COR #&1 8 $ 2,107.00 Added rebar on GF1 per shop drawings $
<br />$ 1,461
<br />526 $
<br />$ 646
<br />232 P
<br />P
<br />COR #62 8 $ 758.00 Luminar base at flagpole $ 846
<br />1 $ 464 B
<br />COR #63 8 $ 2,310.00 Stand pipe changes per PR #3 $ ,
<br />32,514 $ 8,164 B
<br />COR #&4 8 $ 40,678.00 Added rebar at pour strips $ (2,497) $ (1,103) P
<br />COR #65 8 $ (3,600.00) Delete 2' sand layer $ - $ 208 TO
<br />COR #66 8 $ 208.00 Added steel bracing at canopy $ 245
<br />9 $ - CO
<br />COR #67 8 $ 9,245.00 Change door frames per PR #31 $ ,
<br />384 $ 169 P
<br />COR #68 8 $ 553.00 Owner's job shack phone $ 93 $ 23 B
<br />COR #&9 8 $ 116.00 Provide dowels at east stairwell $ 257 $ 114 P
<br />COR #70 8 $ 371.00 Provide thickened generator slab $ 1,527 $ 674 P
<br />COR #71 8 $ 2,201.00 Provide changes to air intake $ 318)
<br />(3 $ - CO
<br />COR #72 8 $ (3,318.00) NTE credit on removal of three tanks $ ,
<br />655
<br />3 $ 1,614 P
<br />COR #73 8 $ 5,269.00 Provide changes to column base $ ,
<br />669 $ 295 P
<br />COR #78 8 $ 964.00 Added dowels and shear head $ 284
<br />1 $ 323 B
<br />COR # 34 9 $ 1,607.00 Add (4) hot water hose bibs per PR #8 $ ,
<br />21,735 $ 9,601 P
<br />COR # 37 9 $ 31,336.00 Provide sump pit per PR #9 $ (12) $ (5) P
<br />COR #75 9 $ (17.00) Provide revisions to electrical drawings per PR #16 $ 738
<br />7 $ 3,419 P
<br />COR #76 9 $ 11,157.00 Provide changes to air at rooms per PR #27 $ ,
<br />580 $ 146 B
<br />COR #82 9 $ 726.00 Provide two additional 4" conduit sleeves in Data/Com room per PR # 29 $ 339 $ 339 50/50-CCTV
<br />COR #83 9 $ 677.00 Provide two additional 1" conduits with puil cords per PR # 28 $ 162
<br />7 $ 798
<br />1 B
<br />COR #84 9 $ 8,960.00 Provide 273 3" conduit sleeves per EC proposal alternate # 32 $ ,
<br />236
<br />57 $ ,
<br />25,284 P
<br />COR #79 10 $ 82,520.00 Removal and disposal of unsuitable subgrade material
<br />' $ ,
<br />- $ - NC
<br />COR # 31 11 $ - s requirements
<br />Provide modifications to public works package per City $ 195
<br />3 $ 1,412 P-Streetscape
<br />COR # 32 11 $ 4,607.00 Provide access hatch and revisions to plumbing and sprinkler system $ ,
<br />(14
<br />398) $ (6,361) P
<br />COR # 46 11 $ (20,759.00) Delete bentonite waterproofing and reduce slab thickness in same area
<br />04
<br />' $ ,
<br />048
<br />5 $ 2
<br />230 P
<br />COR # 49 11 $ 00
<br />7
<br />278 s 199 and 2
<br />Provide insulation at rebar dowels and durometer bearing pad per RFI , , P
<br />COR #52 11 $ ,
<br />.
<br />934.00
<br />2 Provide dewatering for undocumented fill areas from 5/21/99 to 6/20/99 $ 2,035 $ 899 B
<br />COR #58 11 $ ,
<br />1,407.00 Provide changes to gas pressure regulators per PR #21 $ 1,125 $
<br />$ 282
<br />- NC
<br />COR #77 11 $ - Changes to elevator beams per PR #34
<br />it
<br />it
<br />i $ -
<br />309 78 B
<br />COR #89 11 $ 387.00 e v
<br />s
<br />Provide additional rebar at south slab step (gridline D) per structural engineer s $ $ 855 TO
<br />COR #93 11 $ 855.00 Provide reinforcing at arcade slab per RFI 297 $ 233
<br />2 $ 561 B
<br />COR #94 11 $ 2,794.00 Provide additional reinforcing and 6" hooks per submittal 2F1 and RFI 328 ,
<br />855
<br />3 $ 1
<br />703 P
<br />COR #95 11 $ 5,558.00 Provide changes to nine columns per RFI 317 $
<br />$ , $ ,
<br />405 TO
<br />COR #96 11 $ 405.00 Provide additional reinforcing for arcade beams per RFI 319 484
<br />1 $ 655 P
<br />COR #99 11 $ 139.00
<br />2 Provide slab continuation at bottom of east and west shafts per RFI 236 $ , P
<br />COR #102 12 $ ,
<br />33,688.00 Removal and disposal of unsuitable subgrade material $ 23,366
<br />567
<br />21 $
<br />$ 10,322
<br />- CO
<br />COR #88 13 $ 21,567.00 Removal and disposal of contaminated soils-359.45 c.y. $
<br />$ ,
<br />~89
<br />~ $ 2~3 B
<br />COR # 14 14 $ 1,362.00 Provide ductwork and supply fan revisions per PR #1 $ ,
<br />195
<br />3 $ 1
<br />412 P
<br />COR #81 14 $ 4,607.00 Provide concrete ceiling above switch gear and revise CMU walls per RFI 193 ,
<br />250 $ ,
<br />436
<br />1 P
<br />COR #85 14 $ 686.00
<br />4 Provide additional conduit for swing gate operator per approved submittal 02710-001 $ 3, , P
<br />COR #87 14 $ ,
<br />877.00 Provide short wali reinforcing at parking garage lobby per RFI 160 $ 608 $ 269 B
<br />COR #100 14 $ 255.00 Provide changes to exit signs per PR #42 $
<br />$ 204
<br />- $
<br />$ 51
<br />654 TO
<br />COR #101 14 $ 654.00 Provide electrical power to the tower clock per RFI 233 $ - $ 294 TO
<br />COR #103 14 $ 294.00 Provide changes to bridge connection detail 9/S6.1.1 per RFI 343 329 $ 146 P
<br />COR #107 14 $ 475.00 Provide additional PT cables and reinforcing @ grid M/10b
<br />i $
<br />$ 749
<br />5 $ 443
<br />1 B
<br />COR #110 14 $ 7,192.00 ew
<br />Provide additionai reinforcing @ floors 3, 4, 5 per structural shop drawing rev
<br />l
<br />S $ ,
<br />092
<br />1 $ ,
<br />482 P
<br />COR #114 14 $ 574.00
<br />1 em
<br />a
<br />Provide ductile iron for domestic and fire water service in lieu of copper per City of , B
<br />COR # 11 15 $ ,
<br />265.00 Provide door, wall and electrical revisions to second floor per PR #2 $ 212 $ 53
<br />
|