COR #161 18 $ 1,324.00 Provide access panels to clock tower per PR #58 $ - $ 1,324
<br />131 TO
<br />B
<br />162 18 $ 00
<br />653 Provide changes to plenum wall in P198 per Interface Engineering (per fax dated 11/29/99) $ 522 $
<br />COR #
<br />8 18 $ .
<br />00)
<br />125
<br />(1 Subsitute 1/4"cut out aluminum letter for 1/2"thick cast letters per VER #16 $ (563) $ (563) 50/50
<br />COR #16
<br />OR #169 18 $ ,
<br />.
<br />00)
<br />396
<br />(6 Subsitute 1/4" wire glass in lieu of firelite glass at P1 lobby relites per VER #17 $ (4,436) $ (1,960) P
<br />C 19 $ .
<br />,
<br />316
<br />00
<br />77 Provide additions and revisions to the traffic signalization plan per PR #11 per the City of Salem $ - $ 77,316 TO-Streetscape
<br />COR # 97r
<br />04 19 $ ,
<br />.
<br />791
<br />00 Provide additional layer of fire rated gyp board to ceiling above trash room per RFI 329 $ 632 $ 159 B
<br />r
<br />COR #1
<br />COR #120r 19 $ .
<br />058.00
<br />1 Provide sandblast finish at exterior stairs, north side of site per PR #49 $ 734 $ 324 P
<br />COR #137 19 $ ,
<br />5,831.00 Provide changes to controls for circulation pumps per PR #47 $ 4,661 $ 1,170 B
<br />P
<br />COR #139r 19 $ 4,690.00 Provide mortar net per RFI 366 $
<br />$ 3,253
<br />790
<br />1 $
<br />$ 1,437
<br />450 B
<br />COR # 142 19 $ 2,240.00 Provide aluminum tube filler where stud walls terminate at window , P
<br />COR #148 19
<br />19 $
<br />$ 1,039.00
<br />00
<br />199
<br />169 Provide ledger angle per RFI # 403
<br />Delete bus mall topping slab and provide pavers per PR # 71 (excludes structural slab changes) $
<br />$ 721
<br />84,600 $
<br />$ 318
<br />84,600 50/50
<br />COR #152r
<br />COR #156 19 $ .
<br />,
<br />298.00
<br />5 Provide condensate drains to sanitary per RFI # 412 $ 4,235 $ 1,063 B
<br />159 19 $ ,
<br />00
<br />168
<br />6 Provide steel plate support for studs at column enclosures along grid 3a and 10 per RFI # 408 $ 4,278 $ 1,890 P
<br />COR #
<br />COR #157r 19 $ .
<br />,
<br />13,254.00 Provide window and door flashing modifications per PR # 57r $ 10,594 $ 2,660 B
<br />Solid Waste
<br />CO
<br />COR # 167 19 $ 1,609.00 Provide graphic to solid waste department carpet per PR # 72 $ 1,609
<br />~'~
<br />108 $
<br />$ -
<br />~2
<br />789~ -
<br />B
<br /> ~19 $ 00)
<br />897
<br />(13 Provide changes to roof top support for mechancial units and reduce catwalk $ ~
<br />,
<br />) ~
<br />COR #171
<br />COR #175 19 $ .
<br />,
<br />927.00 Provide 3-phase power for roll up door at room P161 per RFI # 383 $ $ 927 TO
<br />COR #178r 19 $ 2,840.00 Provide mechanical and electrical revisions per PR # 20r $ 1,970 $ 870 P
<br />B
<br />COR #179 19 $ 11,560.00 Provide additional access card security points per PR #52 $ 9,240 $ 2,320 B
<br />COR #183 19 $ 2,870.00 Provide lifting beams to top of west stairwell per PR #83 $ 2,294
<br />262
<br />17 $
<br />$ 576
<br />17
<br />262 50/50
<br />COR #185r 19 $ 34,524.00 Provide structural revisions to center bus mall island per PR # 71 $ ,
<br />872
<br />2 $ ,
<br />872
<br />2 50/50
<br />COR #186 19 $ 5,743.00 Provide date stone and time capsule per PR # 44 $ ,
<br />778 $ ,
<br />344 P
<br /> 19 $ 00
<br />122
<br />1 Provide protection board between deck waterproofing and wear slab at ramp per PR # 81 $
<br />COR #187
<br />191 19 $ .
<br />,
<br />147
<br />00)
<br />(20 Delete specified expansion joint system and subsitute Tremco expansion joint per VER # 18 $ (13,974) $ (6,173) P
<br />COR #
<br />COR #106r 20 $ .
<br />,
<br />477.00 Provide additional rebar at ground floor per RFI # 314 $ 381 $ 96
<br />206 B
<br />B
<br />COR #138 20 $ 027.00
<br />1 Provide modification and notching to ductwork at canopy braces per RFI # 338 $ 821 $
<br />COR #165 20 $ ,
<br />2,941.00 Provide set aside space for future security desk per PR #69 $ 2,351 $ 590 B
<br />COR #172 20 $ 975.00
<br />49 Provide paging system per PR #47 w/346 speakers per County plan dated 9/9/99 $ 39,945 $ 10,030
<br />
<br />COR #174
<br />20
<br />$ ,
<br />1,542.00
<br />Provide security screen at waiting room #3237 per PR #79
<br />$
<br />1,542
<br />736
<br />4
<br />$
<br />$
<br />-
<br />736
<br />4 CO
<br />
<br />50/50-CCN
<br />COR #182 20 $ 9,472.00 Provide spot cooling for AV room 1253 per PR #61 $ ,
<br />630 $ ,
<br />158 B
<br />#189 20 $ 00
<br />788 Provide additional rebar at elevator walls at roof per supplemental structural drawing dated 12/8/ 9 $
<br />COR
<br />COR #190 20 $ .
<br />047.00
<br />2 Provide support for framework @ airshaft per RFI # 351 and 305 $ 1,420 $ 627 P
<br />COR #192 20 $ ,
<br />1,612.00 Provide column type C-16 and shear head @ grid 3C per RFI # 332 $ 1,118 $ 494 P
<br />TO
<br />95 20 $ 887
<br />00
<br />2 Provide NO-CHASE series 4G grease duct system to meet duct chase code requirement $ - $ 2,887
<br />COR #1
<br />COR #197 20 $ .
<br />,
<br />413.00
<br />9 Provide photocelis (Daylight Harvesting) per PR #55 $ 7,524 $ 1,889 B-Solid Waste
<br />COR #199 20 $ ,
<br />(1,380.00 ) Leave ducts located on P1 unpainted per VER #119 $ (957) $ (423) P
<br />B
<br />00 20 $ 720
<br />00
<br />1 Provide finish changes to Transit area 1175, Lobby 1200, 1240 and Corridor 1131 per PR #67 $ 1,375 $ 345
<br />COR #2 20 $ .
<br />,
<br />00
<br />1
<br />710 Provide two hose bibbs with freeze proof faucets at the east and west mechanical shafts $ 1,367 $ 343 B
<br />COR #201 r
<br />COR #202 20 $ ,
<br />.
<br />3,206.00 Provide exhaust duct from air room P298 per PR # 84 $ 2,224 $ 982 P
<br />TO
<br />COR # 203 20 $ 977.00 Provide changes to detail 5/A2.8 per RFI # 453 $
<br />$ -
<br />- $
<br />$ 977
<br />617
<br />1 TO
<br />COR #204 20 $ 1,617.00 Provide additional water closet to room 1272 per revised PR #82 ,
<br />76 P
<br />COR #209 20 $ 249.00 Provide columnette for precast at grid 10-B per RFI # 315 $ 173
<br />711
<br />2 $
<br />$ (681) B
<br />COR # 40 21 $ 392.00) Provide changes to fire rating of Lobby 1200 per PR #10
<br />(3 $ )
<br />(
<br />, TO
<br />COR #141 21 $ ,
<br />10,327.00 Provide changes to Transit Operations Rooms per PR #70 and RFI 410 $ - $ 10,327