My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8654353
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
19-XXXXXX
>
8654353
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2019 9:00:51 AM
Creation date
6/10/2019 2:26:06 PM
Metadata
Fields
Template:
Permits
Permit Address
23521 SCHULTZ RD NE
Permit City
AURORA
Permit Number
555-19-000202-PRMT
Parcel Number
031W32D 01600
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Septic Permit 555-19-000202-PRMT Page 4 of 4 <br /> Date Certificate,Issued:,05/23/2019 <br /> Work Description. NEW INSTALL: .4•EMPLOYEES' <br /> MAINTAIN PERMANENT ACCESS to septic tank for pumping and service. The septic tank should be pumped <br /> and inspected by a licensed septic tank pumping service before sludge and scum accumulations reach 30% of <br /> the tank liquid operating volume. Pumping every 3 to 5 years is an average interval. <br /> THE APPROVED SEPTIC SYSTEM AREA MUST BE PROTECTED from any vehicular traffic, livestock and <br /> farming activities. Other activities such as excavating or filling, driveway placement, paving or other similar <br /> activities that alter the natural soil conditions will adversely affect the soil and the septic system function and lead <br /> to premature system failure. The area must not be subjected to excessive saturation due to artificial drainage of <br /> ground surfaces, driveways, building downspouts or other sources. The areas of the initial septic system and the <br /> future repair system must both be protected. <br /> Installation of this onsite wastewater treatment system has been determined to comply with the applicable requirements in <br /> Oregon Administrative Rules Chapter 340, Divisions 071 and 073 and the Conditions of Approval above. <br /> 1. In accordance with Oregon Revised Statute 454,665,this Certificate of Satisfactory Completion is issued as evidence of <br /> satisfactory completion of an onsite wastewater treatment system at the location identified above. <br /> 2. Issuance of this Certificate does not constitute a warranty or guaranteethat this onsite wastewater treatment system will <br /> function indefinitely without failure. Conditions imposed as permit requirements continue for the life of the system. <br /> 3.The area of the initial and the identified replacement area must not be subjected to activity that is likely to adversely <br /> affect the soil or the functioning of the system. Such activities may include, but are not limited to,vehicular traffic, livestock, <br /> covering the area with asphalt or concrete,filling, cutting, or other soil modification activities. <br /> 4.This onsite wastewater treatment system that be connected to the facility referenced herein within 5 years of the <br /> issuance of this Certificate of Satisfactory Completion(CSC)or rules for authorization notices, alteration permits, or <br /> construction-installation permits as outlined in OAR 340-071-0160, 340-071-0205,or 340-071-0210 apply, including <br /> payment of an additional fee. <br /> 5.This system must operate in compliance with OAR Chapter 340, Division 071 and must not create a public health hazard <br /> or pollute public waters. <br /> 6. Unless otherwise required by the agent,the system installer must backfill (cover)this system within 10 days after the <br /> issuance of this Certificate of Satisfactory Completion. <br /> Certificate of Satisfactory Completion Y <br /> System Inspection: Yes Operation of Law-7 Days Notice: No Pre-Cover Inspection Waived Per 340-071: No <br /> Comments: N/A <br /> • • Completed Inspections <br /> Inspector Inspection Inspection Date Inspection Result <br /> Claudia Hill 7999 Final Septic 05/23/2019 Approved <br /> Claudia Hill 7700 ATT Start-up Checklist 05/23/2019 Approved <br /> Claudia Hill 7400 Gravelless Drainfield 05/15/2019 Approved <br /> Claudia Hill 7270 Tank Water Tightness 05/15/2019 Approved <br /> Claudia Hill 7310 Pump/Alarm System 05/15/2019 Approved <br /> Claudia Hill Onsite Inspector <br /> CALL BEFORE YOU DIG...IT'S THE LAW <br /> ATTENTION:Oregon law requires you to follow rules adopted by the Oregon Utility Notification Center. Those rules are set forth by Oregon Administration Rules. You may obtain copies <br /> of the rules by calling the center.(Note:The telephone number for the Oregon Utility Notification Center is 1-800-332-2344.) <br /> 5/23/19:5:13:26PM Page 4 of 4 ONS_OnsiteCSC_pr <br />
The URL can be used to link to this page
Your browser does not support the video tag.