My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12293642
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
23-XXXXXX
>
12293642
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2024 2:30:37 PM
Creation date
7/30/2024 2:34:17 PM
Metadata
Fields
Template:
Permits
Permit Address
5575 FRUITLAND RD NE
Permit City
Salem
Permit Number
555-23-005626-PRMT
Parcel Number
072W21CC03300
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
backfilled prior to completing the water tightness test. One-piece tanks shall be backfilled to 6 <br /> inches below the exterior tank top to allow construction of forms for a bentonite seal. <br /> All risers shall be appropriately oriented, consistent with logical positioning of plumbing and <br /> electrical penetrations,and attached to the tank top. The inlet(s)and outlet(s) shall be plugged and <br /> the tank filled with water.Pre-soaking concrete tanks for 24 hours is advised.The water level shall <br /> be 2 inches deep in the riser(above the exterior tank top) at the beginning of the water tightness test. <br /> CAUTION: Filling of the tank(s)shall be monitored closely to assure that no more than <br /> 2 inches of water is allowed to accumulate above the tank top.Pressure beyond this specification <br /> may compromise tank integrity and may require tank replacement at no cost to the Owner.No more <br /> than one gallon shall exfiltrate in a 24-hour period. <br /> Field repairs may be attempted once for observed sources of minor leakage.If the tank cannot be <br /> made watertight,then it shall be replaced at no expense to the Owner.Upon passing the water <br /> tightness test,backfilling shall be completed as described in the approved plans.Final grading of the <br /> finished surface shall assure that water does not accumulate around the risers or manhole covers. <br /> Each tank located adjacent to roadways or parking areas shall be protected from vehicular traffic by <br /> an adequate barrier(either locally available boulders or steel bollards filled with concrete and <br /> painted bright yellow).Excess soil from the excavations shall be managed on Site at a location <br /> designated by the Owner.Drawings of any approved "as built" changes noting pertinent <br /> dimensions,reference points, and elevations shall be provided to the Inspector by the Installer. <br /> 5.4 Effluent Filter <br /> Materials <br /> The effluent filter shall be manufactured to the functional specifications shown in the plans.If the <br /> manufacturer cannot meet the specifications shown,the Designer shall be notified in writing. Since <br /> the effluent filter assembly(as specified) is an integral part of the design,no substitutions will be <br /> allowed. <br /> Workmanship <br /> The effluent filter shall be installed in accordance with the approved plans and the manufacturer's <br /> instructions.Placement, assembly, and installation shall be conducted to facilitate easy operation, <br /> maintenance,repair,removal, and replacement.Drawings of any approved "as built" changes shall <br /> be provided to the Inspector by the Installer. <br /> 5.5 Universal Flow Inducer and Flow Inducer Tower <br /> Materials <br /> The Universal Flow Inducer and Flow Inducer Tower shall be manufactured to the functional <br /> specifications shown in the plans.If the manufacturer cannot meet the specifications shown,the <br /> Designer shall be notified in writing. Since these components (as specified) are an integral part of <br /> the design,no substitutions will be allowed. <br /> Valley—Albany,OR East Salem Seventh-Day Adventist Church I P&S <br /> Doc:2023240054 East Salem Church PS.docx November 2023 I Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.