My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Melvin Mark- Change Order Requests Log
>
CS_Courthouse Square
>
Melvin Mark- Change Order Requests Log
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:09:43 PM
Creation date
8/1/2011 10:17:17 AM
Metadata
Fields
Template:
Building
RecordID
10252
Title
Melvin Mark- Change Order Requests Log
Company
Melvin Mark
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
COR #237 23 $ 699.00 <br />3 Provide additional terminal unit for Treasurer's office per PR #97 $ 3,699 $ - CO <br />COR #240 23 $ , <br />851.00 <br />33 Provide improvements for Treasurer's office on fifth floor per PR # 95 $ 33,851 $ - CO <br />COR #245 23 $ , <br />2,795.00 Provide doors and switches per PR #95 $ <br />$ 2,234 <br />2 <br />123 $ <br />$ 561 <br />938 B <br />P-Streetcape <br />COR #248 23 $ 3,061.00 Provide Chemeketa Street light per PR #99 <br />its at SE corner of the project to make room for storm drain per <br />d <br />PGE <br />L $ , <br />1,698 $ 750 P-Streetcape <br />COR #249 23 <br />23 $ <br />$ 2,448.00 <br />00) <br />(615 con <br />u <br />ower <br />Delete electric wall heaters in all restrooms except 1251 1231 per RFI 2545 $ (492) $ (123) B <br />COR #254 <br />COR #255 23 $ . <br />366.00 <br />2 Provide additional electrical receptacles and data/com outlets per PR #96 $ 1,891 $ 475 B <br />COR #257 23 $ , <br />113.00 <br />1 Add fire dampers to ducts above trash room per RFI 509 $ 890 $ 223 B <br />COR #258 23 $ , <br />1,386.00 Provide cold water supply to CRU-1 $ 1,108 <br />207 $ <br />$ 278 <br />52 B <br />B <br />COR #259 23 $ 259.00 Provide sheetrock repair per RFI 482 <br />17 <br />00 $ <br />$ - $ 706 <br />83 TO <br />COR #261 23 $ 706.00 <br />83 - <br />Provide cctv security cameras per PR #68 and ACA faxes from 2-8-00 and 2- , <br />COR #262 23 $ , <br />257.00 <br />7 Provide woodwork for hearing rooms grills and columns per PR #102 $ 3,629 $ 3,629 50/50 <br />COR #264 23 $ , <br />420.00 Provide additional fence at generator room along ramp wall per RFI 525 $ 291 $ 129 P <br />COR #266 23 $ 680.00 <br />2 Provide storm drain revisions per Westech Engineering memo dated 5-8-00 $ 1,859 $ 821 P-Streetcape <br />COR #268 23 $ , <br />894.00 Provide emergency exit illumination at elevator lobby per PR #109 $ ~~ 5 $ ~ 79 B <br />COR #274 23 $ 414.00 Provide vinyl applique street address numbers per PR # 116 $ <br />--- 331 <br />---------- $ <br />----- 83 <br />---------- B <br /> ------------ <br />$2,101,029.00 Total Committed-Construction Change Orders $ 1,480,597 $ 620,432 <br />600 of COR #20 is a <br />*$33 County only cost as it is related to the backfilling of areas that were environmentally impacted. <br />, <br />*' $16,170 of COR #5 1 is a County only cost as it is related to the backfilling of areas that were environmentally impacted. <br />Note Key: <br />P-->Project Split <br />B-->Building Split <br />CO-->County Only Cost <br />TO-->Transit Only Cost <br />50/50-->50°/a Split Between Owners <br />NC-->No Cost to Owners <br />
The URL can be used to link to this page
Your browser does not support the video tag.