Septic Permit 555-17-004985-PRMT Page 4 of 4
<br /> Date Ct rtifieate 1ssaedryO 10/20t9 $ , ' a
<br /> {irk Deiccr00i— ATl'`SYSTEIV ON NEW t ART°OF PROPERt gO,R,REP CEMEX4,BDR , ,1
<br /> '�� _-
<br /> f -5�� xH' -
<br /> Installation of this onsite wastewater treatment system has been determined to comply with the applicable requirements in
<br /> Oregon Administrative Rules Chapter 340, Divisions 071 and 073 and the Conditions of Approval above.
<br /> 1. In accordance with Oregon Revised Statute 454,665,this Certificate of Satisfactory Completion is issued as evidence of
<br /> satisfactory completion of an onsite wastewater treatment system at the location identified above.
<br /> 2. Issuance of this Certificate does not constitute a warranty or guarantee that this onsite wastewater treatment system will
<br /> function indefinitely without failure. Conditions imposed as permit requirements continue for the life of the system.
<br /> 3.The area of the initial and the identified replacement area must not be subjected to activity that is likely to adversely
<br /> affect the soil or the functioning of the system.Such activities may include, but are not limited to,vehicular traffic, livestock,
<br /> covering the area with asphalt or concrete,filling,cutting, or other soil modification activities.
<br /> 4.This onsite wastewater treatment system that be connected to the facility referenced herein within 5 years of the
<br /> issuance of this Certificate of Satisfactory Completion(CSC)or rules for authorization notices, alteration permits, or
<br /> construction-installation permits as outlined in OAR 340-071-0160, 340-071-0205,or 340-071-0210 apply, including
<br /> payment of an additional fee.
<br /> 5.This system must operate in compliance with OAR Chapter 340, Division 071 and must not create a public health hazard
<br /> or pollute public waters.
<br /> 6. Unless otherwise required by the agent,the system installer must backfill(cover)this system within 10 days after the
<br /> issuance of this Certificate of Satisfactory Completion.
<br /> �'�t"dc�a x '
<br /> G@CttflOf$at1�C1d GKtlnl@t1t71 � #
<br /> �;�..:,•, , <;�._.:- g La. ,...,�. �,9,°�,....�;y. ,,.s�,',>.;.,,d ,,;r, -.a„.F,. ,;.. ,,.z-,.,,_.. �,t.-s.Y �< <:. ,'�.:-.F:,r,,�� ,,�,"a� �..'.`k�:::� .,axe 5»-a�,« �§ ,
<br /> System Inspection: Yes Operation of Law-7 Days Notice: No Pre-Cover Inspection Waived Per 340-071: No
<br /> Comments: N/A
<br /> -r E �"x'�� �y t '- -s° �� `:a �1� . a .. C'
<br /> �s�fr��-
<br /> Inspector Inspection Inspection Date Inspection Result
<br /> Matthew Puntney 7999 Final Septic 05/08/2019 Approved
<br /> Rebecca Oakeson 7700 ATT Start-up Checklist 09/21/2018 Approved
<br /> Matthew Puntney 7020 Pre-cover 05/11/2018 Approved
<br /> Claudia Hill Onsite Inspector
<br /> CALL BEFORE YOU DIG...ITS THE LAW
<br /> ATTENTION:Oregon law requires you to follow rules adopted by the Oregon Utility Notification Center. Those rules are set forth by Oregon Administration Rules. You may obtain copies
<br /> of the rules by calling the center.(Note:The telephone number for the Oregon Utility Notification Center is 1-800-332-2344.)
<br /> 5/10/19:1:04:52PM Page 4 of 4 ONS_OnsiteCSC_pr
<br />
|