Laserfiche WebLink
StartmU:� Checklist/AdvanTex° S stemsS SS�-<' �o o 5-7o 3 <br /> AX2ON Start-Up -Checklist , <br /> For Oregon Service Providers OreSystems' <br /> poratc <br /> 800-348-9843 <br /> Service Provider. R5 :C— ,\C a Date of Start-Up:q <br /> Project information / <br /> Primary`treatment <br /> Permit#: • <br /> Process Tank.Verify the following: <br /> Owner. 1pe /i <br /> o'i'0 mak.90 Number of Tanks: Tank size: gallons <br /> Address AC/i , s// <br /> 1 Number of compartments: <br /> City: CIIu4Y� / <br /> h State: `a Zip: .(11". � <br /> Phone Number:ala-cte)q Tank construction: Concrete berglass <br /> ner/En (neer; 8/4171e44.5 <br /> Tank manufacturer.. 0 re4 <br /> Desi C d <br /> g g Chi=c��� 8, 4 <br /> Phone: y� Prdcess ank Pumping:Equipment.Verify the following: <br /> _3 , G <br /> Authorized Installer, r� Pumpipg equipment Installed properly <br /> Phone: , j _ ( - ?�Cdd Discharge plumbing properly Installed through watertight <br /> Phone: <br /> Dealer.X, ^�-,LLgrommet and ball valve is In open:position. <br /> Phone: ( - EiHsembly mounted in Blotubee vault and properly set <br /> per AdvanTex Installation Guide.Float cords neatly wrapped <br /> Electrician: around splice box and tied. <br /> Phone: Floats operate properly, if-3A <br /> Residential stemInfonnation FI set properly at .9 ^ /C.rj R 25.5. <br /> Number of Bedrooms: llE/$plica box mounted on access riser Watertight connectors <br /> used. <br /> Number of Occupants: Process Tank Pumping System.Verify proper operation of the pumps. <br /> Number of.Filter Pods: I Mode: ' F., ,Pumps operate In Manual. <br /> NSF Certification Labelin on Panel and Pod? D <br /> Pod Sticker <br /> y y , <br /> Punips operate In Automatic. <br /> Dispersal Method: P>/e$s vre r W"Po 3D <br /> fps: I . 3 <br /> VoIkS: 19- <br /> Items Not Visible During Start-Up Inspection <br /> Processtank hasproper bedding and Is set level. <br /> Is] Discharge.basin/tank'has proper bedding and is set level. <br /> rIs] Requirements for anti-flotation have been met for processing tank and discharge pump basin/tank. <br /> I I Tank was tested for watertightness. <br /> 14 Requirements for anti-flotation have been met for AdvanTex filter pod. <br /> • IR AdvanTex system has properiy sized and installed underdraln pipe,with a slope on:underdrilnthat allows for proper ventilation. <br /> Wl connections havebeen properly.glued—including the use of primer—and cleared of debris. <br /> �] The elevation difference between the Invert of the outlet to the Invert of the RSV Is adequate. <br /> Transport line from the discharge.pump basin/tank to the drainfield_has been installedand cleared of debris.All connections <br /> have been properly glued---including the use of primer. <br /> Drainfleld has been f .... deli s specifications. <br /> Installer Signature: <br /> 02005 OreugO Systeme roe <br /> SCUNIX M-Oi-1 <br /> Rev 3.1,011.._ <br /> N5 <br /> Page.i an. <br />