Laserfiche WebLink
determine if it is in compliance with current County standards. If an exemption <br />is denied, the applicant will be required to apply for a driveway permit and <br />make necessary changes to establish a compliant access. There does exist <br />vegetation along the right-of-way of Oak Dive SE that is a vision obstruction. <br />This vegetation will need to be addressed as part of the driveway permit <br />process. <br /> <br />Any utility work in the right-of-way will require a utility permit from public <br />works. <br /> <br />Prior to plat approval, the applicant shall submit a site drainage plan that <br />includes existing contours and how the applicant proposes to discharge roof <br />runoff from the site. Construction of improvements on the property shall not <br />block historical or naturally occurring nmoff from adjacent properties. Site <br />grading shall not impact surrounding properties in a negative manner." <br /> <br />A member of Area Advisory Committee #1 submitted a lengthy letter in opposition to the <br />proposal. She is concerned with increasing the density of the subdivision and problems with <br />groundwater supply in the subdivision. She indicates that although the applicant submitted a <br />Hydrogeology Review that satisfies the requirements of the Marion County Rural Zoning <br />Ordinance (MCRZO) this application should either be denied, or delayed, pending a full <br />hydrogeology study. <br /> <br />Marion County Building Inspection Division indicates that the applicant must obtain all <br />necessary permits from their office. In addition they indicate that a Site Evaluation approval is <br />required on each of the proposed parcels. <br /> <br />All other contacted agencies either failed to respond, or stated no objection to the proposal, at <br />the time this report was written. <br /> <br />Chapter 181 of the Marion County Zoning Ordinance established provisions for partitioning <br />property in an SGO zone. In the SGO-5 zone the threshold parcel size is five acres. In <br />accordance with the Ordinance a water use inventory was conducted for this proposal which <br />revealed that a further study was required. Subsequently, Nicholas Coffey, a Registered <br />Professional Geologist, conducted a Hydrogeology Review of the property. The review <br />concluded that there is sufficient groundwater to support the proposed development. A peer <br />review conducted by Newton Consultants, Incorporated, concluded that the Hydrogeology <br />Review met the requirements outlined in Chapter 181. Based on this information the applicant <br />satisfied the requirements of the MCRZO and no further study is required. <br /> <br />Although no additional study is necessary, the County requires a Declaratory Statement be <br />recorded with the property deed. This notifies the applicant, and subsequent owners, that there <br />may be long term groundwater supply problems and that the County is not responsible for <br />deepening or replacing wells. <br /> <br />Marion County Comprehensive Plan policies for rural residential areas provide that homesites <br />should be 1.5 acres to 3.0 acres in size. In addition, the AR zone contains a minimum lot size <br />of 1.5 acres. On October 4, 2000 the Oregon Department of Land Conservation and <br />Development adopted new rules setting a 2.0 acre minimum lot size for rural residential lands. <br /> <br /> <br />