Laserfiche WebLink
`~. <br />~ <br />' ' <br />~ P`ENCE/I~ELLY CONSTRtJGTiON, tNC. <br />PI'OJECt: COURTHOUSE S~UARE "STREEt'SCAPE ALT. #2" <br />Estimate Type: Preliminary Budget <br />Location: High and Court Streets <br />Attention: Marion County/Salem Area Transit Estimato~ : David Hays <br />Architect : Arbuckle Costic Arch. <br />Drawing Date: August 26, 1997 <br />Structure: 5 Story Plan <br />Date: November 24, 1997 <br />Gross Square Feet: <br />7,520 <br />Chemeketa Street <br />DESCRIPTION COST COST/S.F. <br />SIteW01'k $105,550 $14.04 <br /> <br />Foundations $o $o.oo <br /> <br />Substructure $o $o.oo <br /> <br />Su erstYUCture $70,000 $9.31 <br />Exterior Closure $s,ooo $~ .os <br /> <br />Roofin $2s,s2s $3.54 <br /> <br />-~terior Construction $o $o.oo <br /> <br />Conve in S stems $o $o.oo <br />Mechanical $s,eos $~.~~ . <br /> <br />Electrical $2a,soo $s.2s <br />SUbtOt31 $243,483 $32.38 <br /> <br />General Conditions/Permit $2o,sss $2•75 <br />Subtotal $264,179 $35.13 <br /> <br />Contractor OH & Profit $~2,549 $~.67 <br />Total Contractor Cost $2~s,72s $as.so <br />Contractor's Standard Exclusions: <br />1. NA 9. Site Survey & Boundary Control <br />2. Storm Sewer Revisions 10. Soils Report ~ <br />3. Systems Development 8~ LID Costs <br />4. Testing 8~ Inspection Costs 11. Environmental Assessment Survey <br />12. Hazardous & Toxic Waste Removal , <br />5. Builder's Risk tnsurance Premiums 13. Removal of Soil Contaminated by <br />& Deductibles Hazardous or Toxic Wastes <br />7. NA <br />8. Owner's Legal & Financing Costs 14. Utilities are assumed to be within <br />100' of Buitding connection point <br />~ - <br />