Laserfiche WebLink
<br />Courthouse Square ----- _ _. _ _ -- - - _ -- <br />Architectural Cost Consultants, LLC _ .. __ <br />Estimate Date: R21-Aug-98 <br />Court & High Street James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98 <br />Salem, Oregon 6441 SW Canyon Court, Suite 103 Print Date: 21-Aug-98 <br />Arbuckle Costic Architects, Inc Portland, Oregon 97221 Print Time: 11:42 AM <br />Design Development Probable Cost Estimate Phone (503) 297-7210 Fax (503) 297-7187 __ Construction Start: Spring 99 <br /> <br /> <br />Ground Level _-- . _ . . ___ <br />_ _ __ _ <br />County 2,532 <br />Transit 6,572 <br />Conference Center 4,826 <br /> <br />, Total Area _ _....- - - <br />13,930 sf <br />Ground Level Tenant Finishes f Quantity Unit CosUUnit Cost __ Total " Comments <br />WOOD 8 PLASTICS <br />Casework - Continued <br />secure <br />base cabinet 9.0 If 165.00 1,485 <br />audio / visual <br />base cabinet 12.5 If 165.00 2,063 <br />counter 17.0 If 90.00 1,530 <br />ante <br />rod & shelf 5.0 If 20.00 100 <br />assembly <br />base cabinet 8.0 If 165.00 1,320 <br />side table ~ 11.0 If 275.00 3,025 <br />curved front counter ~ 25.0 If 350.00 8,750 <br />, conference ctr lobby <br />~ cabinet 6.0 If 250.00 1,500 <br />Subtotal <br />TOTAL - WOOD & PLASTICS <br /> 0 1,485 0 <br /> 0 0 2,063 <br /> 0 0 1,530 <br /> 0 0 100 <br /> 0 0 1,320 <br /> 0 0 3,025 <br /> 0 0 8,750 <br /> 0 0 1,500 <br />47,613 0 27,330 20,283 <br />557,003 $506 $28,644 $27,852 <br />~ <br />i <br />I <br />3.42 <br />4.09 ~ <br />__ _ _ _ _ _ _ -- - - - - - _---- -- _ _ _ _ .- -- <br />I MOISTURE - THERMAL CONTROL ~ <br />- -- _ ____ <br />I Firesafing <br />allowance 13,930 sf 0.04 <br />Subtotal <br />I; Caulking & Sealants <br />~ caulking / sealants i 13,930 sf 0.13 <br />Subtotal ~ <br />- - - <br />, TOTAL - MOISTURE - THERMAL CONTROL <br />500 91 236 173 <br />500 <br />1,800 91 <br />327 236 <br />849 173 <br />624 <br />1,800 ~ 327 849 624 <br />52,300 ___ $418 _- -$1,085 $797 <br />Ground Level Tenant Improvements Detail Estimate - Page 2 <br />~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ <br />