My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Design Development Construction Cost Estimate
>
CS_Courthouse Square
>
Design Development Construction Cost Estimate
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:08:30 AM
Creation date
9/6/2011 10:32:45 AM
Metadata
Fields
Template:
Building
RecordID
10335
Title
Design Development Construction Cost Estimate
Company
Architectural Cost Constultants
BLDG Date
8/21/1998
Building
Courthouse Square
BLDG Document Type
Design - Planning
Project ID
CS9601 Courthouse Square Research
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ ~ ~ ~ e ~ ~ ~ <br />Courthouse Square ~ <br />Court & High Street i <br />Salem, Oregon <br />Arbuckle Costic Architects, Inc <br />Oesign Development Probabte Cost Estimate <br />~ Ground Level <br />County <br />Transit <br />Conference Center <br />Total Area <br />~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ <br />_ __ __ __. _ _ _ __ ___ _ <br />Architectural Cost Consultants, LLC ~ Estimate Date: R21-Aug-98 <br />James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA ~ Document Date: 23-Ju1-98 <br />6441 SW Canyon Court, Suite 103 Print Date: 21-Aug-98 <br />Portland, Oregon 97221 Print Time: 11:42 AM <br />Phone (503) 297-7210 Fax (503) 297-7187 Construction Start: Spring 99 <br />2,532 <br />6,572 <br />4,826 <br />13,930 sf I <br />_ _- - __. <br />Ground Level Tenant Finishes Quantity Unit CosUUnit <br />- _ __ _ <br />DOORS, WINDOWS & GLASS <br />__ <br />Doors, Frames & Hardware (incls. installatio ) <br />interior doors <br />transit <br />toilet 4 ea <br />janitor 1 ea <br />other 8 ea <br />conference center <br />toilet 3 ea <br />lobby 2 pair <br />4' bifold 2 pair <br />other 6 ea <br />single swings 11 ea <br />county <br />pairs 1 pair <br />Subtotal <br />Relites, Sidelites & Transoms <br />super 20 sf <br />conference 20 sf <br />Subtotal <br />Overhead & Coiling Doors ~I <br />security grilles sf <br />Subtotal <br />Glass & Glazing ~ <br />plate mirror ' 92 sf <br />conference center 84 sf <br />Subtotal I <br />TOTAL - DOORS, WINDOWS 8 GLASS <br /> <br />. <br />- <br />_ <br />Cost Total ;~ ~`~ ` <br />700.00 2,800 <br />750.00 750 <br />750.00 6,000 <br />700.00 2,100 <br />2,800.00 5,600 <br />450.00 900 <br />750.00 4,500 <br />750.00 8,250 <br />1, 700.00 1, 700 <br />32,6C <br />30.00 600 <br />30.00 600 <br />- <br />1,2C <br />0.00 0 <br />11.00 1,012 <br />11.00 924 <br />_ _ __ _ - 1,9~ <br />- --- <br />_ 535,73 <br /> 0 2,800 0 <br /> 0 750 0 <br /> 0 6,000 0 <br /> 0 0 2,100 <br /> 0 0 5,600 <br /> 0 0 900 <br /> 0 0 4,500 <br /> 0 0 8,250 <br /> 1,700 0 0 <br />0 1,700 9,550 21,350 <br /> 0 600 0 <br /> 0 600 0 <br />0 0 1,200 0 <br /> 0 0 0 <br />0 0 0 0 <br /> 0 1,012 0 <br /> 0 0 924 <br />6 0 1,012 924 ~ <br />6 $1,700 $11,762 $22,274 <br />__ - - _ <br />Comments <br />VIC - verify <br />2.57 <br />Ground Level Tenant Improvements Detail Estimate - Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.