Laserfiche WebLink
' ~i~2ioo Courthouse Square <br />--- Approved COR / CO Log <br /> COUNTY TRANSIT <br /> APPROVED <br />DESCRIPTION OF CHANGE ALLOCATION ALLOCATION Notes <br />COR <br />COR # 1 CO AMOUNT <br />1 $ 2,530.00 Decomission, removal and disposal of UST encountered on 3-15-99 $ <br />$ 2,530 <br />~ 224 $ <br />$ - <br />541 CO <br />P-Streetscape <br />COR # 2 1 $ 1,765.00 Resolve gas line conflicts during sewer line relocation $ ~ 2 2~ 5 $ _ CO <br />COR # 4 1 $ 12,215.00 Removal and disposal of contaminated soils-203.9 c.y. <br />$ 4 982 $ _ CO <br />COR # 5 1 $ 4,982.00 Decomission, removal and disposal of UST encountered along s. blockface 2 393 $ 1,057 P <br />COR # 6 1 $ 3,450.00 Increase compressive strength of footing pads from 3,000 to 5,000 psi $ 112 <br />16 $ - CO <br />COR # 9 2 $ 16,112.00 Removal and disposal of contaminated soils-268.54 c.y. $ , <br />475 $ 210 P <br />COR # 12 2 $ 685.00 Demolition of water vault along Court street $ 41,470 $ - CO <br />COR # 17 2 $ 41,470.00 Removal and disposal of contaminated soils <br />rade/fill in areas of unsuitabie or contaminated soils <br />b <br />s <br />bl <br />it <br />; <br />$ <br />129 <br />697 <br />$ <br />55,579 <br />ed P <br />Mo Cfi <br />COR # 20 3 $ g <br />u <br />e <br />a <br />Excavation of unsu <br />214,993.00 ; O <br />COR # 21 4 $ 27,697.00 Removal and disposal of contaminated soils-461.62 c.y. 14 <br />135 $ - CO-Streetscape <br />COR # 3 5 $ 14,135.00 Excavate, remove and dispose of three tanks in the NW corner of the site $ , <br />4 832 $ 2,~ 34 P <br />COR # 7 5 $ 6,966.00 Additional dewatering costs due to overexcavation $ 938 $ 938 50/50 <br />COR # 8 5 $ 1,876.00 Owner's share of partnering session <br />at exterior masonry wails of rooms 1209, 1219 and 1239 <br />ti <br />l <br />l i <br />$ 967 g 427 P <br />COR # 10 5 $ on <br />a <br />nsu <br />1,394.00 Provide cavity wal (560) $ (140) B <br />COR # 13 5 $ (700.00) Delete sump pump at elevator #1 <br />w "E" coating on #3 surface of bus mall glass canopy system <br />l <br />l <br />t <br />D <br />$ 12 986~ <br />( $ (5 ~3~~ p <br />COR # 18 5 $ <br />5 $ o <br />e <br />e <br />e <br />(18,723.00) VE proposal #1- <br />00) VE proposal #1-Replace 1600 amp bus duct with conduit and wire for feed to rooftop equip. <br />744 <br />(1 $ (1,394) $ (350) <br />591 <br />1 B <br />P <br />COR # 19 5 $ . <br />, <br />00 Provide couplers at top of parking level columns for future north pad development <br />193 <br />5 $ 3,602 <br />52 $ <br />$ , <br />(88) B <br />COR # 22 . <br />, (3 <br />) <br />COR # 23 5 $ (440.00) Delete PT tendon locators $ ggg $ 304 P <br />COR # 26 5 $ 993.00 Revise column ties after fabrication $ g~g ~ 165 P <br />COR # 27 5 $ 538.00 Provide column tail revisions g 6,613 $ 2,92~ P <br />COR # 29 5 $ 9,534.00 Revise column reinforcement detail $ ~ 925 ~ 850 P <br />COR # 30 5 $ 2,775.00 Provide added rebar at isolation joints $ ~864~ $ ~217~ g <br />COR # 33 5 $ (1,081.00) Delete link seal and ESP-1 <br />o to roof level at grids O/11 and 0/12 <br />olumns to <br />i <br />R $ q,21g g 1,861 B <br />P <br />COR # 35 5 $ g <br />se c <br />ev <br />6,074.00 $ (2,036) $ (51 ~) <br />COR # 36 5 $ (2,547.00) Revise column type at grid J-10a $ 548 $ 242 P <br />COR # 38 5 $ 790.00 Provide reinforcing at SOG beneath columns $ ~ 424 $ 62g P <br />COR # 39 5 $ <br />5 $ 2,053.00 Provide added footing and column <br />00) VE proposal #3-Revise precast panels to mitered corners instead of "U" shape <br />962 <br />(8 <br />$ 6,216 <br />~ ~ <br />$ 2,746 <br />~_~ P <br />NC <br />COR # 42 . <br />, <br />COR # 44 5 $ - Provide flourescent lamp revisions $ _ $ _ NC <br />COR # 45 5 $ - Provide hollow metal frame revisions $ 668 $ 295 p <br />COR # 47 5 $ 963.00 Provide floor hardener at rooms 1209, 1219, and 1239 <br />$ 73 $ 32 P <br />COR # 48 5 $ 105.00 Change wall mounted water closet to floor mounted water closet in room 1224 <br />$ <br />315 <br />$ _ CO-Streetscape <br />COR #50 5 $ 315.00 Remove and dispose of UST adjacent to Church Street $ 2,210 $ 976 P <br />COR #53 5 $ 3,186.00 Revise foundation drain pipe specification $ 839 $ 371 P <br />COR #54 5 $ 1,210.00 Provide added rebar for pifaster at the SW air shaft $ ~58~ $ ~25~ P <br />COR #56 5 $ <br />6 $ (83.00) Provide changes to glazing <br />00 Provide six parallel parking stalls w/ covered walkway -relocate future job trailers to Church <br />437 <br />32 <br />$ <br />88g <br />22 <br />Mod f ed P <br />COR # 28 7 $ . <br />, <br />00 '" Excavation of unsuitable subgrade/fill in areas of unsuitable or contaminated soils <br />846 <br />90 $ 67,965 <br />671 $ <br />$ , <br />621 <br />1 • <br />P <br />COR #51 . <br />, 3, , <br />COR # 24 8 $ <br />8 $ 5,292.00 Slab transition revisions <br />00 Upgrade windows to Sungate 1000 at three building faces <br />550 <br />23 $ ~ g 824 c~ 4,726 <br />785 B <br />50/50 <br />COR #55 <br />COR #57 8 $ . <br />, <br />1,569.00 Change column in hearing room $ <br />g 785 <br />569 $ <br />$ 252 P <br />COR #59 8 $ 821.00 Added column ties <br />