Laserfiche WebLink
COR # 142 19 $ 2,240.00 Provide aluminum tube filler where stud walls terminate at window $ <br />$ 1,790 <br />721 $ <br />$ 450 <br />318 B <br />P <br />COR #148 19 $ 1,039.00 <br />00 <br />9 Provide ledger angle per RFI # 403 <br />te bus mall topping slab and provide pavers per PR # 71 (excludes structural slab changes) <br />l <br />D $ 84,600 $ 84,600 50/50 <br />COR #152r 19 <br />19 $ <br />$ 169,19 <br />. <br />00 <br />298 <br />5 e <br />e <br />Provide condensate drains to sanitary per RFI # 412 4,235 $ 1,063 <br />1 <br />890 B <br />P <br />COR #156 19 $ . <br />, <br />00 <br />168 <br />6 Provide steel plate support for studs at column enciosures along grid 3a and 10 per RFI # 408 $ 4,278 $ , <br />60 B <br />COR #159 <br />COR #157r 19 $ . <br />, <br />13,254.00 Provide window and door flashing modifications per PR # 57r $ <br />$ 10,594 <br />609 <br />1 $ <br />$ 2,6 <br />- CO-Solid Waste <br />COR # 167 19 $ 1,609.00 Provide graphic to solid waste department carpet per PR # 72 , <br />108 <br />11 <br />( ) 2,789 <br />~ ~ B <br />COR #171 19 $ (13,89~.00) Provide changes to roof top support for mechancial units and reduce catwalk $ , $ g27 TO <br />COR #175 19 $ 927.00 Provide 3-phase power for roll up door at room P161 per RFI # 383 $ 1 970 $ $~~ P <br />COR #178r 19 $ 2,840.00 Provide mechanical and electrical revisions per PR # 20r $ 9 240 $ 2,320 B <br />COR #179 19 $ 11,560.00 Provide additional access card security points per PR #52 $ 2 294 $ 576 B <br />COR #183 19 $ 2,870.00 Provide lifting beams to top of west stairwell per PR #83 $ ~ 7 262 $ 17,262 50/50 <br />COR #185r 19 $ 34,524.00 Provide structural revisions to center bus mall island per PR # 71 $ 2 872 $ 2 g~2 50/50 <br />COR #186 19 $ 5,743.00 Provide date stone and time capsule per PR # 44 <br />d between deck waterproofing and wear slab at ramp per PR # 81 <br />b <br />ti <br />$ ~~g $ 344 P <br />COR #187 19 <br />19 $ <br />$ 1,122.00 <br />00) <br />147 <br />(20 oar <br />on <br />Provide protec <br />Delete specified expansion joint system and subsitute Tremco expansion joint per VER # 18 $ (13,974) $ (6,173) <br />96 P <br />B <br />COR #191 <br />COR #106r 20 $ . <br />, <br />477.00 Provide additional rebar at ground floor per RFI # 314 $ 38~ <br />821 $ <br />$ 206 B <br />COR #138 20 $ 1,027.00 Provide modification and notching to ductwork at canopy braces per RFI # 338 $ 351 <br />2 $ 590 B <br />COR #165 20 $ 2,941.00 Provide set aside space for future security desk per PR #69 , <br />945 <br />39 $ 030 <br />10 B <br />COR #172 20 $ 49,975.00 Provide paging system per PR #47 w/346 speakers per County plan dated 9/9/99 $ , <br />~ 542 $ , <br />_ CO <br />COR #174 20 $ 1,542.00 Provide security screen at waiting room #3237 per PR #79 $ 736 <br />4 $ 4,736 50/50-CCTV <br />COR #182 20 $ 9,472.00 Provide spot cooling for AV room 1253 per PR #61 <br />tor walls at roof per supplemental structural drawing dated 12/8/~ <br />v <br />t <br />l <br />b , <br />630 <br />$ <br />158 <br />B <br />COR #189 20 $ 788.00 <br />00 <br />047 <br />2 e <br />e <br />a <br />ar a <br />Provide additional re <br />Provide support for framework @ airshaft per RFI # 351 and 305 $ 1,420 $ 627 P <br />P <br />COR #190 <br />COR #192 20 <br />20 $ <br />$ . <br />, <br />612.00 <br />1 Provide column type C-16 and shear head @ grid 3C per RFI # 332 $ 1,118 $ <br />$ 494 <br />2 <br />gg~ TO <br />COR #195 20 $ , <br />2,887.00 Provide NO-CHASE series 4G grease duct system to meet duct chase code requirement $ <br />$ - <br />524 <br />7 <br />$ , <br />~ 889 g-Solid Waste <br />COR #197 20 $ 9,413.00 Provide photocells (Daylight Harvesting) per PR #55 $ , <br />~957) $ ~423) P <br />COR #199 20 $ (1,380.00) Leave ducts located on P1 unpainted per VER #119 <br />1240 and Corridor 1131 per PR #&7 <br />Lobby 1200 <br />it area 1175 <br />T <br />t <br />$ <br />1,375 <br />$ <br />345 <br />B <br />COR #200 20 $ 1,720.00 , <br />, <br />rans <br />o <br />Provide finish changes <br />bibbs with freeze proof faucets at the east and west mechanical shafts <br />h <br />$ 1,367 $ 343 B <br />COR #201 r 20 <br />20 $ <br />$ 1,710.00 <br />00 <br />206 <br />3 ose <br />Provide two <br />Provide exhaust duct from air room P298 per PR # 84 2 224 $ 982 <br />g~~ P <br />TO <br />COR #202 <br />COR # 203 20 $ . <br />, <br />977.00 Provide changes to detail 5/A2.8 per RFI # 453 $ _ <br />_ $ <br />g 1,617 TO <br />COR #204 20 $ 1,617.00 Provide additional water closet to room 1272 per revised PR #82 $ 173 $ 76 P <br />COR #209 20 $ 249.00 Provide columnette for precast at grid 10-B per RFI # 315 $ ~2 <br />711) $ (681) B <br />COR # 40 21 $ (3,392.00) Provide changes to fire rating of Lobby 1200 per PR #10 <br />$ , <br />_ $ ~ p 327 TO <br />COR #141 21 $ 10,327.00 Provide changes to Transit Operations Rooms per PR #70 and RFI 410 $ (346) $ (~ 53) P <br />COR #176 21 $ (499.00 ) Provide changes to parking garage entry gate and barrier arms per PR #80 <br />be wired to units and signal alarm @ BM <br />t <br />S 3,9 995 B-Soli BWaste <br />COR #184 21 $ 4,915.00 o <br />ensors <br />Provide two VOC sensors, one @ ea. RAS. $ 79 $ <br />COR #193 21 $ 474.00 Provide for increased column sizes per RFI 362 <br />$ 3 994 <br />( ~ <br />$ 1,003) <br />( B <br />COR # 194 21 $ (4,997.00 ) Eliminate hand dtyers and replace with towel dispensers per PR #66 <br />li <br />$ 1 <br />388 $ 348 B <br />COR #196 21 $ 1,736.00 ne <br />Provide for HVAC sorkstation to be located at the Courthouse building via coax data <br />$ , <br />~ 726 $ 1,726 50/50-CCTV <br />COR #198 21 $ 3,451.00 Provide conduit, junction boxes and blocking for CCTV cameras per PR #62 <br />i <br />$ ~ 038 $ 261 B <br />COR #205 21 $ 1,299.00 ts <br />Provide tapered insulation at mechanical chases between rooftop air handling un <br />~ $ ~ 8~6 TO <br />COR #206 21 $ 1,876.00 Provide graphic behind transit counter per PR #75 and RFI 430 <br />$ <br />846 <br />$ 213 B <br />COR #210 21 $ 1,059.00 Provide cold water shutoffs for ice makers per RFI 464 <br />" <br />" <br />" <br />" $ _ $ 2,037 TO <br />COR #211 21 $ 2,037.00 at <br />J <br />7 <br />Provide non-FP sill cock in canopy along grid $ 057 <br />3 $ ~67 B <br />COR #212 21 $ 3,824.00 Provide power for future waste disposal units per PR #90 $ , <br />_ $ 843 TO <br />COR #213 21 $ 843.00 Provide plate stiffeners per RFI 372 <br />