Laserfiche WebLink
~~ <br />~ <br />~1r.r <br />Courthouse Square <br />Court & High Street <br />Salem, Oregon <br />Arbuckle Costic Architeds, Inc <br />Design Development Probable Cost EsGmate <br />Architectural Cost Consultants, LLC <br />James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA <br />6441 SW Canyon Court, Suite 103 <br />Portland, Oregon 97221 <br />Phone (503)297-7210 Fax (5031297-7187 <br />Quantitv Unit CosUU <br />Estimate Date: R1 &Aug-9 <br />Document Date: 23-Ju1-98 <br />Print Date: 18-Aug-98 <br />Print Time: 05:44 PM <br />~nstruction Start: Spring 99 <br />ELECTRICAL <br />basic materials & power distribution 19,467 sf 1.70 33,094 <br />Subtotal 33,094 <br />TOTAL - ELECTRICAL $33,094 1.70 <br />SUBTOTAL 5s2.sso a582,990 <br />GENERAL CONDITIONS 7.75% 45,182 <br />GENERAL CONTR. FEE 3.75% 23,556 <br />ESTIMATING CONTINGENCY 4.50% 29,328 <br />INDEX TO CONSTRUCTION START Spring 99 0.75% 5,108 t 3% per year <br /> 103,174 <br />TOTAL DIRECT CONSTRUCTION COST <br />Parkin Altemate 2 19,467 sf $35.25 $686,164 <br />Alternates - Page 12 <br />