My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8605845
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
18-XXXXXX
>
8605845
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2019 8:43:03 AM
Creation date
4/30/2019 2:51:15 PM
Metadata
Fields
Template:
Permits
Permit Address
17088 DOUTHIT LN NE
Permit City
SILVERTON
Permit Number
555-18-005703-PRMT
Parcel Number
061E17 00101
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Start-Up Checklist/AdvanTex® Systems <br /> AX2ON.Start-Up Checklist For Oregon Service Providers <br /> Secondary Regiment System Timer Settings: <br /> Recirculating Splitterhl• erffy <br /> Valve Assembly.V the following: <br /> ON The:e:_ a. <br /> ❑Verify proper stinger. length.Stinger length: OFF Time: �j:a <br /> OVR ON Time. (,. <br /> AdvanTex m(AX2AN).Verify the following: owl OFF.rime: <br /> pods Installed level. IY Properwire size used based on information provided by <br /> All piping'property covered and compacted. manufacturer. <br /> ❑Conduit seal Installed. <br /> Ventilatf n System.Verify the following: / <br /> • <br /> aVenllation Intake(s)properly located and installed: L All electrical connections In panel are secure. <br /> AdvanTex:niter Operation.Take residual head measurement; [a Panel wired per manufacturer's wiring diagram. <br /> Pod#1: P;/1 /1OZZl4 ,-,� <br /> lJ control panel start-up procedures,as detailed in the AdvanTex <br /> Pod#2: dation Guide have been followed • <br /> Secondary Treatment.Notes: Appropriate diagrams left In panel for future review. <br /> Contiols Notes: <br /> Discharge Pump Basinirank.Verify the following: <br /> Basin odeVfank size(s): _ FInaVSafety Inspection <br /> I -Visually Inspect basin/tanks for Infiltration. Verify the.following: <br /> E leek-thatte-basiMank-ls-set-leve: ll <br /> a, ' C CP.rJ 1rP(I fin AlLsc <br /> nce-boxeS— <br /> DischargeBasinRank Pumping Equipment Verify the following access riser hardware ardware is In place.Lids are secured, <br /> uum//pi''ng equipment Installed properly. ritroi panel documentation lsieftat site <br /> E ump and discharge plumbing are compatible for automatic operation and:secured: 'panel!s set <br /> (e.g.pressure rating).21X____,211__________ <br /> Final Notes:SuS ect i- f fG1.� vP <br /> Pump model Installed: "' <br /> E Discharge plumbing properly Installed through watertight <br /> -- rommet,and ball valve is in open position. <br /> re Floats operate properly <br /> Fyeats set properly.... <br /> ' '' " <br /> Splice hoz mounted in access riser.Watertight connectors. . Hci ne_Wner's Package <br /> used. <br /> Discharge Basin/Tank Pum in ❑Homeowner's Package(and manual)has been'reviewed <br /> p g System:Verify proper operation of the with homeowner by....(check one) <br /> discharge basln/tank pumps. <br /> ,Pumps operate In Manual� s I 2 ❑installer <br /> Jumps operate In Automatic vows 1 9.4 ,®Service Provider <br /> ❑Dealer <br /> Controls Other Notes: <br /> NOTE:Refer to the control panel Instructions for detailed operational <br /> features of the control anel;Itself. <br /> RTt1.Number!' a't <br /> Control Panel model Installed: <br /> sa-ATZ4Mi.oa�t <br /> new o owls <br /> itJ ®;ms omnoo Symms`foo <br /> Payr2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.