My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Design Development Construction Cost Estimate
>
CS_Courthouse Square
>
Design Development Construction Cost Estimate
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:08:30 AM
Creation date
9/6/2011 10:32:45 AM
Metadata
Fields
Template:
Building
RecordID
10335
Title
Design Development Construction Cost Estimate
Company
Architectural Cost Constultants
BLDG Date
8/21/1998
Building
Courthouse Square
BLDG Document Type
Design - Planning
Project ID
CS9601 Courthouse Square Research
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ ~ ~ ~ ~ ~ ~ ~ r ~ ~ ~ ~ ~ ~ <br />Courthouse Square <br />Court & High Street <br />Salem, Oregon <br />Arbuckle Costic Architects, inc <br />Desi~n Development Probable Cost Estimate <br />Ground Level <br />Second Floor <br />Third Floor <br />Fourth Floor <br />Fifth Floor <br />Penthouse <br />Total Gross Area <br />Buitdin~Shell & Core <br />FURNISHINGS <br />i Window treatment <br />@ relites & sidelites <br />windows <br />curtain wall <br />' Subtotal <br />Floor Mats 8 Frames <br />i Walk-off mat <br />Subtotal <br />TOTAL - FURNISHINGS <br />SPECIAL CONSTRUCTION <br />Item <br />~ Subtotal <br />~ TOTAL - SPECIAL CONSTRUCTION <br />I CONVEYING SYSTEMS <br />I ___ _- - <br />, Pssngr elevator 3000# geared - 350 fpm <br />~i Cab finishes <br />premium for extended cab ht. <br />; Subtotal <br />~ _ _ TOTAL - CONVEYING SYSTEMS <br />Architectural Cost Consultants, LLC <br />James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA <br />6441 SW Canyon Court, Suite 103 <br />Portland, Oregon 97221 <br />Phone (503)297-7210 Fax (503)297-7187 <br />_ 23.249 _ _ <br />32,086 <br />32,088 <br />32, 088 <br />32,012 <br />1,818 <br />-----_ <br />153,34 <br />_ __ __ <br />Quantity Unit CosUUnit Cost Total <br />350 sf 3.00 1,050 <br />11,008 sf 3.00 33,024 <br />3,038 sf 3.00 9,114 <br />0 <br />SO <br />~~ 15 stop 20,500.00 307,500 <br />I~, 3 ea 6,000.00 18,000 <br />! 1 sum 1,800.00 1,800 <br />i <br />~ ~ ~ ~ <br />_ t ___ - -- - -- __-- <br />I Estimate Date: R21-Aug-98 <br />Document Date: 23-Ju1-98 <br />Print Date: 21-Aug-98 <br />Print Time: 11:20 AM <br />~ Construction Start: Spring 99 <br />Comments <br />_ _ _ - <br />ao~ $o~ ao~ so <br />so so ao $o <br />ao $o ao so <br />1,050 <br />33,024 <br />s,~~a verify <br />343.188 <br />2,s8o vestibule only <br />s2,aao <br />~- - - o <br />o $o ao So 30 <br />_ ao so ao ao ao <br /> 307,500 <br /> 18,000 <br /> 1,800 <br />327,300 SO 30 SO $o a327,300 <br />a327,300 _ __ SO __ 3o SO ___ _ $o _ 5327,300~ <br />2.13 <br />Building Shell 8 Core Detail Estimate - Page 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.