Laserfiche WebLink
~ ~ ~ ~ ~^^ i <br />Courthouse Square <br />Court 8 High Street <br />Salem, Oregon <br />Arbuckle Costic Architects, Inc <br />Design Development Probable Cost Estimate <br />~ Ground Level <br />~ Second Floor <br />Third Floor <br />Fourth Floar <br />Frfth Floor <br />Penthouse <br />i Total Gross Area <br />~Buildin~ Shell 8 Core <br />ELECTRICAL - Continued <br />Branch Wiring <br />receptacle w/ box <br />I, receptacle w/ box gfi <br />' double duplex recpt w/ box <br />I equipment connections <br />fused disc. switch <br />handicapped door actuators <br />smoke damper connections <br />'~, Itg switch 20A, 120 V w/ box <br />~ Itg switch 20A, 120V w/ box, 3-way <br />I misc wiring <br />unaccounted <br />Lighting <br />1x4 <br />~i 2x4 <br />~ recessed can <br />typ. lobby <br />entry lobby <br />exit / egress <br />, Signal Systems <br />tel outlet w/ box <br />j data outlet w/ box <br />fire alarm system - addressable <br />I fire alarm <br />I fire alarm pull stations <br />smoke detectors <br />I speakers <br />; heat detectors <br />', visual strobes <br />hom strobe <br />' fire alarm front end <br />^ ~ ~ ~ ^i^~ ~ ~ ~ ~ <br />_ _ _ _ _------ -- _ _ - ------ _ _ -- - - - <br />Architectural Cost Consultants, LLC <br />James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA <br />6441 SW Canyon CouR, Suite 103 <br />Portland, Oregon 97221 <br />Phone (503)297-7210 Fax (503)297-7187 <br />_ . 23,249 <br />32, 088 <br />32,088 <br />32,088 <br />32,012 <br />1,818 <br />153,343 <br />_______ _ <br />Quantity Unit CosUUnit Cost Total <br /> ea 75.00 0 <br /> ea 84.00 0 <br /> ea 85.00 0 <br /> ea 75.00 0 <br /> ea 255.00 0 <br />4 ea 250.00 1,000 <br /> ea 98.00 0 <br /> ea 75.00 0 <br /> ea 80.00 0 <br />51,600 If 3.75 193,499 <br />153,343 sf 0.35 53,670 <br />80 fixt 125.00 10,000 <br />80 fixt 160.00 12,800 <br />48 fixt 110.00 5,280 <br />12 fixt 250.00 3,000 <br />30 fixt 135.00 4,050 <br />0 <br />0 <br />153,343 sf 1.00 153,343 <br />ea 185.00 0 <br />ea 160.00 0 <br />ea 175.00 0 <br />ea 135.00 0 <br />ea 165.00 0 <br />ea 165.00 0 <br />ea 190.00 0 <br />sum 8,000.00 0 <br />~ s ^~ ~ ~ <br />-- ---- _____- - _ <br />Estimate Date: R21-Aug-98 <br />Oocument Date: 23-Ju1-98 <br />Print Date: 21-Aug-98 <br />Print Time: 1120 AM <br />Construction Start: Spring 99 <br />Comments <br />1.62 <br />Building Shell & Core Detail Estimate - Page 19 <br />