My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Financial- Salem, City of (Streetscape)
>
CS_Courthouse Square
>
Financial- Salem, City of (Streetscape)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 3:34:12 PM
Creation date
9/7/2011 2:41:38 PM
Metadata
Fields
Template:
Building
RecordID
10225
Title
Financial- Salem, City of (Streetscape)
Company
Marion County
BLDG Date
12/24/1997
Building
Courthouse Square
BLDG Document Type
Finance
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City Summary <br />' PENCE/KELLY ~ONSTRUGTION, ING. <br />~ rnate #2 Cftemeketa Street 2a-n~o~-s~ <br />_; Streetscap~ Alte <br />alWCurb Improvements* <br />curb & gutter w/ related asphalt work $13,675 <br />sidewalk & driveway approaches $16,853 <br />brick thin-set pavers $52,500 <br />resignalization (allowance) $~ <br />brick, glazing and precast finishes at shelter arcades and towers $8,000 <br />striping and handicap signage for street parking $1,000 <br />subtotal $92,028 <br />Furnishings <br />landscape and irrigation at tree wells (54)ea. <br />$5,500 <br />tree grates 6'x6' (54)ea. $~2'122 <br />$3,900 <br />benches (12)ea. $~ <br />trash receptacles (5)ea. $~ <br />planter pots at plazas (12)ea $~ <br />bike racks (3)ea $~ <br />flag poles at Hatfield Plaza (4)ea $24 <br />500 <br />street lamps and poles (28)ea , <br />$~ <br />misc. lighting at weather shelters (allowance) <br />subtotal $46,022 <br />~er Protection Facilities <br />433 <br />$105 <br />perimeter weather protection shelters at building perimeter , <br />arcade and comer weather protection shelters from street <br />clock tower $0 <br />, <br />truss weather protection shelters at bus entrances $~ <br />subtotal $105,433 <br />ary Sewer Upgrade <br />$~ <br />traffic control $~ <br />earth work $~ <br />pipe work $~ <br />new manhole $~ <br />surface restoration , <br />' ' _ AI~ <br />Remove and Replace Old Bus Station in High Street $0 <br />Remove Island <br />surface restoration $~ <br />new curb and sidewalk at corners only (2)ea $~ <br />---~,_._~ @n <br />~uutviai $33,245 <br />General Conditions/OH & P~ofiUPermits <br />Total Contractor Costs $276,728 <br />Architectural and Engineering Costs $16,604 <br />Total Streetscape Costs'* $293,331 <br />* Demolition costs for the existing sidewalks has been paid for under the main project <br />'*Alternate #1 and #2 are included in this cost <br />This cost represents the true cost of the streetscape package. <br />This does not necessaril re resent the fundin re uested from the Ci of Salem's urban renewal fund <br />Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.