Laserfiche WebLink
si2aioo Courthouse Square <br /> Approved COR / CO Log <br /> COUNTY TRANSIT <br />COR CO APPROVED <br />AMOUNT DESCRIPTION OF CHANGE ALLOCATION ALLOCATION Notes <br />COR # 1 1 $ 530.00 Decomission, removal and disposal of UST encountered on 3-15-99 <br />2 $ 2,530 $ - CO <br />COR # 2 1 $ , <br />1,765.00 Resolve gas line conflicts during sewer line relocation $ 1,224 $ 541 P-Streetscape <br />CO <br />COR # 4 1 $ 12,215.00 Removal and disposal of contaminated soils-203.9 c.y. $ 12,215 <br />4 <br />982 $ <br />$ - <br />- CO <br />COR # 5 1 $ 00 Decomission, removal and disposal of UST encountered along s. blockface <br />982 <br />4 $ , <br />COR # 6 1 $ . <br />, <br />3,450.00 Increase compressive strength of footing pads from 3,000 to 5,000 psi $ 2,393 $ 1,057 P <br />CO <br />COR # 9 2 $ 16,112.00 Removal and disposal of contaminated soils-268.54 c.y. $ 16,112 <br />475 $ <br />$ - <br />210 P <br />COR # 12 2 $ 685.00 Demolition of water vault along Court street $ <br />$ 470 <br />41 $ - CO <br />COR # 17 2 $ 41,470.00 Removal and disposal of contaminated soils <br />cavation of unsuitable subgrade/fill in areas of unsuitable or contaminated soils <br />00 ` E <br />993 $ , <br />159,414 $ 55,579 Modified P <br />COR # 20 <br />COR # 21 3 <br />4 $ <br />$ x <br />. <br />214, <br />27,697.00 Removal and disposal of contaminated soils-461.62 c.y. $ 27,697 <br />14 <br />135 $ <br />$ - <br />- CO <br />CO-Streetscape <br />COR # 3 5 $ 135.00 Excavate, remove and dispose of three tanks in the NW corner of the site <br />14 $ , P <br />COR # 7 5 $ , <br />6,966.00 Additional dewatering costs due to overexcavation $ <br />$ 4,832 <br />938 $ <br />$ 2,134 <br />938 50/50 <br />COR # 8 5 $ 1,876.00 Owner's share of partnering session <br />wall insulation at exterior masonry walls of rooms 1209, 1219 and 1239 <br />00 Provide cavit <br />394 <br />1 $ 967 $ 427 P <br />COR # 10 5 $ y <br />. <br />, $ (560) $ (140) B <br />COR # 13 5 $ (700.00) Delete sump pump at elevator #1 <br />t $ (12 <br />986) $ 737) <br />(5 P <br />COR # 18 5 $ em <br />723.00) VE proposal #1-Delete low "E" coating on #3 surface of bus mall glass canopy sys <br />(18 , , B <br />COR # 19 5 $ , <br />00) VE proposal #1-Replace 1600 amp bus duct with conduit and wire for feed to rooftop equip. <br />744 <br />(1 $ (1,394) $ (350) <br />COR # 22 5 $ . <br />, <br />193.00 Provide couplers at top of parking level columns for future north pad development <br />5 $ 3,602 $ 1,591 B <br />COR # 23 5 $ , <br />(440.00) Delete PT tendon locators $ <br />$ (352) <br />689 $ <br />$ (88) <br />304 <br />P <br />COR # 26 5 $ 993.00 Revise column ties after fabrication $ 373 $ 165 P <br />COR # 27 5 $ 538.00 Provide column tail revisions $ 613 <br />6 $ 2,921 P <br />COR # 29 5 $ 9,534.00 Revise column reinforcement detail $ , <br />1,925 $ 850 P <br />COR # 30 5 $ 2,775.00 Provide added rebar at isolation joints $ (864) $ (217) B <br />COR # 33 5 $ (1,081.00) Delete link seal and ESP-1 $ 4 <br />213 $ 1,861 B <br />COR # 35 5 $ 6,074.00 Revise columns to go to roof level at grids O/11 and O/12 $ , <br />036) <br />(2 $ (511) P <br />COR # 36 5 $ (2,547.00) Revise column type at grid J-10a $ , <br />548 $ 242 P <br />COR # 38 5 $ 790.00 Provide reinforcing at SOG beneath columns $ 424 <br />1 $ 629 P <br />COR # 39 5 $ <br />$ 2,053.00 Provide added footing and column <br />roposal #3-Revise precast panels to mitered corners instead of "U" shape <br />00) VE <br />962 <br />8 $ , <br />(6,216) $ (2,746) P <br />COR # 42 5 p <br />. <br />, <br />( $ - $ NC <br />COR # 44 5 $ - Provide flourescent lamp revisions $ - $ _ NC <br />COR # 45 5 $ - Provide hollow metal frame revisions $ 668 $ 295 P <br />COR # 47 5 $ 963.00 Provide floor hardener at rooms 1209, 1219, and 1239 73 $ 32 P <br />COR # 48 5 $ 105.00 Change wall mounted water closet to floor mounted water closet in room 1224 $ 315 $ - CO-Streetscape <br />COR #50 5 $ 315.00 Remove and dispose of UST adjacent to Church Street $ 2 <br />210 $ 976 P <br />COR #53 5 $ 3,186.00 Revise foundation drain pipe specification $ <br />$ , <br />839 $ 371 P <br />COR #54 5 $ 1,210.00 Provide added rebar for pilaster at the SW air shaft 58 $ (25) P <br />COR #56 5 $ (83.00) Provide changes to glazing <br />arallel parking stalls w/ covered walkway -relocate future job trailers to Church <br />vide six <br />00 P <br />37 $ <br />$ ) <br />( <br />22,498 $ 9,939 P <br />COR # 28 6 <br />7 $ <br />$ p <br />ro <br />. <br />32,4 <br />00 " Excavation of unsuitable subgrade/fill in areas of unsuitable or contaminated soils <br />846 <br />90 $ 67,965 $ 22,881 Modified P <br />COR #51 . <br />, 3,671 $ 1,621 P <br />COR # 24 8 $ 5,292.00 Slab transition revisions <br />