COR #&1 8 $ 2,107.00 Added rebar on GF1 per shop drawings $ <br />$ 1,461 <br />526 $ <br />$ 646 <br />232 P <br />P <br />COR #62 8 $ 758.00 Luminar base at flagpole $ 846 <br />1 $ 464 B <br />COR #63 8 $ 2,310.00 Stand pipe changes per PR #3 $ , <br />32,514 $ 8,164 B <br />COR #&4 8 $ 40,678.00 Added rebar at pour strips $ (2,497) $ (1,103) P <br />COR #65 8 $ (3,600.00) Delete 2' sand layer $ - $ 208 TO <br />COR #66 8 $ 208.00 Added steel bracing at canopy $ 245 <br />9 $ - CO <br />COR #67 8 $ 9,245.00 Change door frames per PR #31 $ , <br />384 $ 169 P <br />COR #68 8 $ 553.00 Owner's job shack phone $ 93 $ 23 B <br />COR #&9 8 $ 116.00 Provide dowels at east stairwell $ 257 $ 114 P <br />COR #70 8 $ 371.00 Provide thickened generator slab $ 1,527 $ 674 P <br />COR #71 8 $ 2,201.00 Provide changes to air intake $ 318) <br />(3 $ - CO <br />COR #72 8 $ (3,318.00) NTE credit on removal of three tanks $ , <br />655 <br />3 $ 1,614 P <br />COR #73 8 $ 5,269.00 Provide changes to column base $ , <br />669 $ 295 P <br />COR #78 8 $ 964.00 Added dowels and shear head $ 284 <br />1 $ 323 B <br />COR # 34 9 $ 1,607.00 Add (4) hot water hose bibs per PR #8 $ , <br />21,735 $ 9,601 P <br />COR # 37 9 $ 31,336.00 Provide sump pit per PR #9 $ (12) $ (5) P <br />COR #75 9 $ (17.00) Provide revisions to electrical drawings per PR #16 $ 738 <br />7 $ 3,419 P <br />COR #76 9 $ 11,157.00 Provide changes to air at rooms per PR #27 $ , <br />580 $ 146 B <br />COR #82 9 $ 726.00 Provide two additional 4" conduit sleeves in Data/Com room per PR # 29 $ 339 $ 339 50/50-CCTV <br />COR #83 9 $ 677.00 Provide two additional 1" conduits with puil cords per PR # 28 $ 162 <br />7 $ 798 <br />1 B <br />COR #84 9 $ 8,960.00 Provide 273 3" conduit sleeves per EC proposal alternate # 32 $ , <br />236 <br />57 $ , <br />25,284 P <br />COR #79 10 $ 82,520.00 Removal and disposal of unsuitable subgrade material <br />' $ , <br />- $ - NC <br />COR # 31 11 $ - s requirements <br />Provide modifications to public works package per City $ 195 <br />3 $ 1,412 P-Streetscape <br />COR # 32 11 $ 4,607.00 Provide access hatch and revisions to plumbing and sprinkler system $ , <br />(14 <br />398) $ (6,361) P <br />COR # 46 11 $ (20,759.00) Delete bentonite waterproofing and reduce slab thickness in same area <br />04 <br />' $ , <br />048 <br />5 $ 2 <br />230 P <br />COR # 49 11 $ 00 <br />7 <br />278 s 199 and 2 <br />Provide insulation at rebar dowels and durometer bearing pad per RFI , , P <br />COR #52 11 $ , <br />. <br />934.00 <br />2 Provide dewatering for undocumented fill areas from 5/21/99 to 6/20/99 $ 2,035 $ 899 B <br />COR #58 11 $ , <br />1,407.00 Provide changes to gas pressure regulators per PR #21 $ 1,125 $ <br />$ 282 <br />- NC <br />COR #77 11 $ - Changes to elevator beams per PR #34 <br />it <br />it <br />i $ - <br />309 78 B <br />COR #89 11 $ 387.00 e v <br />s <br />Provide additional rebar at south slab step (gridline D) per structural engineer s $ $ 855 TO <br />COR #93 11 $ 855.00 Provide reinforcing at arcade slab per RFI 297 $ 233 <br />2 $ 561 B <br />COR #94 11 $ 2,794.00 Provide additional reinforcing and 6" hooks per submittal 2F1 and RFI 328 , <br />855 <br />3 $ 1 <br />703 P <br />COR #95 11 $ 5,558.00 Provide changes to nine columns per RFI 317 $ <br />$ , $ , <br />405 TO <br />COR #96 11 $ 405.00 Provide additional reinforcing for arcade beams per RFI 319 484 <br />1 $ 655 P <br />COR #99 11 $ 139.00 <br />2 Provide slab continuation at bottom of east and west shafts per RFI 236 $ , P <br />COR #102 12 $ , <br />33,688.00 Removal and disposal of unsuitable subgrade material $ 23,366 <br />567 <br />21 $ <br />$ 10,322 <br />- CO <br />COR #88 13 $ 21,567.00 Removal and disposal of contaminated soils-359.45 c.y. $ <br />$ , <br />~89 <br />~ $ 2~3 B <br />COR # 14 14 $ 1,362.00 Provide ductwork and supply fan revisions per PR #1 $ , <br />195 <br />3 $ 1 <br />412 P <br />COR #81 14 $ 4,607.00 Provide concrete ceiling above switch gear and revise CMU walls per RFI 193 , <br />250 $ , <br />436 <br />1 P <br />COR #85 14 $ 686.00 <br />4 Provide additional conduit for swing gate operator per approved submittal 02710-001 $ 3, , P <br />COR #87 14 $ , <br />877.00 Provide short wali reinforcing at parking garage lobby per RFI 160 $ 608 $ 269 B <br />COR #100 14 $ 255.00 Provide changes to exit signs per PR #42 $ <br />$ 204 <br />- $ <br />$ 51 <br />654 TO <br />COR #101 14 $ 654.00 Provide electrical power to the tower clock per RFI 233 $ - $ 294 TO <br />COR #103 14 $ 294.00 Provide changes to bridge connection detail 9/S6.1.1 per RFI 343 329 $ 146 P <br />COR #107 14 $ 475.00 Provide additional PT cables and reinforcing @ grid M/10b <br />i $ <br />$ 749 <br />5 $ 443 <br />1 B <br />COR #110 14 $ 7,192.00 ew <br />Provide additionai reinforcing @ floors 3, 4, 5 per structural shop drawing rev <br />l <br />S $ , <br />092 <br />1 $ , <br />482 P <br />COR #114 14 $ 574.00 <br />1 em <br />a <br />Provide ductile iron for domestic and fire water service in lieu of copper per City of , B <br />COR # 11 15 $ , <br />265.00 Provide door, wall and electrical revisions to second floor per PR #2 $ 212 $ 53 <br />