Laserfiche WebLink
~ ~ ~ ~ _ ~ <br />Courthouse Square <br />Court & High Street <br />Salem, Oregon <br />Arbuckle Costic Architects, Inc <br />Design Development Probable Cost Estimate <br />Parking Level One <br />Gross Area <br />Parkin~ <br />I ELECTRICAL <br />basic materials & power distribution ' <br />lighting <br />100 watt hps 12" surface mtd <br />fire alarm <br />snow melting @ ramp <br />Subtotal <br />TOTAL - ELECTRICAL <br />- - __ <br />SUBTOTAL <br />GENERAL CONDITIONS <br />GENERAL CONTRACTOR FEE <br />ESTIMATING CONTINGENCY <br />INDEX TO CONSTRUCTION START <br />TOTAL DIRECT CONSTRUCTION COST <br />Parkin~ <br />~ ~ ~ r ~ ~ ~ ~ ~ ~ ~ ~ ~ <br /> ---- _ _ - ___- ---- _ _ _ <br />Architectural Cost Consultants, LLC _ <br />Estimate Date: R21-Aug-98 <br /> James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98 <br /> 6441 SW Canyon Court, Suite 103 Print Date: 21-Aug-98 <br /> Portiand, Oregon 97221 Print Time: 1120 AM <br /> Phone (503) 297-7210 Fax (503) 297-7187 Construction Start: Spring 99 <br />_ _ _ _ _ - - - <br />70,793 -- ------ <br /> ___ _-- - <br />70,793 sf <br /> <br />_ <br /> - _ _ -- - -- - - ---_ <br />Quantity Unit CosUUnit Cost Total Comments <br /> <br />70,793 sf 0.75 53,095 53,095 <br /> 0 <br />70 fixt 435.00 30,450 30,450 <br />70,793 sf 0.40 28,317 28,317 <br />2,254 sf 18.00 40,572 <br />- _--- - 40,572 <br /> 152,434 0 0 152,434 <br />- -- - __ <br />$152,434 <br />$0 <br />$0 <br />____ __ - - _ _ _ ---_ - - <br />2,566,338 ~2,566,338 --- <br />399,374 <br />399,374 <br />7.75% 198,891 30,951 30,951 <br />3.75°/a 103,696 16,137 16,137 <br />4.50% 129,102 20,091 20,091 <br />Spring 99 0.75% 22,485 ~454,174 3,499 3,499 <br />70,793 sf 542.67 /sf a3,020,5121 $470 <br />152,434 2.15 <br />__ _ - -- ---- <br />1,767,590J $2,566,338 <br />136,988 <br />71,422 <br />88,920 <br />15,487 @ t 3% per year <br />$3 020,512 <br />Parking Detail Estimate - Page 11 <br />