Laserfiche WebLink
<br />COR #214 <br />21 <br />$ <br />1,168.00 Provide DA 431 seismic ties at all window jambs in lieu of type specified <br />$ 934 <br />634 $ <br />$ 234 <br />~ 59 B <br />B <br />COR #215 21 $ 793.00 Provide a canister humidifier in CRU-1 unit <br />with 2X support at the top of the RTU curbs per RFI 475 <br />blockin <br />id <br />0 P <br />$ ~ 288 $ 323 B <br />COR #216 21 <br />21 $ <br />$ g <br />rov <br />e <br />1,611.0 <br />00 Provide bollards at the southeast corner of site per PR #89 <br />031 <br />2 ~ 409 $ 622 <br />282 <br />1 P <br />B <br />COR #217 21 $ . <br />, <br />00 Provide indoor air quality (IAQ) management plan per PR #78 <br />388 <br />6 $ 5,106 $ , <br />406 P <br />COR #218 <br />COR #219 21 $ . <br />, <br />1,326.00 Provide increased protection at sump pumps and generator per PR #91 $ 920 <br />109 <br />39 $ <br />$ 9,82~ B <br />COR #86r 22 $ 48,929.00 Provide changes to door hardware per PR #24 (w/cardreaders) $ , <br />7 <br />150 $ 3,159 P <br />COR #163r 22 $ 10,309.00 Provide changes to deck in northwest of site per PR #53 $ , <br />_ $ 3,625 TO <br />COR #220 22 $ 3,625.00 Provide modification to reception counter in rm #5120 per PR #93 <br />52 <br />$ 344 <br />14 $ 3,602 B <br />COR #222 22 $ 17,946.00 Provide card readers and exit sensors for 11 doors. Conduits, BB and power in PR # <br />' <br />$ , $ _ NC <br />COR #224 22 $ s <br />- Provide additional 100 amp, 277/480V panels to serve future needs and 3 phase FPB $ 009 <br />5 $ 1,258 B <br />COR #225 22 $ 6,267.00 Provide furring over clips around window per RFI 227 $ , <br />437 $ 193 P <br />COR #226 22 $ 630.00 Provide voice chips @ Elevators <br />poles on 'B' line and luminaires w/bases per RFI 227 <br />two fla <br />t <br />i <br />Eli <br />0 <br />$ <br />(2~~52) <br />$ <br />(g89) <br />B <br />COR #227 22 <br />22 $ <br />$ g <br />e <br />na <br />m <br />) <br />(3,241.0 <br />00 Provide three additional fire extinguishers and four additional cabinets per RFI 380 <br />941 $ 4 <br />557 TO <br />COR #228 22 $ . <br />00 Provide increased depth of inetal deck and increased gauge of bracing in bridge deck per RF <br />557 <br />4 I 48 $ _ $ , NC <br />COR #229 22 $ . <br />, <br />- Change doors and relites P240A and P2406 to aluminum instead of H/M $ _ <br />524 B <br />COR #231 <br />COR #233 22 $ 2,613.00 Provide interior signage modifications per PR #94 $ 2 089 <br />_ $ <br />$ 24,137 TO-Streetscape <br />COR #235 22 $ 24,137.00 Provide brick pavers to bus mall aprons per PR 98 $ ~~ ~ ~ 5 $ 19,363 B <br />COR #236 22 $ 96,478.00 Provide additional duplex outlets and teledata outlets per PR #39 <br />' $ 200 $ $9 P <br />COR #238 22 $ s report of 2/24/00 <br />289.00 Provide additional rebar per structural engineer _ $ ~ 385 TO <br />COR #239 22 $ 1,385.00 Provide closures for aluminum composite panels at canopy supports per RFI 455 $ $ 429 TO <br />COR #242 22 $ 429.00 Provide 30"X"30" access panel for grease duct per RFI 474 $ _ $ 277 TO <br />COR #243 22 $ 277.00 Change doors 1173 A and 1175 D to Oak per RFI 498 $ _ c~ 667 TO <br />COR #244 22 $ 667.00 Add relite between rooms 1280 and 1281 per PR #88 $ 5,669 $ 1,424 B <br />COR #246 22 $ 7,093.00 Provide (6) pairs of multimode fibers per PR #92 <br />Sherman 'Nobody" fixture instead of type SJ. SJ Fixture on site-not returnable <br />id <br />P <br />$ _ <br />$ 1,348 TO <br />COR #247 <br />COR #250 22 <br />22 $ <br />$ e <br />rov <br />1,348.00 <br />803.00 Provide chair rail in room 5125 per RFI 356 <br /> <br />~~ <br />91$~ 803 <br /> <br />( TO <br />COR #252 22 $ (2,400.00) Provide elevator intercom per Thyssen Sound elevator letter of 3/16/00 (VER) $ ' $ (2 <br />329~ TO <br />COR #253 22 $ (2,329.00) Reduce the number of banner poles per PR #101 $ (34,446) $ (15,217) P <br />COR #256 22 $ (49,663.00) Revise fibermesh requirements per PR # 15 $ _ NC <br />COR #223 23 $ - Provide revisions to Dywidag per #28 $ 1,035 $ 208 CO <br />COR #234 23 $ 1,035.00 Provide additional duplex outlets per ASI #4 <br />' <br />$ 699 <br />3 $ - CO <br />COR #237 23 $ s office per PR #97 <br />3,699.00 Provide additional terminal unit for Treasurer , <br />851 <br />33 $ - CO <br />COR #240 23 $ 33,851.00 Provide improvements for Treasurer's office on fifth floor per PR # 95 $ , <br />2 795 $ _ CO <br />COR #245 23 $ 2,795.00 Provide doors and switches per PR #95 $ 2 ~ 23 $ g3g P-Streetcape <br />COR #248 23 $ 3,061.00 Provide Chemeketa Street light per PR #99 <br />t SE corner of the project to make room for storm drain per <br />it <br />d <br />$ 1,698 $ 750 P-Streetcape <br />COR #249 23 <br />23 $ <br />$ s a <br />u <br />2,448.00 Lower PGE con <br />00) Delete electric wall heaters in all restrooms except 1251 1231 per RFI 2545 <br />(615 $ (492) $ (123) CO <br />COR #254 <br />#255 <br />O 23 $ . <br />00 Provide additionai electrical receptacles and data/com outlets per PR #96 <br />366 <br />2 $ 2,366 <br />890 $ <br />$ - <br />223 <br />B <br />R <br />C <br />COR #257 23 $ . <br />, <br />1,113.00 Add fire dampers to ducts above trash room per RFI 509 $ <br />$ 1,108 $ 2~8 B <br />COR #258 23 $ 1,386.00 Provide cold water supply to CRU-1 $ 259 $ _ CO <br />COR #259 23 $ 259.00 Provide sheetrock repair per RFI 482 <br />cameras per PR #68 and ACA faxes from 2-8-00 and 2-17-00 <br />tv securit <br />id <br />P <br />$ _ <br />$ 83,706 TO <br />50/50 <br />COR #261 23 $ y <br />e cc <br />rov <br />83,706.00 <br />odwork for hearing rooms grills and columns per PR #102 <br />id $ 3 629 3 629 P <br />COR #262 23 <br />23 $ <br />$ e wo <br />7,257.00 Prov <br />00 Provide additional fence at generator room along ramp wall per RFI 525 <br />420 $ 291 $ ~ 29 <br />821 P-Streetcape <br />COR #264 <br />OR #266 23 $ . <br />00 Provide storm drain revisions per Westech Engineering memo dated 5-8-00 <br />680 <br />2 $ 1,859 <br />715 $ <br />$ ~ ~g B <br />C . <br />, <br />exit illumination at elevator lobby per PR #109 <br />enc <br />mer <br />id <br />0 P <br />COR #268 23 $ y <br />g <br />e e <br />rov <br />894.0 <br />