COR # 41 15 $ 622.00 Provide rebar to header above fire doors at parking separation wall per RFI 12 and COR #41 rev. $ 431 <br />687 $ <br />$ 191 <br />172 P <br />B <br />COR #108 15 $ 859.00 Provide changes to luminaires and electricai connections per PR #18 rev. $ <br />~ 2$23 $ 709 B <br />COR #115 15 $ 3,532.00 Provide added PT cables at ground floor pour joints per corrected shop drawings $ (40) $ (~ 8) P <br />COR #116 15 $ (58.00) Provide changes to transformer room per PR #40 <br />tion under the suspended slab per VER #1: <br />l <br />id i <br />i <br />i <br />" $ (7,447) $ (1,870) B <br />COR #118 15 $ nsu <br />a <br />r <br />g <br />sem <br />(9,317.00) Provide 4" batt insulation in lieu of 3 <br />here SOG has been poured and has curled <br />i <br />d <br />t <br />G <br />i $ 4,802 $ 2,121 P <br />COR #119 15 $ n <br />w <br />r <br />n <br />s. <br />6,923.00 Provide dowels at parking level SOG jo <br />rated switch-gear in lieu of specified system per VER #5 <br />i <br />id $ (7,380) $ (3,260) P <br />COR #121 15 $ e ser <br />es <br />(10,640.00) Prov <br />rd 6" above ceiling height at all perimeter walls per VER #14 <br />b $ (1,663) $ (4~ $) B <br />COR #122 <br />23 15 <br />15 $ <br />$ oa <br />(2,081.00) Stop gypsum <br />00) Deduct cost of all foreign made reinforcing that has been supplied for use on project <br />200 <br />(5 $ (3,607) $ (1,593) <br />$9 P <br />P <br />COR #1 <br />COR #124 15 $ . <br />, <br />289.00 Provide conduit for PGE vault per PR #56 <br />er PR #41-electric assist in RM 3145/mechanical in RM 3228 <br />tem <br />f <br />li $ <br />$ 200 <br />91,812 $ <br />$ _ CO <br />COR #105 16 $ p <br />ng sys <br />i <br />91,812.00 Provide space saver <br />beam and column to encase electrical duct bank per RFI 182 <br />t <br />$ 4,507 $ 1,991 P <br />COR # 43 17 $ e <br />6,498.00 Provide concre 1,430 $ 63~ P <br />COR #80 17 $ 2,061.00 Provide increased plate sizes per RFI 318 <br />Action Pride in lieu of specified manufacturer per VER #7 <br />ctured b <br />f <br />k <br />$ <br />(3,369) <br />$ <br />~846~ <br />COR #98 17 $ y <br />manu <br />a <br />(4,215.00) Proide casewor <br />$ <br />994 <br />205 <br />$ CO <br />COR #111 17 $ 205,994.00 Provide tenant improvement modifications per PR #50 $ , <br />_ $ 9,647 TO <br />COR #112 17 $ 9,647.00 Provide tenant improvement modifications per PR #51 $ 4 <br />955 $ 1,244 B <br />COR #124 17 $ 6,199.00 Provide additional fire extinguishers and cabinets per PR #23 $ , <br />1,613 $ 713 P <br />COR #125 17 $ 2,326.00 Provide changes to elevator cab per PR #37 $ 1,134 $ 501 P <br />COR #127 17 $ 1,635.00 Provide brick control joints per RFI 243 $ _ $ _ NC <br />COR #128 17 $ - Provide changes to door glass per PR #43 <br />rt Street w/ fiber optics connection (Alternate 'A") per PR #36 <br />C <br />$ 54,424 $ 13,666 B <br />COR #129 17 $ ou <br />68,090.00 Provide conduit across <br />imeter retaining wall in lieu of drain rock and filter fabric per VER #15 <br />t <br />i $ (1,040) $ ~29~) <br />COR #130 17 $ per <br />n a <br />(1,500.00) Provide sheet dra <br />es to restrooms #'s 1144, 1153, 1154 per RFI 388 <br />hatch chan <br />d <br />$ TO <br />COR #133 17 $ g <br />e access <br />292.00 Provi 51,769 $ ~2,9g9 B <br />COR #134 17 $ 64,768.00 Provide cable trays on floors 2-5 per PR # 65 6 22q $ 2,750 P <br />COR #136 17 $ 8,974.00 Provide changes to elevator machine room per PR #60 and RFI 323 $ 2 ~~~ $ _ CO <br />COR #143 17 $ 2,101.00 Provide changes to doors and partitions per PR #33 $ _ $ ~,p22 TO-Streetscape <br />COR #147 17 $ 1,022.00 Provide bus driveway connection per RFI 374 $ g~ g $ 230 B <br />COR #149 17 $ 1,148.00 Provide changes to steel pipe support at bay windows per RFI 374 $ 7~$ $ 195 B <br />COR #150 17 $ 973.00 Provide for increased column sizes per RFI 227 $ 1,651 $ 415 B <br />COR #151 17 $ 2,066.00 Provide corner guards per RFI 414 $ g~g $ 300 P <br />COR #155 17 $ 979.00 Provide infill to underside of north stairs per PR #73 <br />per RFI's 143, 311 and 321 <br />teel columns at elevator shaft #3 <br />b <br />l t <br />i <br />$ 4,141 $ 1,830 P <br />COR # 90r 18 $ , <br />e s <br />u <br />ona <br />5,971.00 Provide addit 1,703 $ 752 P <br />COR #131 r 18 $ 2,455.00 Provide transformer sled per PR #63 $ 453 $ 453 50/50 <br />COR #135 18 $ 905.00 Provide modified sequence of operation for AC #4 per RFI #284 438 $ 110 B <br />COR #144 18 $ . 548.00 Provide embeds for brick support under bay windows per RFI #400 $ 363 $ 160 P <br />COR #145 18 $ 523.00 Provide repair to arcade beams per RFI #364 $ ~~ ~ g~ $ 19,384 B <br />COR #153 18 $ 96,581.00 Provide access control system per PR #35 $ 367 $ ~62 P <br />COR #154 18 $ 529.00 Provide fire / smoke damper per RFI #417 $ 524 $ 131 B <br />COR #160 18 $ 655.00 Provide brick support above louver per RFI #283 $ _ g 1,324 TO <br />COR #161 18 $ 1,324.00 Provide access panels to clock tower per PR #58 <br />wall in P198 per Interface Engineering (per fax dated 11l29/99) <br />l <br />$ <br />$ <br />COR #162 18 $ enum <br />653.00 Provide changes to p <br />t aluminum letter for 1/2"thick cast letters per VER #16 <br />t <br />1/4" <br />0 <br />$ 563 <br />~ ~ <br />~ 563 <br />( ~ 50/50 <br />COR #168 18 $ ou <br />cu <br />0) Subsitute <br />(1,125. <br />lass in lieu of firelite glass at P1 lobby relites per VER #17 <br />te 1/4" wire <br />it <br />S <br />b <br />00 <br />$ <br />(4,436) <br />$ <br />(1,960) P <br /> <br />t <br />S <br />COR #169 18 <br />19 $ <br />$ g <br />s <br />u <br />u <br />) <br />(6,396. <br />00 Provide additions and revisions to the traffic signalization plan per PR #11 per the City of Salem <br />316 <br />77 <br />$ <br />$ 77,316 <br />~ 59 scape <br />tree <br />TO- <br />B <br />COR # 97r 19 $ . <br />, <br />00 Provide additional layer of fire rated gyp board to ceiling above trash room per RFI 329 <br />791 $ 632 324 P <br />COR #104r <br />OR #120 19 $ . <br />00 Provide sandblast finish at exterior stairs, north side of site per PR #49 <br />1 <br />058 $ 734 <br />1 $ <br />$ 170 <br />1 B <br />r <br />C <br />COR #137 19 $ , <br />. <br />5,831.00 Provide changes to controls for circulation pumps per PR #47 $ 4,66 <br />3,253 $ , <br />1~43~ P <br />COR #139r 19 $ 4,690.00 Provide mortar net per RFI 366 <br />