COR #55 8 $ 23,550.00 Upgrade windows to Sungate 1000 at three building faces $ 18,824
<br />785 $
<br />$ 4,726
<br />785 B
<br />50/50
<br />COR #57 8 $ 1,569.00 Change column in hearing room $
<br />$ 569 $ 252 P
<br />COR #59 8 $ 821.00 Added column ties $ 1,461 $ 646 P
<br />COR #61 8 $ 2,107.00 Added rebar on GF1 per shop drawings $ 526 $ 232 P
<br />COR #62 8 $ 758.00 Luminar base at flagpole $ 1,846 $ 464 B
<br />COR #63 S $ 2,310.00 Stand pipe changes per PR #3 $ 32,514 $ 8,164 B
<br />COR #64 8 $ 40,678.00 Added rebar at pour strips $ (2,497) $ (1,103) P
<br />COR #65 8 $ (3,600.00) Delete 2' sand layer $ - $ 208 TO
<br />COR #66 8 $ 208.00 Added steel bracing at canopy $ 245
<br />9 $ ~~
<br />COR #67 8 $ 9,245.00 Change door frames per PR #31 $ '
<br />384 $ 169 P
<br />COR #68 8 $ 553.00 Owner's job shack phone $ 93 $ 23 B
<br />COR #69 8 $ 116.00 Provide dowels at east stairvvell $ 257 $ 114 P
<br />COR #70 8 $ 371.00 Provide thickened generator slab $ 1,527 $ 674 P
<br />COR #71 8 $ 2,201.00 Provide changes to air intake $ 318)
<br />(3 $ - CO
<br />COR #72 8 $ (3,318.00) NTE credit on removal of three tanks $ ,
<br />3,655 $ 1,614 P
<br />COR #73 8 $ 5,269.00 Provide changes to column base $ 669 $ 295 P
<br />COR #78 S $ 964.00 Added dowels and shear head $ 284
<br />1 $ 323 B
<br />COR # 34 9 $ 1,607.00 Add (4) hot water hose bibs per PR #8 $ ,
<br />21,735 $ 9,601 P
<br />COR # 37 9 $ 31,336.00 Provide sump pit per PR #9 $ (12) $ (5) P
<br />COR #75 9 $ (17.00) Provide revisions to electrical drawings per PR #16 $ 7
<br />738 $ 3,419 P
<br />COR #76 9 $ 11,157.00 Provide changes to air at rooms per PR #27 $ ,
<br />580 $ 146 B
<br />COR #82 9 $ 726.00 Provide two additional 4" conduit sleeves in Data/Com room per PR # 29 339 $ 339 50/50-CCTV
<br />COR #83 9 $ 677.00 Provide two additional 1" conduits with pull cords per PR # 28 $ 7
<br />162 $ 798
<br />1 B
<br />COR #84 9 $ 8,960.00 Provide 273 3" conduit sleeves per EC proposal alternate # 32 $ ,
<br />236
<br />57 $ ,
<br />284
<br />25 P
<br />COR #79 10 $ 82,520.00 Removal and disposal of unsuitable subgrade material $ , $ , NC
<br />COR # 31 11 $ - Provide modifications to public works package per City's requirements $
<br />$ -
<br />3
<br />195 $ 1,412 P-Streetscape
<br />COR # 32 11 $ 4,607.00 Provide access hatch and revisions to plumbing and sprinkler system ,
<br />14
<br />398 $ 361
<br />(6
<br />~ P
<br />COR # 46 11 $ (20,759.00) Delete bentonite waterproofing and reduce slab thickness in same area
<br />' $ ,
<br />)
<br />(
<br />048
<br />5 $ ,
<br />2
<br />230 P
<br />COR # 49 11 $ s 199 and 204
<br />278.00 Provide insulation at rebar dowels and durometer bearing pad per RFI
<br />7 $ , , P
<br />COR #52 11 $ ,
<br />934.00 Provide dewatering for undocumented fill areas from 5/21/99 to 6/20/99
<br />2 $ 2,035 $ 899 B
<br />COR #58 11 $ ,
<br />1,407.00 Provide changes to gas pressure regulators per PR #21 $ 1,125 $ 282 NC
<br />COR #77 11 $ - Changes to elevator beams per PR #34
<br />i
<br />it
<br />i $ -
<br />309 $ -
<br />7$ B
<br />OR #89 11 $ te v
<br />s
<br />00 Provide additional rebar at south slab step (gridline D) per structural engineer s
<br />387 $ $
<br />C
<br />COR #93 11 $ .
<br />855.00 Provide reinforcing at arcade slab per RFI 297 855
<br />561 TO
<br />B
<br />COR #94 11 $ 794.00 Provide additional reinforcing and 6" hooks per submittal 2F1 and RFI 328
<br />2 $ 2,233 $ P
<br />COR #95 11 $ ,
<br />5,558.00 Provide changes to nine columns per RFI 317 $ 3,855 $
<br />$ 1,7~3
<br />405 TO
<br />COR #96 11 $ 405.00 Provide additional reinforcing for arcade beams per RFI 319 $ 655 P
<br />COR #99 11 $ 139.00 Provide slab continuation at bottom of east and west shafts per RFI 236
<br />2 $ 1,484 $ P
<br />COR #102 12 $ ,
<br />33,688.00 Removal and disposal of unsuitable subgrade material $ 23,366
<br />567
<br />21 $
<br />$ 10,322
<br />- CO
<br />COR #88 13 $ 21,567.00 Removal and disposal of contaminated soils-359.45 c.y. $ ,
<br />1
<br />089 $ 273 B
<br />COR # 14 14 $ 1,362.00 Provide ductwork and supply fan revisions per PR #1 $ ,
<br />3
<br />195 $ 412
<br />1 P
<br />COR #81 14 $ 607.00 Provide concrete ceiling above switch gear and revise CMU walls per RFI 193
<br />4 $ , , P
<br /> 14 $ ,
<br />00 Provide additional conduit for swing gate operator per approved submittal 02710-001
<br />4
<br />686 $ 3,250 $ 1,436
<br />COR #85
<br />COR #87 14 $ ,
<br />.
<br />877.00 Provide short wall reinforcing at parking garage lobby per RFI 160 $ 608 $ 269 P
<br />B
<br />COR #100 14 $ 255.00 Provide changes to exit signs per PR #42 $ 204 $ 51
<br />
|