COR # 41 15 $ 622.00 Provide rebar to header above fire doors at parking separation wall per RFI 12 and COR #41 rev. $ 431
<br />687 $
<br />$ 191
<br />172 P
<br />B
<br />COR #108 15 $ 859.00 Provide changes to luminaires and electricai connections per PR #18 rev. $
<br />~ 2$23 $ 709 B
<br />COR #115 15 $ 3,532.00 Provide added PT cables at ground floor pour joints per corrected shop drawings $ (40) $ (~ 8) P
<br />COR #116 15 $ (58.00) Provide changes to transformer room per PR #40
<br />tion under the suspended slab per VER #1:
<br />l
<br />id i
<br />i
<br />i
<br />" $ (7,447) $ (1,870) B
<br />COR #118 15 $ nsu
<br />a
<br />r
<br />g
<br />sem
<br />(9,317.00) Provide 4" batt insulation in lieu of 3
<br />here SOG has been poured and has curled
<br />i
<br />d
<br />t
<br />G
<br />i $ 4,802 $ 2,121 P
<br />COR #119 15 $ n
<br />w
<br />r
<br />n
<br />s.
<br />6,923.00 Provide dowels at parking level SOG jo
<br />rated switch-gear in lieu of specified system per VER #5
<br />i
<br />id $ (7,380) $ (3,260) P
<br />COR #121 15 $ e ser
<br />es
<br />(10,640.00) Prov
<br />rd 6" above ceiling height at all perimeter walls per VER #14
<br />b $ (1,663) $ (4~ $) B
<br />COR #122
<br />23 15
<br />15 $
<br />$ oa
<br />(2,081.00) Stop gypsum
<br />00) Deduct cost of all foreign made reinforcing that has been supplied for use on project
<br />200
<br />(5 $ (3,607) $ (1,593)
<br />$9 P
<br />P
<br />COR #1
<br />COR #124 15 $ .
<br />,
<br />289.00 Provide conduit for PGE vault per PR #56
<br />er PR #41-electric assist in RM 3145/mechanical in RM 3228
<br />tem
<br />f
<br />li $
<br />$ 200
<br />91,812 $
<br />$ _ CO
<br />COR #105 16 $ p
<br />ng sys
<br />i
<br />91,812.00 Provide space saver
<br />beam and column to encase electrical duct bank per RFI 182
<br />t
<br />$ 4,507 $ 1,991 P
<br />COR # 43 17 $ e
<br />6,498.00 Provide concre 1,430 $ 63~ P
<br />COR #80 17 $ 2,061.00 Provide increased plate sizes per RFI 318
<br />Action Pride in lieu of specified manufacturer per VER #7
<br />ctured b
<br />f
<br />k
<br />$
<br />(3,369)
<br />$
<br />~846~
<br />COR #98 17 $ y
<br />manu
<br />a
<br />(4,215.00) Proide casewor
<br />$
<br />994
<br />205
<br />$ CO
<br />COR #111 17 $ 205,994.00 Provide tenant improvement modifications per PR #50 $ ,
<br />_ $ 9,647 TO
<br />COR #112 17 $ 9,647.00 Provide tenant improvement modifications per PR #51 $ 4
<br />955 $ 1,244 B
<br />COR #124 17 $ 6,199.00 Provide additional fire extinguishers and cabinets per PR #23 $ ,
<br />1,613 $ 713 P
<br />COR #125 17 $ 2,326.00 Provide changes to elevator cab per PR #37 $ 1,134 $ 501 P
<br />COR #127 17 $ 1,635.00 Provide brick control joints per RFI 243 $ _ $ _ NC
<br />COR #128 17 $ - Provide changes to door glass per PR #43
<br />rt Street w/ fiber optics connection (Alternate 'A") per PR #36
<br />C
<br />$ 54,424 $ 13,666 B
<br />COR #129 17 $ ou
<br />68,090.00 Provide conduit across
<br />imeter retaining wall in lieu of drain rock and filter fabric per VER #15
<br />t
<br />i $ (1,040) $ ~29~)
<br />COR #130 17 $ per
<br />n a
<br />(1,500.00) Provide sheet dra
<br />es to restrooms #'s 1144, 1153, 1154 per RFI 388
<br />hatch chan
<br />d
<br />$ TO
<br />COR #133 17 $ g
<br />e access
<br />292.00 Provi 51,769 $ ~2,9g9 B
<br />COR #134 17 $ 64,768.00 Provide cable trays on floors 2-5 per PR # 65 6 22q $ 2,750 P
<br />COR #136 17 $ 8,974.00 Provide changes to elevator machine room per PR #60 and RFI 323 $ 2 ~~~ $ _ CO
<br />COR #143 17 $ 2,101.00 Provide changes to doors and partitions per PR #33 $ _ $ ~,p22 TO-Streetscape
<br />COR #147 17 $ 1,022.00 Provide bus driveway connection per RFI 374 $ g~ g $ 230 B
<br />COR #149 17 $ 1,148.00 Provide changes to steel pipe support at bay windows per RFI 374 $ 7~$ $ 195 B
<br />COR #150 17 $ 973.00 Provide for increased column sizes per RFI 227 $ 1,651 $ 415 B
<br />COR #151 17 $ 2,066.00 Provide corner guards per RFI 414 $ g~g $ 300 P
<br />COR #155 17 $ 979.00 Provide infill to underside of north stairs per PR #73
<br />per RFI's 143, 311 and 321
<br />teel columns at elevator shaft #3
<br />b
<br />l t
<br />i
<br />$ 4,141 $ 1,830 P
<br />COR # 90r 18 $ ,
<br />e s
<br />u
<br />ona
<br />5,971.00 Provide addit 1,703 $ 752 P
<br />COR #131 r 18 $ 2,455.00 Provide transformer sled per PR #63 $ 453 $ 453 50/50
<br />COR #135 18 $ 905.00 Provide modified sequence of operation for AC #4 per RFI #284 438 $ 110 B
<br />COR #144 18 $ . 548.00 Provide embeds for brick support under bay windows per RFI #400 $ 363 $ 160 P
<br />COR #145 18 $ 523.00 Provide repair to arcade beams per RFI #364 $ ~~ ~ g~ $ 19,384 B
<br />COR #153 18 $ 96,581.00 Provide access control system per PR #35 $ 367 $ ~62 P
<br />COR #154 18 $ 529.00 Provide fire / smoke damper per RFI #417 $ 524 $ 131 B
<br />COR #160 18 $ 655.00 Provide brick support above louver per RFI #283 $ _ g 1,324 TO
<br />COR #161 18 $ 1,324.00 Provide access panels to clock tower per PR #58
<br />wall in P198 per Interface Engineering (per fax dated 11l29/99)
<br />l
<br />$
<br />$
<br />COR #162 18 $ enum
<br />653.00 Provide changes to p
<br />t aluminum letter for 1/2"thick cast letters per VER #16
<br />t
<br />1/4"
<br />0
<br />$ 563
<br />~ ~
<br />~ 563
<br />( ~ 50/50
<br />COR #168 18 $ ou
<br />cu
<br />0) Subsitute
<br />(1,125.
<br />lass in lieu of firelite glass at P1 lobby relites per VER #17
<br />te 1/4" wire
<br />it
<br />S
<br />b
<br />00
<br />$
<br />(4,436)
<br />$
<br />(1,960) P
<br />
<br />t
<br />S
<br />COR #169 18
<br />19 $
<br />$ g
<br />s
<br />u
<br />u
<br />)
<br />(6,396.
<br />00 Provide additions and revisions to the traffic signalization plan per PR #11 per the City of Salem
<br />316
<br />77
<br />$
<br />$ 77,316
<br />~ 59 scape
<br />tree
<br />TO-
<br />B
<br />COR # 97r 19 $ .
<br />,
<br />00 Provide additional layer of fire rated gyp board to ceiling above trash room per RFI 329
<br />791 $ 632 324 P
<br />COR #104r
<br />OR #120 19 $ .
<br />00 Provide sandblast finish at exterior stairs, north side of site per PR #49
<br />1
<br />058 $ 734
<br />1 $
<br />$ 170
<br />1 B
<br />r
<br />C
<br />COR #137 19 $ ,
<br />.
<br />5,831.00 Provide changes to controls for circulation pumps per PR #47 $ 4,66
<br />3,253 $ ,
<br />1~43~ P
<br />COR #139r 19 $ 4,690.00 Provide mortar net per RFI 366
<br />
|