My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12293642
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
23-XXXXXX
>
12293642
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2024 2:30:37 PM
Creation date
7/30/2024 2:34:17 PM
Metadata
Fields
Template:
Permits
Permit Address
5575 FRUITLAND RD NE
Permit City
Salem
Permit Number
555-23-005626-PRMT
Parcel Number
072W21CC03300
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> Workmanship <br /> The Universal Flow Inducer and Flow Inducer Tower shall be installed in accordance with the <br /> approved plans and the manufacturer's instructions.Placement, assembly, and installation shall be <br /> conducted to facilitate easy operation,maintenance,repair,removal and replacement.Drawings of <br /> any approved "as built" changes shall be provided to the Inspector by the Installer. <br /> 5.6 AdvanTex (AX20) Secondary Treatment Pod <br /> Materials <br /> The AdvanTex textile filter is a pre-engineered package that requires careful installation by <br /> authorized contractors in accordance with the manufacturer's instructions. Since the AdvanTex <br /> textile filter is an integral part of this design,no substitutions will be allowed. <br /> Workmanship <br /> The AdvanTex textile filters shall be installed in accordance with the manufacturer's instructions. <br /> Excess soil from the tank excavations will be used to backfill around the AX20 pods for both <br /> support and insulation. <br /> 5.7 Pumps, Controls, and Alarms <br /> Materials <br /> High head effluent pumps will be installed in the primary dosing septic tank,recirculation tank and <br /> drainfield dosing tank. The control and primary alarm panels shall be manufactured to the functional <br /> specifications shown in the plans.If the manufacturer has changed the specifications,the Designer <br /> must be notified in writing. Since the recirculation and drainfield dosing tank's panel is a custom <br /> control panel (as specified) and is an integral part of the design,no substitutions will be allowed. <br /> The Installer shall verify the custom panel quote number with the Designer prior to submitting an <br /> order with the Manufacturer. <br /> Workmanship <br /> The power supply for the consolidated control panel will need to be a minimum 40A,240V,single- <br /> phase circuit(L 1,L2,N, G)for the pumps, controls and panel heater.A subpanel/breaker box may <br /> need to be mounted adjacent to the control panel to provide a means of disconnect.The Installer <br /> will need to coordinate with the facility to identify the power supply for the panel.The pump and <br /> control systems and related appurtenances shall be installed in accordance with the manufacturer's <br /> instructions,the approved plans, and all appropriate electrical codes.Placement, assembly, and <br /> installation shall be conducted to facilitate easy operation,maintenance,repair,removal and <br /> replacement.All components shall be clearly marked in a permanent and professional manner, <br /> consistent with the design,to facilitate identification,monitoring,and troubleshooting. The Installer <br /> shall retain a licensed electrician to extend the power supply to the control panel and will be <br /> responsible for obtaining the necessary electrical permits and inspections. Copies of all permits, <br /> inspection reports,panel diagrams, and drawings of any approved"as built" changes shall be <br /> provided to the Inspector by the Installer. <br /> Valley—Albany,OR East Salem Seventh-Day Adventist Church I P&S <br /> Doc:2023240054 East Salem Church PS.docx November 2023 I Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.