Laserfiche WebLink
COURTHOUSE SQUARE <br />OUTLINE SPECIFICATION <br />PROJECT NO. 9828 <br />July 23, 1998 <br />Page 9 <br />(1) They are indicated or implied on shop drawings or project data <br />submittals without request submitted as specified in this paragraph. <br />(2) Acceptance will require substantial revision of Contract Documents. <br />16. Section 01700, Contract Closeout: <br />a. Prior to issuance of Certificate of Substantial Completion, submit to Architect th~e <br />following documents: <br />i. Guarantees: The guarantee required by the General Conditions and all other <br />extended guarantees stated in the specifications. <br />ii. Release or Waiver of Liens: Contractor's Affidavit of Release of Liens (AIA <br />G706A) and Payments of Debts and Claims (AIA G706). <br />iii. Consent of Surety to Final Payment. <br />iv. Operation and Maintenance Manuals: As required by Section 01730. <br />v. Project Record Documents: As required by Section 01720. <br />vi. Certificate of Occupancy: Obtain and pay for Certificate of Occupancy as issued <br />by the Building Official. <br />17. Section 01710, Cleaning: <br />a. Safety Requirements: <br />i. Maintain project in accord with applicable safety and insurance standards. <br />ii. Prevent accumulations of waste, debris and rubbish which create hazardous <br />conditions. <br />iii. Provide adequate ventilation during use of volatile or noxious substances. <br />iv. Do not burn rubbish and waste materials; remove from Owner's property and <br />legally dispose of. <br />b. Cleaning During Construction: <br />i. Maintain Owner's property and public properties free from accumulations of <br />waste, debris and rubbish caused by operations. Remove crates, cartons and <br />~ other flammable waste materials from work areas at end of each working day. <br />c. Handle waste materials, debris and rubbish in a controlled manner with as few handlings <br />as possible; do not drop or throw materials from heights. <br />d. In preparation for substantial completion or occupancy; conduct final inspection of sight- <br />exposed interior and exterior surfaces and accessible concealed spaces. <br />18. Section 01720, Project Record Documents: <br />a. Maintain at job site documents required by Article 3.11 of the General Conditions. <br />b. Keep record documents current. Do not permanently conceal any work until required <br />information has been recorded. <br />c. At completion of project, deliver record documents to Architect. <br />19. Section 01730, Operation and Maintenance Data: <br />a. Submittals: <br />i. Furnish 3 complete sets of manuals containing the manufacturer's instructions <br />~ for operation and maintenance of each item of equipment and apparatus <br />furnished under the Contract and any additional data specifically required under <br />