Laserfiche WebLink
Septic Permit 555-18-007108-PRMT Page 5 of 5 <br /> Dateā€¢Certificate1ssued :03/07/2019 <br /> Wodc Description:-' MAJ`REP FOR5ytBDRM RES <br /> Installation of this onsite wastewater treatment system has been determined to comply with the applicable requirements in <br /> Oregon Administrative Rules Chapter 340, Divisions 071 and 073 and the Conditions of Approval above. <br /> 1. In accordance with Oregon Revised Statute 454,665,this Certificate of Satisfactory Completion is issued as evidence of <br /> satisfactory completion of an onsite wastewater treatment system at the location identified above. <br /> 2. Issuance of this Certificate does not constitute a warranty or guarantee that this onsite wastewater treatment system will <br /> function indefinitely without failure. Conditions imposed as permit requirements continue for the life of the system. <br /> 3.The area of the initial and the identified replacement area must not be subjected to activity that is likely to adversely <br /> affect the soil or the functioning of the system. Such activities may include, but are not limited to,vehicular traffic, livestock, <br /> covering the area with asphalt or concrete,filling,cutting, or other soil modification activities. <br /> 4.This onsite wastewater treatment system that be connected to the facility referenced herein within 5 years of the <br /> issuance of this Certificate of Satisfactory Completion (CSC)or rules for authorization notices,alteration permits,or <br /> construction-installation permits as outlined in OAR 340-071-0160, 340-071-0205, or 340-071-0210 apply, including <br /> payment of an additional fee. <br /> 5.This system must operate in compliance with OAR Chapter 340, Division 071 and must not create a public health hazard <br /> or pollute public waters. <br /> 6. Unless otherwise required by the agent,the system installer must backfill (cover)this system within 10 days after the <br /> issuance of this Certificate of Satisfactory Completion. <br /> Certificate of SatisfactoryCompletion <br /> System Inspection: Yes Operation of Law-7 Days Notice: No Pre-Cover Inspection Waived Per 340-071: No <br /> Comments: N/A <br /> Completed Inspections <br /> Inspector Inspection Inspection Date Inspection Result <br /> Claudia Hill 7999 Final Inspection 03/07/2019 Approved <br /> Claudia Hill 7700 ATT Start-up Checklist 02/28/2019 Approved <br /> Claudia Hill 7310 Pump/Alarm System 02/19/2019 Approved <br /> Claudia Hill 7270 Tank Water Tightness 02/19/2019 Approved <br /> Claudia Hill 7400 Gravelless Drainfield 10/16/2018 Approved <br /> Claudia Hill Onsite Inspector <br /> CALL BEFORE YOU DIG...IT'S THE LAW <br /> ATTENTION:Oregon law requires you to follow rules adopted by the Oregon Utility Notification Center. Those rules are set forth by Oregon Administration Rules. You may obtain copies <br /> of the rules by calling the center.(Note:The telephone number for the Oregon Utility Notification Center is 1-800-332-2344.) <br /> 3/7/19:4:27:40PM Page 5 of 5 ONS_OnsiteCSC_pr <br />