Laserfiche WebLink
_ _ i _ _ __ --- _ - __---- _ _ -- _ __ _ _ __ __ __ __ _ -- _ , <br />Courthouse Square ~ Architectural Cost Consultants, LLC I Estimate Date: R21-Aug-98 <br />Court & High Street I James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98 <br />Salem, Oregon ~ 6441 SW Canyon Court, Suite 103 Print Date: 21-Aug-98 <br />Arbuckle Costic Architects, Inc ; Portland, Oregon 97221 Print Time: 11:20 AM <br />Design Development Probable Cost Estimate ~ Phone (503) 297-7210 Fax (503) 297-7187 Construction Start: Spring 99 <br />__---- _ ___ <br />Parking Level One 70,793 <br />_ _- _. . <br />Gross Area i 70,793 sf <br />~ - __ __ __ _ , _ _ _ <br />Parkin~ ~ Quantity Unit CosUUnit Cost Total '` y~ ~ ~~ Comments <br />MECHANICAL <br />, <br />HVAC <br />ventilation / exhaust system <br />ef-3 1 ea 2,800.00 <br />ef-4 1 ea 2,800.00 <br />ductwork 100,000 cfm 1.35 <br />controls 2 ea 2,000.00 <br />balancing 1 sum 3,000.00 <br />Subtotal <br />Plumbing <br />trench drain ~ 25 If 60.00 <br />underslab piping - 6" 18 If 30.00 <br />Subtotal <br /> <br />Fire sprinklers ~ <br />dry system 70,793 sf 1.55 <br />Subtotal ~I <br />TOTAL - MECHANICAL <br /> <br />2,800 2,800 ; <br />2,800 2,800 ~ <br />135,000 135,000 <br />4,000 4,000 <br />3,000 <br />---- 3,000 <br />147,600 0 0 147,600 <br />1,500 1,500 <br />540 <br />_ _ -- . _ <br />-- 54p ~ <br />2,040 0 0 2,040 <br />109,729 <br />-- - -- 109,729 <br />109,729 0 0 109,729 <br />~259,369 __ $0 _ _ _ _ $0 $259,369 <br />Parking Detail Estimate - Page 10 <br />issume 50000 cfm <br />issume 50000 cfm <br />2.08 <br />~erify pipe size <br />0.03 <br />1.55 <br />3.66 <br />~ <br />