' ~i~2ioo Courthouse Square
<br />--- Approved COR / CO Log
<br /> COUNTY TRANSIT
<br /> APPROVED
<br />DESCRIPTION OF CHANGE ALLOCATION ALLOCATION Notes
<br />COR
<br />COR # 1 CO AMOUNT
<br />1 $ 2,530.00 Decomission, removal and disposal of UST encountered on 3-15-99 $
<br />$ 2,530
<br />~ 224 $
<br />$ -
<br />541 CO
<br />P-Streetscape
<br />COR # 2 1 $ 1,765.00 Resolve gas line conflicts during sewer line relocation $ ~ 2 2~ 5 $ _ CO
<br />COR # 4 1 $ 12,215.00 Removal and disposal of contaminated soils-203.9 c.y.
<br />$ 4 982 $ _ CO
<br />COR # 5 1 $ 4,982.00 Decomission, removal and disposal of UST encountered along s. blockface 2 393 $ 1,057 P
<br />COR # 6 1 $ 3,450.00 Increase compressive strength of footing pads from 3,000 to 5,000 psi $ 112
<br />16 $ - CO
<br />COR # 9 2 $ 16,112.00 Removal and disposal of contaminated soils-268.54 c.y. $ ,
<br />475 $ 210 P
<br />COR # 12 2 $ 685.00 Demolition of water vault along Court street $ 41,470 $ - CO
<br />COR # 17 2 $ 41,470.00 Removal and disposal of contaminated soils
<br />rade/fill in areas of unsuitabie or contaminated soils
<br />b
<br />s
<br />bl
<br />it
<br />;
<br />$
<br />129
<br />697
<br />$
<br />55,579
<br />ed P
<br />Mo Cfi
<br />COR # 20 3 $ g
<br />u
<br />e
<br />a
<br />Excavation of unsu
<br />214,993.00 ; O
<br />COR # 21 4 $ 27,697.00 Removal and disposal of contaminated soils-461.62 c.y. 14
<br />135 $ - CO-Streetscape
<br />COR # 3 5 $ 14,135.00 Excavate, remove and dispose of three tanks in the NW corner of the site $ ,
<br />4 832 $ 2,~ 34 P
<br />COR # 7 5 $ 6,966.00 Additional dewatering costs due to overexcavation $ 938 $ 938 50/50
<br />COR # 8 5 $ 1,876.00 Owner's share of partnering session
<br />at exterior masonry wails of rooms 1209, 1219 and 1239
<br />ti
<br />l
<br />l i
<br />$ 967 g 427 P
<br />COR # 10 5 $ on
<br />a
<br />nsu
<br />1,394.00 Provide cavity wal (560) $ (140) B
<br />COR # 13 5 $ (700.00) Delete sump pump at elevator #1
<br />w "E" coating on #3 surface of bus mall glass canopy system
<br />l
<br />l
<br />t
<br />D
<br />$ 12 986~
<br />( $ (5 ~3~~ p
<br />COR # 18 5 $
<br />5 $ o
<br />e
<br />e
<br />e
<br />(18,723.00) VE proposal #1-
<br />00) VE proposal #1-Replace 1600 amp bus duct with conduit and wire for feed to rooftop equip.
<br />744
<br />(1 $ (1,394) $ (350)
<br />591
<br />1 B
<br />P
<br />COR # 19 5 $ .
<br />,
<br />00 Provide couplers at top of parking level columns for future north pad development
<br />193
<br />5 $ 3,602
<br />52 $
<br />$ ,
<br />(88) B
<br />COR # 22 .
<br />, (3
<br />)
<br />COR # 23 5 $ (440.00) Delete PT tendon locators $ ggg $ 304 P
<br />COR # 26 5 $ 993.00 Revise column ties after fabrication $ g~g ~ 165 P
<br />COR # 27 5 $ 538.00 Provide column tail revisions g 6,613 $ 2,92~ P
<br />COR # 29 5 $ 9,534.00 Revise column reinforcement detail $ ~ 925 ~ 850 P
<br />COR # 30 5 $ 2,775.00 Provide added rebar at isolation joints $ ~864~ $ ~217~ g
<br />COR # 33 5 $ (1,081.00) Delete link seal and ESP-1
<br />o to roof level at grids O/11 and 0/12
<br />olumns to
<br />i
<br />R $ q,21g g 1,861 B
<br />P
<br />COR # 35 5 $ g
<br />se c
<br />ev
<br />6,074.00 $ (2,036) $ (51 ~)
<br />COR # 36 5 $ (2,547.00) Revise column type at grid J-10a $ 548 $ 242 P
<br />COR # 38 5 $ 790.00 Provide reinforcing at SOG beneath columns $ ~ 424 $ 62g P
<br />COR # 39 5 $
<br />5 $ 2,053.00 Provide added footing and column
<br />00) VE proposal #3-Revise precast panels to mitered corners instead of "U" shape
<br />962
<br />(8
<br />$ 6,216
<br />~ ~
<br />$ 2,746
<br />~_~ P
<br />NC
<br />COR # 42 .
<br />,
<br />COR # 44 5 $ - Provide flourescent lamp revisions $ _ $ _ NC
<br />COR # 45 5 $ - Provide hollow metal frame revisions $ 668 $ 295 p
<br />COR # 47 5 $ 963.00 Provide floor hardener at rooms 1209, 1219, and 1239
<br />$ 73 $ 32 P
<br />COR # 48 5 $ 105.00 Change wall mounted water closet to floor mounted water closet in room 1224
<br />$
<br />315
<br />$ _ CO-Streetscape
<br />COR #50 5 $ 315.00 Remove and dispose of UST adjacent to Church Street $ 2,210 $ 976 P
<br />COR #53 5 $ 3,186.00 Revise foundation drain pipe specification $ 839 $ 371 P
<br />COR #54 5 $ 1,210.00 Provide added rebar for pifaster at the SW air shaft $ ~58~ $ ~25~ P
<br />COR #56 5 $
<br />6 $ (83.00) Provide changes to glazing
<br />00 Provide six parallel parking stalls w/ covered walkway -relocate future job trailers to Church
<br />437
<br />32
<br />$
<br />88g
<br />22
<br />Mod f ed P
<br />COR # 28 7 $ .
<br />,
<br />00 '" Excavation of unsuitable subgrade/fill in areas of unsuitable or contaminated soils
<br />846
<br />90 $ 67,965
<br />671 $
<br />$ ,
<br />621
<br />1 •
<br />P
<br />COR #51 .
<br />, 3, ,
<br />COR # 24 8 $
<br />8 $ 5,292.00 Slab transition revisions
<br />00 Upgrade windows to Sungate 1000 at three building faces
<br />550
<br />23 $ ~ g 824 c~ 4,726
<br />785 B
<br />50/50
<br />COR #55
<br />COR #57 8 $ .
<br />,
<br />1,569.00 Change column in hearing room $
<br />g 785
<br />569 $
<br />$ 252 P
<br />COR #59 8 $ 821.00 Added column ties