Where gravityeffluent sewers or pressure effluent sewers cross a water line,the orien <br /> tation shall be <br /> perpendicular to the water line,unless otherwise approved by the Engineer.All piping materials <br /> (water and sewer) shall be solvent welded Schedule 40 (watertight)or heat-fused HDPE.The <br /> minimum vertical separation between water and sewer at crossings is 18 inches. The minimum <br /> horizontal distance between parallel water and sewer pipes is 10 feet pipe-to-pipe. When the <br /> separation cannot be met or the sewer must cross above the potable pipeline,a 20-foot length of <br /> pipe for each(water and sewer) shall be centered(where possible) at the crossing point to maximize <br /> the distance between joints.The sewer line shall be located below the water line unless specifically <br /> approved by the Engineer.In all cases,piping within 10 feet of the crossing point shall be bedded in <br /> compacted sand for uniform support.The piping shall be installed and bedded to prevent direct <br /> contact(minimum 6-inch vertical separation). <br /> Special connectors, adapters,primers, glues, or solvents may be required where the material, size, or <br /> construction of the pipe changes within the system.Drawings of any approved"as built" changes or <br /> conditions noting pertinent dimensions,pipe types, distances,and grades shall be provided to the <br /> Engineer by the Installer. <br /> 5.3 Tanks <br /> Materials <br /> All pre-cast concrete tanks shall be constructed to the manufacturer's standard specifications with <br /> the custom modifications shown in the plans.If the custom modifications conflict with the <br /> manufacturer's standard specifications,the Designer must be notified immediately in writing. Since <br /> the tanks (as specified)are an integral part of the design,no substitutions will be allowed. <br /> Workmanship <br /> The Site shall be adequately prepared by the Installer for placement of the tanks by the tank <br /> manufacturer.All tanks shall be set on a level, stable base to minimize the potential for differential <br /> settling.Any water encountered within the excavation shall be pumped and distributed away from <br /> the area to a location that will not impact other construction activities(e.g.,the drainfields) or water <br /> quality. The excavation shall be sufficiently dewatered to enable placement of the tank bedding <br /> material to the grades specified,as well as to enable the placement of the tank(s)themselves.Where <br /> 2-piece tanks are set,the excavation shall be prepared to provide a minimum clearance of 6-inches <br /> on all 4 sides of the tank(or as specified by the tank manufacturer)to facilitate visual inspection for <br /> leaks and installation of an exterior bentonite seal.All sealing, grouting, and coating shall be <br /> completed prior to backfilling. <br /> After placement and sealing, all tanks shall be tested in the field for water tightness.Two-piece <br /> tanks shall be backfilled to a point 3 inches below the field seam and the tank filled with water to no <br /> more than 6 inches above the seam to check for obvious leaks. Where pipe penetrations are located <br /> below the seam,pre-testing for obvious leaks is advised. CAUTION: Filling of the tank(s)shall <br /> be monitored closely to assure that no more than 6 inches is allowed to accumulate above the <br /> seam. Construct a form with 1-inch x 6-inch lumber to provide for placement of bentonite along the <br /> seam around the outside of the tank.It is recommended that bentonite be placed around each pipe <br /> penetration to provide secondary protection against leakage.The remaining tank sidewall shall be <br /> Valley—Albany,OR East Salem Seventh-Day Adventist Church I P&S <br /> Doc:2023240054 East Salem Church PS.docx November 2023 I Page 5 <br />