Laserfiche WebLink
Onsite Permit 555-18-007108-PRMT Page 4 of 7 <br /> Schedule Inspections online at www.buildingpermits.oregon.gov or by calling: 1-888-299-2821 or 503-588-5147 <br /> When calling for an inspection, use IVR Number:555022316821 <br /> Date issued 9/28/18 Expiration date9/28/1.9 <br /> Work description;MAJ REP FOR 5 BDRM RESu <br /> Conditions of approval <br /> Approved Area & System Type: <br /> An evaluation of the test holes dug for soil analysis was completed on <br /> September 19, 2018. The conditions observed during this site evaluation <br /> indicate the area around the evaluated test holes is not capable of supporting a <br /> standard septic system due to seasonal temporary groundwater level too close <br /> to the ground surface and limited usable area meeting setbacks. Please refer <br /> to the signed site plans dated September 28, 2018. <br /> Under these conditions, an ALTERNATIVE TREATMENT TECHNOLOGY <br /> (ATT) System with TREATMENT STANDARD #1 is required to adequately <br /> treat sewage effluent under DEQ rules. ATT Systems are devices connected <br /> to a septic system. They are designed to provide pre-treatment of effluent to <br /> reduce the level of bacteria prior to dispersal into a drainfield. They use <br /> mechanical circulation to provide a high level of treatment. ATT Systems are <br /> installed in soils where effective soil depth, saturated soils, available space, or <br /> other site conditions are severely limiting. <br /> This Permit is for a system designed to serve a single family dwelling with a <br /> maximum of 5 (five) bedrooms. Peak sewage flow into the system is limited to <br /> a maximum of 525 gallons per day, with an average sewage flow of not more <br /> than 263 gallons per day. Premature failure of the treatment system may <br /> occur if either of these flow quantities is exceeded. If, for some reason, you <br /> expect your domestic household water use may exceed these flows, it is <br /> advisable to increase the size of the treatment system. <br /> Specific Requirements: <br /> ATT Pretreatment Unit: Advantex AX25RTN as per submitted plans <br /> SERVICE CONTRACTS: The owner of an ATT system must maintain a <br /> service contract with a maintenance provider certified by the manufacturer to <br /> service and maintain the onsite system. A service contract must be entered <br /> into before the system is installed and must be maintained until the system is <br /> decommissioned. The service contract must provide for a minimum of four <br /> inspections and service visits by a maintenance provider scheduled once every <br /> six months over a two-year period to inspect, adjust, and service the ATT. The <br /> 3/7/19:4:09:20PM Page 4 of 7 ONS_OnsitePermitpr <br />