COR #55 8 $ 23,550.00 Upgrade windows to Sungate 1000 at three building faces $ 18,824 <br />785 $ <br />$ 4,726 <br />785 B <br />50/50 <br />COR #57 8 $ 1,569.00 Change column in hearing room $ <br />$ 569 $ 252 P <br />COR #59 8 $ 821.00 Added column ties $ 1,461 $ 646 P <br />COR #61 8 $ 2,107.00 Added rebar on GF1 per shop drawings $ 526 $ 232 P <br />COR #62 8 $ 758.00 Luminar base at flagpole $ 1,846 $ 464 B <br />COR #63 S $ 2,310.00 Stand pipe changes per PR #3 $ 32,514 $ 8,164 B <br />COR #64 8 $ 40,678.00 Added rebar at pour strips $ (2,497) $ (1,103) P <br />COR #65 8 $ (3,600.00) Delete 2' sand layer $ - $ 208 TO <br />COR #66 8 $ 208.00 Added steel bracing at canopy $ 245 <br />9 $ ~~ <br />COR #67 8 $ 9,245.00 Change door frames per PR #31 $ ' <br />384 $ 169 P <br />COR #68 8 $ 553.00 Owner's job shack phone $ 93 $ 23 B <br />COR #69 8 $ 116.00 Provide dowels at east stairvvell $ 257 $ 114 P <br />COR #70 8 $ 371.00 Provide thickened generator slab $ 1,527 $ 674 P <br />COR #71 8 $ 2,201.00 Provide changes to air intake $ 318) <br />(3 $ - CO <br />COR #72 8 $ (3,318.00) NTE credit on removal of three tanks $ , <br />3,655 $ 1,614 P <br />COR #73 8 $ 5,269.00 Provide changes to column base $ 669 $ 295 P <br />COR #78 S $ 964.00 Added dowels and shear head $ 284 <br />1 $ 323 B <br />COR # 34 9 $ 1,607.00 Add (4) hot water hose bibs per PR #8 $ , <br />21,735 $ 9,601 P <br />COR # 37 9 $ 31,336.00 Provide sump pit per PR #9 $ (12) $ (5) P <br />COR #75 9 $ (17.00) Provide revisions to electrical drawings per PR #16 $ 7 <br />738 $ 3,419 P <br />COR #76 9 $ 11,157.00 Provide changes to air at rooms per PR #27 $ , <br />580 $ 146 B <br />COR #82 9 $ 726.00 Provide two additional 4" conduit sleeves in Data/Com room per PR # 29 339 $ 339 50/50-CCTV <br />COR #83 9 $ 677.00 Provide two additional 1" conduits with pull cords per PR # 28 $ 7 <br />162 $ 798 <br />1 B <br />COR #84 9 $ 8,960.00 Provide 273 3" conduit sleeves per EC proposal alternate # 32 $ , <br />236 <br />57 $ , <br />284 <br />25 P <br />COR #79 10 $ 82,520.00 Removal and disposal of unsuitable subgrade material $ , $ , NC <br />COR # 31 11 $ - Provide modifications to public works package per City's requirements $ <br />$ - <br />3 <br />195 $ 1,412 P-Streetscape <br />COR # 32 11 $ 4,607.00 Provide access hatch and revisions to plumbing and sprinkler system , <br />14 <br />398 $ 361 <br />(6 <br />~ P <br />COR # 46 11 $ (20,759.00) Delete bentonite waterproofing and reduce slab thickness in same area <br />' $ , <br />) <br />( <br />048 <br />5 $ , <br />2 <br />230 P <br />COR # 49 11 $ s 199 and 204 <br />278.00 Provide insulation at rebar dowels and durometer bearing pad per RFI <br />7 $ , , P <br />COR #52 11 $ , <br />934.00 Provide dewatering for undocumented fill areas from 5/21/99 to 6/20/99 <br />2 $ 2,035 $ 899 B <br />COR #58 11 $ , <br />1,407.00 Provide changes to gas pressure regulators per PR #21 $ 1,125 $ 282 NC <br />COR #77 11 $ - Changes to elevator beams per PR #34 <br />i <br />it <br />i $ - <br />309 $ - <br />7$ B <br />OR #89 11 $ te v <br />s <br />00 Provide additional rebar at south slab step (gridline D) per structural engineer s <br />387 $ $ <br />C <br />COR #93 11 $ . <br />855.00 Provide reinforcing at arcade slab per RFI 297 855 <br />561 TO <br />B <br />COR #94 11 $ 794.00 Provide additional reinforcing and 6" hooks per submittal 2F1 and RFI 328 <br />2 $ 2,233 $ P <br />COR #95 11 $ , <br />5,558.00 Provide changes to nine columns per RFI 317 $ 3,855 $ <br />$ 1,7~3 <br />405 TO <br />COR #96 11 $ 405.00 Provide additional reinforcing for arcade beams per RFI 319 $ 655 P <br />COR #99 11 $ 139.00 Provide slab continuation at bottom of east and west shafts per RFI 236 <br />2 $ 1,484 $ P <br />COR #102 12 $ , <br />33,688.00 Removal and disposal of unsuitable subgrade material $ 23,366 <br />567 <br />21 $ <br />$ 10,322 <br />- CO <br />COR #88 13 $ 21,567.00 Removal and disposal of contaminated soils-359.45 c.y. $ , <br />1 <br />089 $ 273 B <br />COR # 14 14 $ 1,362.00 Provide ductwork and supply fan revisions per PR #1 $ , <br />3 <br />195 $ 412 <br />1 P <br />COR #81 14 $ 607.00 Provide concrete ceiling above switch gear and revise CMU walls per RFI 193 <br />4 $ , , P <br /> 14 $ , <br />00 Provide additional conduit for swing gate operator per approved submittal 02710-001 <br />4 <br />686 $ 3,250 $ 1,436 <br />COR #85 <br />COR #87 14 $ , <br />. <br />877.00 Provide short wall reinforcing at parking garage lobby per RFI 160 $ 608 $ 269 P <br />B <br />COR #100 14 $ 255.00 Provide changes to exit signs per PR #42 $ 204 $ 51 <br />