place.Any measurable settling,and any damage caused by said settling,that occurs within one year <br /> after construction is completed, shall be repaired promptly by the Installer at no cost to the Owner. <br /> 5.2 Piping and Plumbing <br /> Materials <br /> The following materials, or equivalent,are approved for the purposes of this project: <br /> • Building Sewer(Drainage System)Pipe and Fittings-Type plastic sewer main(PSM) <br /> (PVC),ASTM D-3034 or Schedule 40 PVC or acrylonitrile-butadiene-styrene (ABS) drain, <br /> waste and vent(DWV), as specified on the plans. <br /> • Effluent Sewer Pipe and Fittings-Either type ASTM D-3034, Schedule 40 or PSM PVC <br /> or ABS DWV,as specified on the plans. <br /> • Pressure Pipe and Fittings-Either Schedule 40 or Class 200 PVC 1120 (ASTM D-2241) <br /> or High Density Polyethylene(HDPE) SDR 11,as specified on the plans. <br /> Workmanship <br /> All building sewers, effluent sewers, and force mains shall be placed on a uniformly graded, stable <br /> base of either undisturbed soil, selected soil backfill, or other specified granular material.Each pipe <br /> shall be uniformly supported along its entire length to control settling and stresses during and <br /> following backfill.Unless authorized by the Engineer,thrust blocks shall be installed anywhere a <br /> force main makes a bend greater than 45 degrees.Pipe markings shall be oriented at 12 o'clock to <br /> allow ready inspection after installation,prior to backfill.All gravity building sewers, gravity <br /> effluent sewers,pressure effluent sewers,and manifold piping to each lateral shall be marked with <br /> tracer wire for future reference. <br /> The building sewer shall be laid at a uniform grade no less than 1/8 of an inch fall per foot of run, <br /> unless specified otherwise elsewhere in these plans and specifications, and shall be watertight. The <br /> Installer shall be responsible for obtaining plumbing permits and inspections from the appropriate <br /> local building department, as necessary. Gravity effluent sewers shall be laid at a uniform grade no <br /> less than 4 inches per 100 feet unless specifically called out on the drawings.A minimum of 12 <br /> inches of cover shall be provided over horizontal gravity piping after backfill (settled) in areas not <br /> subject to vehicular traffic.A minimum of 30 inches of cover shall be provided over horizontal <br /> pressure piping after backfill(settled) and in areas subject to traffic,unless sleeved in protective <br /> steel or other approved protection.In such cases, all bedding and backfill shall be 3/4-inch minus <br /> crushed rock.An air release/vacuum breaker must be installed at each high point along the force <br /> main if it cannot be laid at a continuous level to uphill grade.Backfill within trenches under asphalt <br /> shall be compacted prior to repaving to prevent subsequent settling. <br /> All gravity and pressure effluent piping shall be watertight. Gravity effluent sewer piping shall be <br /> tested with a minimum of 15 feet of static water pressure.The test will be considered acceptable if <br /> no measurable loss occurs in a 15-minute period(defined as 0.16 gallons per hour,per inch <br /> diameter,per 100 feet).Pressure effluent piping(force mains) shall be tested with water.A <br /> hydrostatic pressure equal to the dead headed pressure of the effluent pumps shall be measured with <br /> a gauge and maintained for 10 minutes with no measurable loss.All testing shall be conducted by <br /> the Installer and verified by the Engineer. <br /> Valley—Albany,OR East Salem Seventh-Day Adventist Church I P&S <br /> Doc:2023240054 East Salem Church PS.docx November 2023 I Page 4 <br />