Laserfiche WebLink
Courthouse Square <br />Court & High Street <br />Salem, Oregon <br />Arbuckle Costic Architects, Inc <br />Design Development Probable Cosl Estimate <br />Ground Level <br />Second Floor <br />Third Floor <br />Fourth Floor <br />Fifth Fioor <br />Penthouse <br />Total Gross Area <br />Building Sheil & Core <br />MECHANICAL <br />HVAC <br />basic materials & methods <br />boiler & heating water system <br />central air handling 8~ fan system <br />ac-1 8~ 2- 90 ton <br />ac-3 - 130 ton <br />ac-4 - 25 ton <br />air distribution <br />mp ductwork & insulation <br />slot diffusers <br />square diffusers <br />return air grilles <br />terminal & package units <br />VAV FP terminal unit, elect reheat <br />TU <br />controls <br />balancing <br />remainder undefined <br />Subtotal <br />--- --- - _ __ ---_ - . __ -- <br />Architectural Cost Consultants, LLC <br />James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA <br />6441 SW Canyon Court, Suite 103 <br />Portland, Oregon 97221 <br />Phone (503) 297-7210 Fax (503) 297-7187 <br />_ 23,249 - - - _ _ <br />32, 088 <br />32,088 <br />32,088 <br />32,012 <br />1,818 <br />153,34: <br />_ ___ ___ _ _ __ _ <br />Quantity Unit CosUUnit Cost Total <br />153,343 sf 1.00 153,343 <br /> sf 0.00 0 <br />180 ton 1,075.00 193,500 <br />130 ton 970.00 126,100 <br />25 ton 1,200.00 30,000 <br />~ <br />128,150 cfm <br />3.00 <br />384,450 <br />~ <br />' 27 ea <br />300.00 <br />8,100 <br />89 ea 200.00 17,800 <br />29 ea 100.00 2,900 <br />45 ea 1,200.00 54,000 <br />115 ea 1,000.00 115,000 <br /> 0 <br />153,343 sf 1.25 191,678 <br /> 0 <br /> 0 <br />153,343 sf 0.50 76,671 <br /> 0 <br />153,343 sf 1.25 191,678 <br />- - - - - -- <br /> 1,545,220 <br /> 153,343 <br /> 0 <br /> 193,500 <br /> 126,100 <br /> 30,000 <br /> 384.450 <br /> 8,100 <br /> 17.800 <br /> 2,900 <br /> 5a,o00 <br /> 115,000 <br /> 191,678 <br /> 76,671 <br /> 191,678 <br />0 0 0 0 1,545,220 <br />10.08 <br />Building Shell 8 Core Detail Estimate - Page 16 <br />Estimate Date: R21-Aug-98 <br />Document Date: 23-Ju1-98 <br />Print Date: 21-Aug-98 <br />Print Time: 11:20 AM <br />Construction Start: Spring 99 <br />Comments <br />