Laserfiche WebLink
COR #101 14 $ 654.00 Provide electrical power to the tower clock per RFI 233 $ - $ <br />$ 654 <br />294 TO <br />TO <br />COR #103 14 $ 294.00 Provide changes to bridge connection detail 9/S6.1.1 per RFI 343 $ 146 P <br />COR #107 14 $ 475.00 Provide additional PT cables and reinforcing @ grid M/10b <br />i $ <br />$ 329 <br />749 <br />5 $ <br />$ 1 <br />443 B <br />COR #110 14 $ 192.00 <br />7 ew <br />Provide additional reinforcing @ floors 3, 4, 5 per structural shop drawing rev , , <br />2 P <br />COR #114 14 $ , <br />574 <br />00 <br />1 Provide ductile iron for domestic and fire water service in lieu of copper per City of Salem $ 1,092 $ 48 <br />COR # 11 15 $ . <br />, <br />265.00 Provide door, wall and electrical revisions to second floor per PR #2 $ 212 $ 53 B <br />P <br />COR # 41 15 $ 622.00 Provide rebar to header above fire doors at parking separation wall per RFI 12 and COR #41 rev. $ 431 $ 191 <br />COR #108 15 $ 859.00 Provide changes to luminaires and electrical connections per PR #18 rev. $ 687 $ 172 B <br />B <br />COR #115 15 $ 532.00 <br />3 Provide added PT cables at ground floor pour joints per corrected shop drawings $ 2,823 $ 709 <br />COR #116 15 $ , <br />(58.00) Provide changes to transformer room per PR #40 $ <br />lation in lieu of 3" semi rigid insulation under the suspended slab per VER #13 $ <br />tt i <br />4" b ~4~~ <br />(7,447) $ <br />$ ~~8~ <br />(1,870) P <br />B <br />COR #118 <br />119 15 <br />15 $ <br />$ (9,317.00) <br />923 <br />00 <br />6 nsu <br />a <br />Provide <br />Provide dowels at parking level SOG joints. Grind where SOG has been poured and has curled $ 4,802 $ 2,121 P <br />COR # <br />1 15 $ . <br />, <br />640 <br />00) <br />(10 Provide series rated switch-gear in lieu of specified system per VER #5 $ (7,380) $ (3,260) P <br />COR #12 <br />#122 15 $ . <br />, <br />081 <br />00) <br />(2 Stop gypsum board 6" above ceiling height at all perimeter walls per VER #14 $ (1,663) $ (4~$) B <br />COR <br />COR #123 15 $ . <br />, <br />200.00) <br />(5 Deduct cost of all foreign made reinforcing that has been supplied for use on project $ (3,607) $ (1,593) P <br />P <br />COR #124 15 $ , <br />289.00 Provide conduit for PGE vault per PR #56 <br />stem per PR #41-electric assist in RM 3145/mechanical in RM 3228 <br />s <br />ver filin <br />d $ <br />$ 2~0 <br />91,812 $ <br />$ 89 CO <br />COR #105 16 <br />17 $ <br />$ 91,812.00 <br />00 <br />498 <br />6 y <br />g <br />e space sa <br />Provi <br />Provide concrete beam and column to encase electrical duct bank per RFI 182 $ 4,507 $ 1,991 P <br />COR # 43 <br />COR #80 17 $ . <br />, <br />2,061.00 Provide increased plate sizes per RFI 318 $ 1,430 <br />3 <br />369 $ <br />$ 631 <br />~846~ P <br />COR #98 17 $ 215.00) <br />(4 Proide casework manufactured by Action Pride in lieu of specified manufacturer per VER #7 $ , <br />) <br />( CO <br />COR #111 17 $ , <br />205,994.00 Provide tenant improvement modifications per PR #50 $ 205,994 $ <br />$ - <br />647 <br />9 <br />TO <br />COR #112 17 $ 9,647.00 Provide tenant improvement modifications per PR #51 $ <br />$ - <br />4 <br />955 $ , <br />1,244 B <br />COR #124 17 $ 6,199.00 Provide additional fire extinguishers and cabinets per PR #23 $ , <br />613 <br />1 $ 713 P <br />COR #125 17 $ 2,326.00 Provide changes to elevator cab per PR #37 $ , <br />134 <br />1 $ 501 P <br />COR #127 17 $ 1,635.00 Provide brick control joints per RFI 243 $ , <br />- $ - NC <br />COR #128 17 $ - Provide changes to door glass per PR #43 <br />it across Court Street w/ fiber optics connection (Alternate 'A") per PR #36 <br />d <br />id $ 54,424 $ 13,666 B <br />COR #129 <br />30 17 <br />17 $ <br />$ e con <br />u <br />68,090.00 Prov <br />00) Provide sheet drain at perimeter retaining wall in lieu of drain rock and filter fabric per VER #15 <br />500 <br />(1 $ (1,040) $ (460) P <br />COR #1 <br />3 17 $ , <br />. <br />00 <br />292 Provide access hatch changes to restrooms #'s 1144, 1153, 1154 per RFI 388 $ - $ 292 TO <br />COR #13 <br />COR #134 17 $ . <br />64,768.00 Provide cable trays on floors 2-5 per PR # 65 $ 51,769 <br />224 <br />6 $ <br />$ 12,999 <br />2 <br />750 B <br />P <br />COR #136 17 $ 8,974.00 Provide changes to elevator machine room per PR #60 and RFI 323 $ , , CO <br />COR #143 17 $ 2,101.00 Provide changes to doors and partitions per PR #33 $ <br />$ 2,101 <br />- $ <br />$ - <br />1,022 TO-Streetscape <br />COR #147 17 $ 1,022.00 Provide bus driveway connection per RFI 374 $ 918 $ 230 B <br />COR #149 17 $ 1,148.00 Provide changes to steel pipe support at bay windows per RFI 374 778 $ ~95 B <br />COR #150 17 $ 973.00 Provide for increased column sizes per RFI 227 $ <br />$ 651 <br />1 $ 415 B <br />COR #151 17 $ 2,066.00 Provide corner guards per RFI 414 $ , <br />679 $ 300 P <br />COR #155 17 $ 979.00 Provide infill to underside of north stairs per PR #73 <br />1 <br />' $ 141 <br />4 $ 1 <br />830 P <br />COR # 90r 18 $ 971.00 <br />5 s 143, 311 and 32 <br />Provide additional tube steel columns at elevator shaft #3, per RFI , , P <br />COR #131 r 18 $ , <br />2,455.00 Provide transformer sled per PR #63 $ <br />$ 1,703 <br />453 $ <br />$ 752 <br />453 50/50 <br />COR #135 18 $ 905.00 Provide modified sequence of operation for AC #4 per RFI #284 438 $ 110 B <br />COR #144 18 $ 548.00 Provide embeds for brick support under bay windows per RFI #400 $ 160 P <br />COR #145 18 $ 523.00 Provide repair to arcade beams per RFI #364 $ <br />$ 363 <br />77 <br />197 $ <br />$ 19,384 B <br />COR #153 18 $ 96,581.00 Provide access control system per PR #35 $ , <br />367 $ 162 P <br />COR #154 18 $ 529.00 Provide fire / smoke damper per RFI #417 $ 524 $ 131 B <br />COR #160 18 $ 655.00 Provide brick support above louver per RFI #283 <br />