COR # 142 19 $ 2,240.00 Provide aluminum tube filler where stud walls terminate at window $
<br />$ 1,790
<br />721 $
<br />$ 450
<br />318 B
<br />P
<br />COR #148 19 $ 1,039.00
<br />00
<br />9 Provide ledger angle per RFI # 403
<br />te bus mall topping slab and provide pavers per PR # 71 (excludes structural slab changes)
<br />l
<br />D $ 84,600 $ 84,600 50/50
<br />COR #152r 19
<br />19 $
<br />$ 169,19
<br />.
<br />00
<br />298
<br />5 e
<br />e
<br />Provide condensate drains to sanitary per RFI # 412 4,235 $ 1,063
<br />1
<br />890 B
<br />P
<br />COR #156 19 $ .
<br />,
<br />00
<br />168
<br />6 Provide steel plate support for studs at column enciosures along grid 3a and 10 per RFI # 408 $ 4,278 $ ,
<br />60 B
<br />COR #159
<br />COR #157r 19 $ .
<br />,
<br />13,254.00 Provide window and door flashing modifications per PR # 57r $
<br />$ 10,594
<br />609
<br />1 $
<br />$ 2,6
<br />- CO-Solid Waste
<br />COR # 167 19 $ 1,609.00 Provide graphic to solid waste department carpet per PR # 72 ,
<br />108
<br />11
<br />( ) 2,789
<br />~ ~ B
<br />COR #171 19 $ (13,89~.00) Provide changes to roof top support for mechancial units and reduce catwalk $ , $ g27 TO
<br />COR #175 19 $ 927.00 Provide 3-phase power for roll up door at room P161 per RFI # 383 $ 1 970 $ $~~ P
<br />COR #178r 19 $ 2,840.00 Provide mechanical and electrical revisions per PR # 20r $ 9 240 $ 2,320 B
<br />COR #179 19 $ 11,560.00 Provide additional access card security points per PR #52 $ 2 294 $ 576 B
<br />COR #183 19 $ 2,870.00 Provide lifting beams to top of west stairwell per PR #83 $ ~ 7 262 $ 17,262 50/50
<br />COR #185r 19 $ 34,524.00 Provide structural revisions to center bus mall island per PR # 71 $ 2 872 $ 2 g~2 50/50
<br />COR #186 19 $ 5,743.00 Provide date stone and time capsule per PR # 44
<br />d between deck waterproofing and wear slab at ramp per PR # 81
<br />b
<br />ti
<br />$ ~~g $ 344 P
<br />COR #187 19
<br />19 $
<br />$ 1,122.00
<br />00)
<br />147
<br />(20 oar
<br />on
<br />Provide protec
<br />Delete specified expansion joint system and subsitute Tremco expansion joint per VER # 18 $ (13,974) $ (6,173)
<br />96 P
<br />B
<br />COR #191
<br />COR #106r 20 $ .
<br />,
<br />477.00 Provide additional rebar at ground floor per RFI # 314 $ 38~
<br />821 $
<br />$ 206 B
<br />COR #138 20 $ 1,027.00 Provide modification and notching to ductwork at canopy braces per RFI # 338 $ 351
<br />2 $ 590 B
<br />COR #165 20 $ 2,941.00 Provide set aside space for future security desk per PR #69 ,
<br />945
<br />39 $ 030
<br />10 B
<br />COR #172 20 $ 49,975.00 Provide paging system per PR #47 w/346 speakers per County plan dated 9/9/99 $ ,
<br />~ 542 $ ,
<br />_ CO
<br />COR #174 20 $ 1,542.00 Provide security screen at waiting room #3237 per PR #79 $ 736
<br />4 $ 4,736 50/50-CCTV
<br />COR #182 20 $ 9,472.00 Provide spot cooling for AV room 1253 per PR #61
<br />tor walls at roof per supplemental structural drawing dated 12/8/~
<br />v
<br />t
<br />l
<br />b ,
<br />630
<br />$
<br />158
<br />B
<br />COR #189 20 $ 788.00
<br />00
<br />047
<br />2 e
<br />e
<br />a
<br />ar a
<br />Provide additional re
<br />Provide support for framework @ airshaft per RFI # 351 and 305 $ 1,420 $ 627 P
<br />P
<br />COR #190
<br />COR #192 20
<br />20 $
<br />$ .
<br />,
<br />612.00
<br />1 Provide column type C-16 and shear head @ grid 3C per RFI # 332 $ 1,118 $
<br />$ 494
<br />2
<br />gg~ TO
<br />COR #195 20 $ ,
<br />2,887.00 Provide NO-CHASE series 4G grease duct system to meet duct chase code requirement $
<br />$ -
<br />524
<br />7
<br />$ ,
<br />~ 889 g-Solid Waste
<br />COR #197 20 $ 9,413.00 Provide photocells (Daylight Harvesting) per PR #55 $ ,
<br />~957) $ ~423) P
<br />COR #199 20 $ (1,380.00) Leave ducts located on P1 unpainted per VER #119
<br />1240 and Corridor 1131 per PR #&7
<br />Lobby 1200
<br />it area 1175
<br />T
<br />t
<br />$
<br />1,375
<br />$
<br />345
<br />B
<br />COR #200 20 $ 1,720.00 ,
<br />,
<br />rans
<br />o
<br />Provide finish changes
<br />bibbs with freeze proof faucets at the east and west mechanical shafts
<br />h
<br />$ 1,367 $ 343 B
<br />COR #201 r 20
<br />20 $
<br />$ 1,710.00
<br />00
<br />206
<br />3 ose
<br />Provide two
<br />Provide exhaust duct from air room P298 per PR # 84 2 224 $ 982
<br />g~~ P
<br />TO
<br />COR #202
<br />COR # 203 20 $ .
<br />,
<br />977.00 Provide changes to detail 5/A2.8 per RFI # 453 $ _
<br />_ $
<br />g 1,617 TO
<br />COR #204 20 $ 1,617.00 Provide additional water closet to room 1272 per revised PR #82 $ 173 $ 76 P
<br />COR #209 20 $ 249.00 Provide columnette for precast at grid 10-B per RFI # 315 $ ~2
<br />711) $ (681) B
<br />COR # 40 21 $ (3,392.00) Provide changes to fire rating of Lobby 1200 per PR #10
<br />$ ,
<br />_ $ ~ p 327 TO
<br />COR #141 21 $ 10,327.00 Provide changes to Transit Operations Rooms per PR #70 and RFI 410 $ (346) $ (~ 53) P
<br />COR #176 21 $ (499.00 ) Provide changes to parking garage entry gate and barrier arms per PR #80
<br />be wired to units and signal alarm @ BM
<br />t
<br />S 3,9 995 B-Soli BWaste
<br />COR #184 21 $ 4,915.00 o
<br />ensors
<br />Provide two VOC sensors, one @ ea. RAS. $ 79 $
<br />COR #193 21 $ 474.00 Provide for increased column sizes per RFI 362
<br />$ 3 994
<br />( ~
<br />$ 1,003)
<br />( B
<br />COR # 194 21 $ (4,997.00 ) Eliminate hand dtyers and replace with towel dispensers per PR #66
<br />li
<br />$ 1
<br />388 $ 348 B
<br />COR #196 21 $ 1,736.00 ne
<br />Provide for HVAC sorkstation to be located at the Courthouse building via coax data
<br />$ ,
<br />~ 726 $ 1,726 50/50-CCTV
<br />COR #198 21 $ 3,451.00 Provide conduit, junction boxes and blocking for CCTV cameras per PR #62
<br />i
<br />$ ~ 038 $ 261 B
<br />COR #205 21 $ 1,299.00 ts
<br />Provide tapered insulation at mechanical chases between rooftop air handling un
<br />~ $ ~ 8~6 TO
<br />COR #206 21 $ 1,876.00 Provide graphic behind transit counter per PR #75 and RFI 430
<br />$
<br />846
<br />$ 213 B
<br />COR #210 21 $ 1,059.00 Provide cold water shutoffs for ice makers per RFI 464
<br />"
<br />"
<br />"
<br />" $ _ $ 2,037 TO
<br />COR #211 21 $ 2,037.00 at
<br />J
<br />7
<br />Provide non-FP sill cock in canopy along grid $ 057
<br />3 $ ~67 B
<br />COR #212 21 $ 3,824.00 Provide power for future waste disposal units per PR #90 $ ,
<br />_ $ 843 TO
<br />COR #213 21 $ 843.00 Provide plate stiffeners per RFI 372
<br />
|