Laserfiche WebLink
Marsh 3, 199a <br />SIT~ NU~4B~R~ <br /> <br />F~VIN HILLS <br />94-823. LOT 2, BLK 2, HAKEY C~EK ADDITION <br /> <br /> YoU= site has been found suitable for a STANDARD ON-SITE SEWAGE DISPOSAL <br />SYSTEM. The following construction specificatloas shall apply to the installa- <br />tion of your septic system. <br /> <br />The septic tank shall have a minimum liquid capacity of ~ <br />gallons. <br /> <br />The projected daily sewage flow for this project is ¢alculated at <br />4~0 9allo~ per day. Sased on soil condition~ observed on this <br />si~e, the disposal field will be sized at 7S 1~1 feet pe~ 150 <br />~ of projected daily sewage flow, A minimum Of 225 <br />fee~ ef disposal field will be required fo= your p~eposed develop~ <br />me~t. The disposal trenches are constructed two (2) feet wide and <br />on minimum =es (10) foot centers and wi~h no line exceeding 1~5 <br />feet in length. The trenches and perforat~ pipe ar~ in=tailed <br />letS1 (il") and contoured to follow the natural ground surface. <br /> <br />The disposal field shall be constructed with serial distribution <br />with a minimum trench depth of 24 inches and a ma×imu~ trenoh <br />depth Df ~. There m~St be at least l~,,,.,tsohes of backfill <br />over the top of the gravel, measured from the natural ground <br />aurface. <br /> <br /> This a~oval is site sl~ecifie to the area tested and the septic system <br />must be located in the immediate area of the test pits unless etherwlse autho- <br />rized by this office. A new site evaluation may be required if the ~y~tem is <br />proposed f~r a different area on th~ property. <br /> <br />SP~0IAL CONDITIONS= <br /> The initial standard drainfield must be installed as far upstop~ as <br /> possible to allow space for the replacement sand £ilte~ drainfield to <br /> meet the twenty-five feet minimum setback from the downslolt~ cutbanks <br /> and ditches. A pre-construstlon field stakeout is recommended to <br /> establish the locations and elevations of the individual drainfield <br /> line~ fo~ both systems. Refer to the enclosed stakeout procedure and the <br /> setback li~t for details to Templets the stakeout. Avoid old roadways <br /> and excavations where the topsoil has been altered by grading and <br /> compaction. <br /> <br />VALID PEI~ZT ~S e~ ISSUED BY ~IS OFFZ~. <br /> <br /> <br />