Laserfiche WebLink
Courthouse Square ArchitectuCal Cost Consultants, LLC Estimate Date: R18-Aug-98 <br />Couft & Hlgh Street James A. JeMe, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98 <br />Salem, Oregon 6441 SW Canyon Court, Suite 103 . Print Oate: 18-Aug-98 <br />Arbuckle Costic Architects, Inc PoNand, Oregon 97221 Print Time: 05:44 PM <br />'~esign Development Probable Cost Estimate Phone (503) 297-7210 Fax (503) 297-7187 Construction Start: Spring 99 <br />r <br />Altemates Quantitv Unit CosWnit Cost Total Comments <br />SPECIALTIES <br />Louvers <br />wall louvers sf 0.00 0 NIC - verify <br />Subtotal <br />Wail & Corner Guards <br />Corner guards ea 0.00 0 NIC - verify <br />Subtotal <br />Signage Systems <br />signage systems 19,467 sf 0.10 2,000 allowance <br />ADA parking signs 0 ea 75.00 0 <br />Subtotal 2,00 <br />Fire extinguisher & cabinets <br />FEC 3 ea 250.00 750 verify <br />Subtotal 75 <br />TOTAL - SPECIALTIES $2,75 0.14 <br />EQUIPMENT <br />Parking Equipment <br />item <br />Subtotal <br />TOTAL - EQUIPMENT <br />ea 0.00 0 NIC - See Parking Estimate <br />$ 0.00 <br />CONVEYING SYSTEMS <br />Pssngr elevator 3000# geared - 350 fpm 0 stop 0.00 0 NIC <br />Cab finishes sum 0.00 0 NIC w/ building <br /> <br />Subtotal I <br />~ <br />i <br />TOTAL - CONVEYING SYSTEMS S 0.00 ' <br />HVAC <br />ventilation / exhaust system 19,467 sf 2.15 41,854 <br />ef-4 ea 0.00 0 <br />ductwork cfm 0.00 0 <br />controls ea 0.00 0 <br />balancing sum 0.00 0 <br />Subtotal 41,8 2.15 <br />Plumbing <br />item ea 0.00 0 <br />Subtotal 0.00 <br />Fire sprinklers <br />dry system 19,467 sf 1.55 30,174 <br />Subtotal 30,17 1.55 <br />TOTAL - MECHANICAL 572,02 3.70 <br />Alternates - Page 11 <br />