soils-461.62 c.y. $ 2~,69~ $ _ <br />COR # 21 <br />COR # 3 <br />5 <br />$ . <br />, <br />14,135.00 <br />Excavate, remove and dispose of three tanks in the NW corner of the site <br />$ 14,135 <br />4 832 $ <br />$ <br />2,134 <br />COR # 7 5 $ 6,966.00 Additional dewatering costs due to overexcavation $ 938 $ 938 <br />COR # 8 5 $ 1,876.00 <br />00 <br />4 Owner's share of partnering session <br />wall insulation at exterior masonry walls of rooms 1209, 1219 and 1239 <br />vide cavit <br />P <br />$ 967 $ 42~ <br />COR # 10 <br />COR # 13 5 <br />5 $ <br />$ . <br />1,39 <br />(700.00) y <br />ro <br />Delete sump pump at elevator #1 <br />t $ <br />$ (486) <br />986) <br />(12 $ <br />$ (214) <br />737) <br />(5 <br />COR # 18 5 $ (18,723.00) em <br />VE proposal #1-Delete low "E" coating on #3 surtace of bus mall glass canopy sys <br />i <br />ft $ , <br />210) <br />(1 $ , <br />(534) <br />COR # 19 5 $ (1,744.00) op equ <br />p. <br />VE proposal #1-Replace 1600 amp bus duct with conduit and wire for feed to roo $ , <br />602 <br />3 $ 591 <br />1 <br />COR # 22 5 $ 5,193.00 Provide couplers at top of parking level columns for future north pad development $ , <br />(305) $ , <br />(135) <br />COR # 23 5 $ (440.00) Delete PT tendon locators $ 689 $ 304 <br />COR # 26 5 $ 993.00 Revise column ties after fabrication $ 373 $ 165 <br />COR # 27 5 $ 538.00 Provide column tail revisions $ 613 <br />6 $ 2,92~ <br />COR # 29 5 $ 9,534.00 Revise column reinforcement detail $ , <br />925 <br />1 $ 850 <br />COR # 30 5 $ 2,775.00 Provide added rebar at isolation joints $ , <br />(750) $ (331) <br />COR # 33 5 $ (1,081.00) <br />00 Delete link seal and ESP-1 <br />e columns to go to roof level at grids O/11 and O/12 <br />i <br />R $ 4,213 $ 1,861 <br />COR # 35 5 <br />5 $ <br />$ ev <br />s <br />6,074. <br />00) Revise column type at grid J-10a <br />547 <br />(2 $ ~1 767~ $ ~~80~ <br />242 <br />COR # 36 <br />COR # 38 5 $ . <br />, <br />790.00 Provide reinforcing at SOG beneath columns $ <br />g 548 <br />424 <br />1 $ <br />$ 62g <br />COR # 39 5 <br />5 $ <br />$ 2,053.00 Provide added footing and column <br />00) VE proposal #3-Revise precast panels to mitered corners instead of "U" shape <br />962 <br />(8 <br />$ , <br />6,216 <br />( ) $ 2,746 <br />~ ~ <br />COR # 42 . <br />, $ <br />COR # 44 5 $ - Provide flourescent lamp revisions $ $ _ <br />COR # 45 5 $ - Provide hollow metal frame revisions $ 668 $ 295 <br />COR # 47 5 $ 963.00 Provide floor hardener at rooms 1209, 1219, and 1239 <br />ounted water closet to floor mounted water closet in room 1224 <br />ll <br />$ 73 $ 32 <br />COR # 48 5 <br />5 $ <br />$ 105.00 <br />00 <br />315 m <br />Change wa <br />Remove and dispose of UST adjacent to Church Street 315 $ - <br />9~6 <br />COR #50 <br />COR #53 5 $ . <br />3,186.00 Revise foundation drain pipe specification $ <br />$ 2,210 <br />839 $ <br />$ 371 <br />COR #54 5 $ 1,210.00 Provide added rebar for pilaster at the SW air shaft $ ~58~ $ (25) <br />COR #56 5 $ (83.00 ) Provide changes to glazing <br />