My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CU25-038 Staff Decision
Images9
>
Public Works - Planning
>
FOR PUBLIC VIEW ON INTERNET
>
2025
>
Conditional Use
>
CU25-038 Staff Decision
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2025 12:35:37 PM
Creation date
9/19/2025 12:35:52 PM
Metadata
Fields
Template:
Land Use
Case_Number
25-038
Document_Date
9/19/2025
Land Use Type
Conditional Use
Tax_Lot_Number
072W18CA07000
Document_Type
Decision
Site_Address
0 NE PHIPPS LN
Additional Info
072W18CA07100
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Attention Property Owner: A land use proposal has been submitted for property near where you live or near property you own elsewhere. <br />State law requires that the county notify property owners within a certain distance from this property. The proposal and address of the <br />property is described in the "Application" section below. The decision in this case does not directly affect the zoning or use of your <br />property. If you object to the decision, refer to the "Appeal" section. If you have questions, contact the staff person listed at the end of <br />this report. <br /> <br />NOTICE OF DECISION <br />CONDITIONAL USE CASE NO. 25-038 <br /> <br />APPLICATION: Application of Sunstone Water LLC for a conditional use permit for the expansion of a water treatment <br />facility in an RS (Single-Family Residential) zone located in the 2700 block on Phipps Ln NE, Salem (T7S; R2W; Section <br />18CA; Tax lots 7000 & 7100). <br /> <br />DECISION: The Zoning Administrator for Marion County has APPROVED the above-described Conditional Use applica- <br />tion subject to certain conditions <br /> <br />EXPIRATION DATE: This conditional use permit is valid only when exercised by October 6th, 2027 (two years). The <br />effective period may be extended for an additional year subject to approval of an extension (form avail able from the Planning <br />Division). Additional extensions may not be granted if the regulations under which this decision was granted have <br />changed since the original approval. <br /> <br />WARNING: A decision approving the proposed use is for land use purposes only. Due to septic, well, and drain field <br />replacement areas, this parcel may not be able to support the proposal. To ensure the subject property can accommodate the <br />proposal the applicant should contact Building Inspection Division, (503) 588-5147. <br /> <br />This decision does not include approval of a building permit. <br /> <br />CONDITIONS: The following conditions must be met before a building permit can be obtained or the approved use <br />established: <br /> <br />1. The applicant shall obtain approval for any permits required by the Marion County Building Inspection Division. <br /> <br />2. The development shall significantly conform to the site plan submitted with the proposal. Minor variations are <br />permitted upon review and approval by the Planning Director. <br /> <br />3. Failure to continuously comply with the conditions of approval may result in this approval being revoked. Any <br />revocation could be appealed to a County hearings officer for a public hearing. <br /> <br />OTHER PERMITS, FEES AND RESTRICTIONS: This approval does not remove or affect covenants or restrictions <br />imposed on the subject property by deed or other instrument. The proposed use may require permits and/or fees from other <br />local, State or Federal agencies. This decision does not take the place of, or relieve the responsibility for, obtaining other <br />permits or satisfying any restrictions or conditions thereon. <br /> <br />APPEAL PROCEDURE: The Marion County Zone Code provides that certain applications be considered first by the <br />County Zoning Administrator. If there is any doubt that the application conforms with adopted land use policies and regula- <br />tions the Zoning Administrator must condition or deny the application. Anyone who disagrees with the decision may request <br />that the application be considered by a County hearings officer after a public hearing. The applicant may also request <br />reconsideration (one time only and a fee of $250) on the basis of new information subject to signing an extension of the 120 <br />day time limit for review of zoning applications. <br /> <br />A public hearing is held on appeals subject to the appellant paying a $250.00 fee. Requests for reconsideration, or consider- <br />ation by a hearings officer, must be in writing (form available from the Planning Division) and received in the Planning <br />Division, 5155 Silverton Rd. NE, Salem, by 5:00 p.m. on October 6th, 2025. If you have questions about this decision <br />contact the Planning Division at (503) 588-5038 or at the office. This decision is effective October 7th, 2025, unless further <br />consideration is requested. <br /> <br />FINDINGS AND CONCLUSIONS: Findings and conclusions on which the decision was based are noted below.
The URL can be used to link to this page
Your browser does not support the video tag.